Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of Sampling and Assaying Protocols at the New Bendigo Gold Project, Victoria, Australia

    By S C. Dominy

    The Bendigo Goldfield is located in the state of Victoria, Australia, and is one of a number of quartz-reef fields that make up the greater Central Victorian Goldfield. At Bendigo gold particles are c

    Jan 1, 2005

  • AUSIMM
    Hydraulic Boulder Fragmentation Using Small Explosive Charges

    By P Worsey, B Lane

    The recommended maximum explosive weight for boulder blasting using internal charges is 0.15 kg/m 3 (Olofsson, 1988). Normally this charge results in excessive scattering and flyrock, creating increas

    Jan 1, 1999

  • AUSIMM
    Geomechanics Considerating In Optimistc The Use Of Mine Fill Part B

    By Kurzeme M, Willoughby D. R

    Current research at the CSIRO, Division of Applied Geomechanics, into the mode of response of fill as a structural component has been based on model tests for prediction of behaviour and field obs

    Jan 1, 1973

  • AUSIMM
    Alkali Emission Reduction and Measurement at Queensland Alumina Limited (QAL)

    By T Connor

    Alkali emissions are one of the environmental challenges facing alumina refineries. Queensland Alumina Limited (QAL) is undertaking a number of initiatives to continuously improve its environmental pe

    Jan 1, 2005

  • AUSIMM
    æDryÆ Granulation of Slags for Producing Cement Binder

    By B, T Norgate, S Sanetsis, R Davidson

    Global cement production accounts for about five per cent of man-made CO2 emissions (WBCSD, 2002). Such operating practices will increasingly be considered unsustainable, unless significant reductions

    Jan 1, 2004

  • AUSIMM
    Carbon-in-Pulp in South Africa

    The carbon-in-pulp (CIP) process is now well established in the South African gold industry, with a total of over I million metric tons of material being treated each month in six large plants. This

    Jan 1, 1982

  • AUSIMM
    Coal - Paper No. 11 Various Interpretations Of Coal Petrographic Nomenclature And Their Effects On Maceral Analysis

    By Diessel C. F K, Ng N

    The commonly used Stopes-Heerlen coal petrographic classification and nomenclature has over the years been subject to variable interpretations. This paper discusses the problem with specific refere

    Jan 1, 1969

  • AUSIMM
    Water Supply at the Warrego Mine, Tennant Creek, Northern Territory (533fe125-f87f-451f-a8a7-f8cc9efcc262)

    By Ride G

    The provision of a water supply is a major consideration in planning mining developments particularly in remote areas. The evaluation and development of adequate water supplies in and areas of Aust

    Jan 1, 1980

  • AUSIMM
    Ore Treatment at Renison Limited

    Renison Limited produces high and low grade tin concentrates at an annual rate of 5000 tonnes of contained tin metal. In spite of the fine average cassiterite grain size, emphasis is placed on grav

    Jan 1, 1977

  • AUSIMM
    Favona Project - Appraisal to Development

    The Favona Underground Project is located approximately two kilometres east of Martha Mine Open Pit in Waihi, 150 km south east of Auckland, New Zealand.   The underground reserve of 354 koz Au c

    Jan 1, 2004

  • AUSIMM
    Improved Jarosite Process

    By BTrubT M

    In the roast-leach-electrolysis process for the production of zinc, iron contained in zinc concentrates is converted to zinc ferrite during roasting. At Canadian Electrolytic Zinc (CEZinc), the Outo

    Jan 1, 1993

  • AUSIMM
    The Electrostatic Precipitation of Suspended Particles from Gases

    By Marshall K. I

    THE problem of satisfactorily eliminating the fumes and dust which are unavoidably produced in various metallurgical and manufacturing industries is one which has received considerable attention in th

    Jan 1, 1923

  • AUSIMM
    Contract Mining: Optimising Mining Performance and Efficiencies

    New Zealand contract mining has been well established for close to 50 years. The opencast industry has grown from mining quantities of less than 1 million bcm per year in the 1950s to around 20 millio

    Jan 1, 1997

  • AUSIMM
    Residue Treatment Plant Practice at Risdon, Tasmania

    By Garrigan J. S, Oakes I

    Current operating practice in a plant commissioned some five years ago to treat ferritic zinc plant residue by the "Jarosite" process is described. Major problems overcome include obtaining reliabl

    Jan 1, 1977

  • AUSIMM
    Shaft Sinking at Foster - Kambalda Nickel Operations

    Western Mining Corporation began shaft sinking operations at it's Foster orebody, south of Kambalda, on the 20th June, 1984. The top levels of the orebody are currently being mined via a decline

    Jan 1, 1985

  • AUSIMM
    Provision of a Gallery for Investigation of Coal Mine Explosions at Londonberry Centre

    The explosion at Appin Colliery on July 24th, 1979, demonstrated the need for a large scale facility to simulate an underground type explosion and study its effects. The effects of an explosion can

    Jan 1, 1981

  • AUSIMM
    The Argyle Process Plant Control System

    By Weber D, Knox PR

    The criteria developed for the Argyle Diamond Mine process plant control system are reviewed. The control system installed is described along with a discussion of the method of implementation adop

    Jan 1, 1986

  • AUSIMM
    Northparkes Mines ù Design, Sudden Failure, Air-Blast and Hazard Management at the E26 Block Cave

    By A van As

    This paper serves to outline the circumstances and causes of the air-blast that occurred at Northparkes Mines in November 1999. It describes the design of the mine, the geotechnical issues surrounding

    Jan 1, 2005

  • AUSIMM
    The Newcrest Telfer Hoisting System ù A Very Large Friction Hoist Installation

    The hoisting system at the Newcrest Telfer mine is designed for a final duty of 7.35 million tonnes per annum at a hoisting distance of 1450 m. In terms of hoisting capacity (t/h) times hoisting dista

    Jan 1, 2005

  • AUSIMM
    The Geology of the Browns Creek Gold-Copper Skarn Deposit, Blayney, NSW

    By Wilkins C

    The Browns Creek deposit is located 8 kin west of Blayney and 220 km west of Sydney (Figure 1), at lat 33¦32'S, long 149¦10'E on the Bathurst (SI 55-8) 1:250 000 scale map sheet. The total

    Jan 1, 1997