Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Characterising Liberation and Flotation Potential Using Image Analysis, Simulated Fragmentation and Small-Scale Flotation

    By J Hunt

    A critical aspect of geometallurgy is quantifying mineralogical and textural relationships that affect mineral processing (eg, liberation and recovery). However, to date, this has been an expensive an

    Sep 5, 2011

  • AUSIMM
    The Effect of Ore Type, Depth, and Leach Time on Cyanide Species in Column Tests Using NaCN Leach Solutions

    By Hendrix JL, Nelson JH

    Three ores (sulfidic, oxidized and carbonaceous) were analyzed to determine the effects of leaching time, ore depth, and ore mineralogy on cyanide species concentration. NaCN solutions were percolat

    Jan 1, 1988

  • AUSIMM
    A Design Approach for a Swelling Rock in an Underground Mine in Turkiye

    By Yesil MM, Bozdag T

    The swelling process is an impor- tant problem causing damages to the structures in or on swelling rocks, both during construction and operating life. To understand swelling problem, a number of t

    Jan 1, 1992

  • AUSIMM
    Mining Investment: How Industries Past Performance Limits Future Possibilities (f8b98dc1-634e-42f5-b01b-bb3f8c321828)

    By Turner R. B

    The authors have studied and analysed many mineral resource and related projects in Australia. These studies have lead them to conclude that the past performance of many project developers does p

    Jan 1, 1980

  • AUSIMM
    Use of Pre-splitting Technique as an Alternative Approach to Cost Optimisation in Tunnel Excavation

    By Guvenir HA

    This paper summarises a cost optimisation procedure by minimising the total drill metres and the overbreak that occurs in tunnel excavation in medium strength rock (uniaxial compressive strength

    Jan 1, 1995

  • AUSIMM
    Commissioning and Operation of the 800 TPH Heavy Medium Cyclone Plant at Mount Isa Mines Limited

    By Pease JD, Munro PD

    The heavy medium cyclone plant for the preconcentration of silver-lead-zinc ore prior to grinding and flotation was commissioned in August 1982. This paper details the measures taken to get the pl

    Jan 1, 1984

  • AUSIMM
    Feasibility Study Estimation of In-Situ Resources and Recoverable Ore Reserves for the Boddington Gold Mine

    By El-Ansary M

    Estimation of in-situ resources and recoverable ore reserves for the Boddington Gold Mine feasibility study was done by applying an essentially "classical" ore reserve method. This relied completely

    Jan 1, 1987

  • AUSIMM
    Foresight Project - Minerals and Mining Sector Strategy: Vision for 2010

    By R G. Barker, A B. Christie

    Minerals are necessary for providing almost everything we take for granted in our daily lives including food, shelter, and supplies of energy and water. Minerals are therefore essential for the mainte

    Jan 1, 1998

  • AUSIMM
    Mine Dewatering and Water Disposal Bendigo Goldfield

    By Showers JAF

    The Western Mining Corporation mining lease on the Bendigo Goldfield measures 5krri x 18km with more than 20 anticlinal folds parallelling th long north-south boundaries. Numerous closely spaced sha

    Jan 1, 1988

  • AUSIMM
    Digital Blasting - An Opportunity to Revolutionise Mass Underground Mining

    This paper discusses how the i-kon TM Digital Energy Control System may be deployed by miners of massive underground orebodies to deliver significant advantage in terms of safety, cost and environment

    Jan 1, 2000

  • AUSIMM
    Production Blasting Practice at Hamersley Iron Pty. Limited

    By Kaleta S, McTavish LP, Turner RD

    Primary production blasting at Hamers- ley Iron began with seven inch holes at Tom Price in 1966 and has developed since then to large multiple row shots of 381 mm holes at Tom Price and 311 mm at

    Jan 1, 1978

  • AUSIMM
    The Imperial Smelting Furnace-Hearth and Raceway Considerations

    Consideration is given to the factors affecting raceway activity and the hearth design of a zinc-lead blast furnace. Results of measurements made on operating furnaces are given and comparisons ar

    Jan 1, 1981

  • AUSIMM
    Economic Effects of Increased Productivity - Higher Profits or Lower Prices?

    By Tronson K

    Improvements in technology do not necessarily lead to higher profits: the benefit of lower costs can be captured by coal buyers, governments and workforce rather than by the colliery operators. Th

    Jan 1, 1988

  • AUSIMM
    Aerodynamic Studies of Shaft / Airway Intersection Losses and Mine Cage Resistance

    By Wilson PH

    A research programme sponsored through the Australian Mineral Industries Research Association investigated two aspects of mine aerodynamics on model scale. These were aero- dynamic losses in (a) sh

    Jan 1, 1978

  • AUSIMM
    Size Classification at the Mt. Newman Mining Beneficiation Plant

    By Groves J

    The sizing and classification circuits at the Mt. Newman Beneficiation Plant have performed satisfactorily. Investigations have been aimed at solving minor problems and achieving small' impro

    Jan 1, 1984

  • AUSIMM
    Using Waste From Sand Mining to Reduce Environmental Impacts Coming From the Stocking Process

    By L Soares, W T. Hennies, F Fujimur

    Barra Bonita reservoir, located in the Sao Paulo State, Brazil, has been mainly used for local navigation and electricity generation to supply a prosper region in the country. Sand mining activities i

    Jan 1, 2003

  • AUSIMM
    Characterisation and Correlation of Volcanism in the McArthur Basin and Transitional Domain, NT

    By D J Rawlings

    The Palaeo- to Mesoproterozoic McArthur Basin contains a thick (-10 km) intracratonic platform cover sequence of unmetamorphosed and relatively undeformed sedimentary and volcanic rocks (Pietsch et

    Jan 1, 1994

  • AUSIMM
    Reverse Circulation Drilling

    Reverse circulation (R.C.) drilling or the dual tube method as it is quite commonly known, has a unique place in conventional mineral drilling. It can be classified half-way between open hole drilling

    Jan 1, 1986

  • AUSIMM
    Gas and the Mining Cycle

    Natural gas from the south west Queensland gas fields is now available in north west Queensland to fuel the development of many Carpentaria Mineral Province projects. Like these projects, the south we

    Jan 1, 1998

  • AUSIMM
    Rehabilitation Planning For The Yallourn East Field

    By Brown K, Francis D

    The Yallourn Open Cut Mine has recently commenced mining operations in the new East Field which will supply the 1450MW Yallourn W Power Station for the rest of its 30 year design life. The authors des

    Jan 1, 1992