Dust Control, Brenda Mines Limited, Peachland B.C.By J. W. Austin
"Introduction The Brenda dust collection system was originally designed to handle air at the 5000 ft. elevation with less than 1 grain of dust per cubic feet of air handled. The temperature variation
Jan 1, 1976
-
Meeting Recruiting Challenges - Victor ProjectProject Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;
May 1, 2006
-
Production Simulation Overview and Case Study: Coleman 170 OrebodyBy Scott Hopkins
Simulation tools are preferred for evaluating complex systems due to its ability to mimic reality and quickly evaluate many different what-if scenarios and find global solutions. A simulation model is
May 1, 2008
-
Building Nunavut?s First Diamond Mine: The Jericho Diamond Mine Canada?s Third and Nunavut's First Diamond MineProject Details ? Located 420 km northeast of Yellowknife, Northwest Territories ? Jericho kimberlite discovered in 1995 ? Feasibility study showed +3,000,000 carats recovered from 2.6 million to
May 1, 2006
-
Low-gravity separation - Part 1By B. W. Clyburn
"Coals from the Corporation's Lingan and No. 26 mines are classified as high-volatile A bituminous, with a very low inherent ash and containing all essential properties to provide metallurgical coal,
Jan 1, 1985
-
Forage ITH à Haute Pression à la Mine GoldexBy Patrick Frenette
Résumé La Mine Goldex entrera en production au 2ième trimestre de 2008. Pour permettre une production de l?ordre de 6960 tpj, le forage ITH à une pression de 400 psi (28 bar) à été sélectionné. Il s
Feb 1, 2008
-
An Overview of the Design, Construction, Commissioning and Early Years of Operation of the SAG/Ball Mill Grinding Circuit at Phu Kham Copper, Gold Operation in LaosBy J. B. Hadaway
The operation at Phu Kham commenced design and construction in early 2006 and was commissioned in May 2008. This paper will examine and discuss the project from the inception of flow sheet development
Jan 1, 2012
-
How Should Mining Companies Select the Optimal Portfolio of Production Projects Considering the Risk of their NPVBy Júlio C. Lúcio
Consider the case of a mining company with N investment opportunities in projects of different commodities. The problem is: since the company has limitation of capital, equipments, technical staffs, e
May 1, 2009
-
Transforming Flow Sheet Design with Inert Grinding – the IsaMillBy K. E. Barnes
"The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin
Jan 1, 2006
-
The Red Dog VIP mill optimization project. Part B: An integrated approach to modelling and design of the flotation plantBy B. K. Gorain, A. W. Stradling
"The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h
Jan 1, 2003
-
Regulation and the Regulatory Process in the Mineral IndustryBy F. C. Lendrum
"This paper had its origin in a panel discussion organized by the Canadian Uranium Producers Metallurgical Committee (CUPMC) at their Annual Meeting in Blind River in May, 1964. The reason for the pan
Jan 1, 1986
-
Paste Fill Plant Operation at the Louvicourt MineBy Benoit Bissonnette
"The need for production of a competent fill was recognized early by the project partners. Consequently, a 4000 Ud paste fill plant was constructed and commissioned in early August 1994.In order to fi
Jan 1, 1996
-
Estimation of Iron Ore Resources Integrating Diamond and Percussion DrillholesBy Jacques Deraisme
The technology of percussion drilling is well mastered. The lower cost of percussion drilling allows more holes to be drilled for the same budget. However significant differences are often observed be
Oct 1, 2009
-
Plenary Presentation “Electrons to Dollars” - The Real Value In Geometallurgical OperationsBy K. J. R. Ford
"Significant advances in mining and metallurgical operations have occurred over the last two decades, to define ore bodies via geological mapping, mineralogical analyses, geostatistical models and res
Jan 1, 2013
-
Production of Ultrafine Ferrite Using Designed ExperimentsBy D. K. Matlock, D. J. Hamre, J. G. Speer
Ultrafine ferrite (UFF) grains may be produced in surface layers of plate steels using controlled intermediate cooling followed by deformation. Experiments were conducted using a 0.12 C - 1.26 Mn stee
Jan 1, 2004
-
Quantifying the Effects That Changes in Transmitter-Receiver Geometry Have on the Capability of an Airborne Electromagnetic Survey System to Detect Good ConductorsBy C. Samson, R. S. Smith, S. W. Hefford
"Abstract - Time-domain electromagnetic systems are most sensitive to highly conductive targets during the transmitter on-time. Data collected during the on-time is highly influenced by the geometric
Jan 1, 2006
-
The Systematic Reclamation of Gold Mine TailingsBy Jean-Claude LeRoy, Herman Keller
"INTRODUCTIONEROCON's work is the reclamation of mine wastelands. It has had considerable experience in particular in the reclamation of gold mine tailings in the Canadian Shield since the latter part
Jan 1, 1975
-
The Optical Properties of Mixed Au and Pt Nanoparticle ColloidsBy Daven N. Compton
The optical properties of Au nanoparticles have been known for some time, with both Au colloids and Au nanoparticles embedded in glasses having been extensively studied. In this study, Pt nanoparticle
Oct 1, 2003
-
Seismic source parameters used to monitor rockmass response at Brunswick MineBy B. Simser
Noranda?s Brunswick mine is a 10 000 t/d producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stoping technique
May 1, 2004
-
Seismic source parameters used to monitor rockmass response at Brunswick mine (5a673da7-13e1-42d4-880a-c4441be71d76)By B. Simser, V. Falmagne
"Noranda’s Brunswick mine is a 10 000 t/d producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stoping techniqu