Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Technical Note - The Incorporation of Ash Content into Gas Content Measurement

    By Mahoney M

    For gas content analysis in recent years, it has been standard procedure to report results on a 'dry ash free' (daf) basis, under the assumption that gas only adsorbs onto coaly material. In

    Jan 1, 1995

  • AUSIMM
    The Charging of Slurry Explosive with the Nitro Nobel Cartridge Loader at the Mount Lyell Mining and Railway Co. Ltd., Queenstown, Tasmania

    By Wilson J. R

    The main mining method employed at Mt Lyell is sub-level open stoping with a typical extraction level interval of 100 m and sub-level intervals of 30 m. Currently, pillar blasts provide the major p

    Jan 1, 1977

  • AUSIMM
    Rock Breaking on the Melbourne Undergroudn Rail Loop

    Techniques and results achieved during the excavation of the Melbourne Underground Rail Loop (HURL) are summarised and discussed in the context of the various restraints present in a typical urban

    Jan 1, 1978

  • AUSIMM
    Sedimentary Structures in Lower Proterozoic Rocks, Barrier Ranges, N.S.W.

    During mapping in the Bijerkerno area (Fig. 1), well-preserved sedimentary structures were found at three separate localities. The structures are of four varieties, which are 1. small-scale cross-bedd

    Jan 1, 1971

  • AUSIMM
    Review of Methane Emission and Prediction Research in Longwall Coal Mines

    By Anderson J. M, Gillies A. D S, Jones N

    There are a number of current theories in relation to methane migration and emission into workings following underground coal mining activity and some controversies do exist. Mining causes changes in

    Jan 1, 1992

  • AUSIMM
    The Peak Hill High Sulphidation Gold Deposit, NSW (b7de7a3e-9b00-482f-8de6-d6281ddb9569)

    By Corbett GJ, Leach TM

    ABSTRAC'T' Although hosted within an Ordovician magmatic arc, the Peak Hill high sulphidation system displays features typical of younger Pacific Rim high sulphidation epithermal gold depos

    Jan 1, 1995

  • AUSIMM
    Paper No. 196. The Water Flume Conveyors of The Mount Lyell Mining And Railway Company Limited.

    THE power requirements of the Mount Lyell Mining and Railway Company at Queenstown, Tasmania, have, since the inception of smelting operations in June, 1,,896, been derived continuously from the exten

    Jan 1, 1911

  • AUSIMM
    The Mineral Equation

    It is my pleasure to deliver the first Keynote Address to the first joint conference between The Australasian Institute of Mining and- Metallurgy and The American Institute of Mining, Metallur- gic

    Jan 1, 1978

  • AUSIMM
    Thiosulphate Complexing of Gold and Silver During the Oxidation of a Sulphide - Bearing Carbonate Lode System, Upper Ridges Mine, P.N.G.

    In the humid, subtropical climatic conditions, typical of Papua New Guinean high-lands, auriferous carbonate-quartz lodes and stockwork veins of the Upper Ridges mine at Wau, have weathered in situ fo

    Jan 1, 1984

  • AUSIMM
    Further Thoughts on the Application of the Volcanogenic Theory to the Golden Mile Ores at Kalgoorlie

    Some mqre facts and inferences are presented in amplification of a recent paper on the geology of the Kalgoorlie Golden Mile stressing the volcanic origin of its rich gold ores, some of which are cons

    Jan 1, 1976

  • AUSIMM
    A Novel Solvent Extraction Process with Bottom Gas Injection in a Horizontal Contactor

    A novel solvent extraction process, called the SOHNEX process, has been developed at the University of Utah. In this process, the organic and the aqueous phases flow countercurrently in a horizontal v

    Jan 1, 2000

  • AUSIMM
    The Geologist in an Operating Mine

    Mining, like most other businesses, is based upon capital assets; and the primary cap- ital of any mining company is its ore reserve. A company's survival and growth is, thus, dep- endent upon it

    Jan 1, 1975

  • AUSIMM
    Improving Health and Safety Through Conveyor System Training in a Virtual Environment

    By R Engle, R P. McMahan, D A. Bowman, S Schafrik, W Thabet

    Preventing injuries and fatalities related to conveyor system use in the mining industry is important and increases uptime while decreasing lost time. The research presented here is funded by the Nati

    Jan 1, 2008

  • AUSIMM
    Drillling Patterns and Ore Reserve Assessments

    By Watson D. F

    Armstrong's (1983) criticisms of PhiIip and Watson's (1982b) note on optimal drilling patterns are based on misinterpretation, supported by errors in geometry. Furthermore, Armstrong argues

    Jan 1, 1984

  • AUSIMM
    Application of Unique SONAR Array Based Process Monitoring Measurement Equipment for Process Throughput/Efficiency Improvements and Measurement Point Cost Reduction

    By C OÆKeefe, A Thomas

    Boom time in the mining industry has presented mill operators with several unique challenges including the need for increased throughput while being constrained by a shortage of skilled labour and agi

    Jan 1, 2009

  • AUSIMM
    The Formation of Bubble Clusters in Flotation Cells ù Effect of Impeller Speed

    By G J. Jameson, A Agarwal

    This paper is concerned with the observation and analysis of bubble clusters in a laboratory flotation cell. A device was used in which bubbles were allowed to rise in clean water containing the same

    Jan 1, 2005

  • AUSIMM
    Improved Operating Efficiency at Mount Percy Through the Use of Oxygen in Cyanidation

    By Thomas L, Archibald N

    The use of oxygen in the Mount Percy cyanidation circuit was investigated, with the aim of improving recovery. Preliminary batch and plant testwork justified a plant trial, and it was demonstrated tha

    Jan 1, 1992

  • AUSIMM
    The Tolukuma Au/Ag vein system, Papua New Guinea

    By Semple DG, Leach TM

    A continued exploration programme has further defined the geology of the Tolukuma vein system, verified the resource indicated by Newmont, and identified potential for additional mineralisation. The r

    Jan 1, 1994

  • AUSIMM
    Pemali Open Pit Mine Slope Stability Problem

    By Bhattacharyya A. K>

    The Pemali Open Pit Mine is situated in a small island called Bangka in Indonesia. It produces approximately 165,000 m3/year of tin ore with an average grade of 3.67 kg/m' of tin from a primary

    Jan 1, 1989

  • AUSIMM
    Reducing the Variability in Dragline Operator Performance

    Australian coal mines have spent considerable capital on dragline improvements over the last two years. This has included ~$30 M on UDD conversions, >$20 M on new buckets, boom upgrades, electrical up

    Jan 1, 2005