A Systems Approach to the Integration of Heap Leach and CIP in Gold Ore Processing

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 4
- File Size:
- 399 KB
- Publication Date:
- Jan 1, 1992
Abstract
A methodology is described to integrate heap leaching into a CIP operation. The paper firstly describes what is meant by a 'systems approach'. A broad view of the objectives of integration of heap leaching into CIP is given, followed by the components of the system, and then a description of the methodology for integration. The seven stages of integration are given as determination of distribution of gold, sampling, metallurgical testwork, conceptual study, pilot heap operation, pit modelling and pit optimisation. The final result is a series of optimised curves which determine the maximum value of the orebody, and the optimum cut-over grade from CIP to heap leaching.
Citation
APA: (1992) A Systems Approach to the Integration of Heap Leach and CIP in Gold Ore Processing
MLA: A Systems Approach to the Integration of Heap Leach and CIP in Gold Ore Processing. The Australasian Institute of Mining and Metallurgy, 1992.