Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case Study

    Throughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c

    Nov 25, 2010

  • AUSIMM
    From Banded Iron Formation to Iron Ore – Genetic Models and Their Application in Iron Ore Exploration in the Hamersley Province, Western Australia

    By H J. Dalstra

    High-grade iron ore may be derived from banded iron formation (BIF) through four fundamentally different processes:1. syngenetic precipitation of chert free BIF,2. residual enrichment by removal of ga

    Jul 11, 2011

  • AUSIMM
    High shear rotor trials in the Mount Isa Mines Copper Concentrator

    By H Law, M Muller

    Mount Isa Mines (MIM) Copper Concentrator currently utilises Agitair 120 banks for its roughing flotation circuit. Apart from a rotor change, the only other significant work completed to the Agitair b

    Aug 29, 2018

  • AUSIMM
    Redevelopment of the Morning Star Gold Mine - ABSTRACT ONLY

    Morning Star Gold aims to enter the ranks of Australia's gold producers, revitalising the Eastern Victorian Goldfi elds in the second half of 2010 - the fi rst gold production in around 50 years

    Aug 1, 2010

  • AUSIMM
    The evolution of production blasts at Ernest Henry Mine

    By C te Kloot, Z Liu

    Blast performance and the resulting drawpoint condition and volume of oversize has the potential to impact operator safety and mine productivity. Underground measurements showed that approximately 14

    Oct 16, 2017

  • AUSIMM
    Mount Morgan Gold-Copper Deposit:: The 1992 Perspective

    By Dean J. A, Taube A, White A. H, Messenger P. R, Jones I. W O, Huston D. L

    The 50 million tonne Mount Morgan gold-copper deposit (4.99 g/t Au, 0.72 per cent Cu) was an irregular pipe-like body of quartz and pyrite, with subordinate chalcopyrite, magnetite and gold. Mineralis

    Jan 1, 1993

  • AUSIMM
    Selection of undrained shear strength parameters of residual soils and their application in stability analysis

    By Y Xu, T Rowles, B Dareeju, A Dissanayake

    Recent updates on tailings dam design guidelines require analysis of undrained (short-term) stability with the application of the SHANSEP model. The SHANSEP model, which was originally developed for a

    Jul 1, 2021

  • AUSIMM
    A 3D Discrete Event Simulation Model of a Truck-shovel Network System

    By W Zeng, D Walker, D Cai, E Baafi

    "The efficiency of the truck-shovel haulage system is significantly influenced by the truck fleet size. A discrete event simulation model with 3D animation has been developed to estimate the productiv

    Nov 15, 2016

  • AUSIMM
    Gold Recovery on the Shotover River

    Gold was first discovered on the Shotover by Thomas Arthur in 1862, and soon there were over 3000 miners working on the river. It has often been called the richest river in the world. Most countries p

    Jan 1, 1983

  • AUSIMM
    A Scoping Study on Fibre Optic-Based Temperature Monitoring of Underground Coal Conveyor Belts

    By B Yang, S M. Aminossadati

    Transporting coal by means of conveyor belts is very common in Australian underground coal mines. Major conveyor belt-related mining incidents are now relatively infrequent as a result of recent impro

    Jul 1, 2013

  • AUSIMM
    A New Method for Rapid Vertical Development of Underground Ventilation Shafts

    By R Markoski, P Grealish

    The requirement for rapid vertical development for underground ventilation is often a factor when dealing with dynamic mine plans, with short vertical developments being used to optimise ventilation s

    Sep 17, 2014

  • AUSIMM
    Validation of Resource Models - Myths, Materiality and Modern Approaches

    We are moving into an era where we experience the consequences of the skills crisis û namely many resource models have been generated by inexperienced people under pressure to deliver high quality res

    Jan 1, 2009

  • AUSIMM
    Review of Australian Longwall Panel Ventilation Practices

    By S Gillies, H W. Wu

    A study has been undertaken into mine ventilation systems currently in use within Australian modern coal longwall (LW) extraction mines. It reviews systems and discusses evolving changes being adopted

    Jul 1, 2013

  • AUSIMM
    Processing of Magnetite Iron Ores - Comparing Grinding Options

    By A Jankovic, D David, P Payne

    Although the majority of current steel production is supported by iron ore sourced from high-grade haematite deposits, the long-term growing demand for steel has led to higher raw material prices and

    Jan 1, 2009

  • AUSIMM
    Blasting Logistics at Rio Tinto Coal Australia's Hail Creek Mine

    In March 2003, Rio Tinto Coal AustraliaÆs (RTCA) new Hail Creek open cut coal mine commenced operations in the Bowen Basin. Hail Creek is a two-seam strip mining operation utilising two 90 m3 dragline

    Jan 1, 2007

  • AUSIMM
    Exploration of the Horn Island Gold Deposit, Torres Strait

    The Horn Island gold and mineral field produced 194 kilograms of gold in the 4 years subsequent to its discovery in 1894, from an area of shallow workings 1.5 kilometres x 0.5 kilometres. Gold deposit

    Jan 1, 1986

  • AUSIMM
    Adequacy of Sampling and Volume Estimation for Premining Potential Acid Forming Waste Evaluation Using Statistical and Geostatistical Methods

    By A Garvie, D Kentwell, J Chapman

    "Most new mining projects require an initial assessment of the locations and volumes of potential acid forming (PAF) waste that is likely to be moved and dumped in surface waste stockpiles. This requi

    Jul 10, 2012

  • AUSIMM
    The Role of Geology and Exploration Within the Mining Cycle at the Osborne Mine, NW Queensland

    By P Voulgaris

    The Osborne Mine commenced production from an open pit in December 1994 with the first ore being hauled from underground one year later. Currently all ore is hauled up a decline by trucks until the sh

    Jan 1, 1998

  • AUSIMM
    Optimisation Challenges in Underground Mine Planning and Design

    Underground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab

    Dec 6, 2010

  • AUSIMM
    Optimum Equipment Management Through Life Cycle Costing

    Large mining operations need equipment that consistently performs as expected. The most effective way of ensuring this is to have a defined life cycle with an optimised maintenance strategy. The deter

    Dec 6, 2010