Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    World-Class IOCG Deposits and Potential Deposits in South Australia

    By P S. Heithersay, M McGeough

    The discovery of Olympic Dam in 1975 and, more recently, Prominent Hill in 2001 and Carrapateena in 2005 demonstrates the potential for world-class IOCG deposits in South Australia. Potential for furt

    Jan 1, 2007

  • AUSIMM
    Physical and Mechanical Characterisation of Paste Backfill by Laboratory and In-Situ Testing (6467738c-7044-43a0-9a73-ca12bdc18202)

    By Bidwell TJ, Servant S

    Paste back-fill technology is gaining rapid acceptance in the Canadian mining industry. The authors were able to work on four different mining sites employing paste technology in their operation. In

    Jan 1, 1998

  • AUSIMM
    Laboratory Calibration and Initial Results of a Soil Moisture Monitoring System at the Mt Leyshon Tailings Dam and Waste Rock Cover System

    By R Neivandt, Kane, M O&apos, D Browne

    Newmont Australia is the operator of the Mt Leyshon mine near Charters Towers, Queensland. Mt Leyshon is an open cut gold mine, which processed on average 5.0 Mt of ore and produced up to 250 000 ounc

    Jan 1, 2003

  • AUSIMM
    Strong Acid Leaching and Filtration of Lead/Silver Residue

    By Adams R. W

    A commercial scale strong acid leaching plant was commissioned at the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, a member of the Pasminco group of companies, in February

    Jan 1, 1989

  • AUSIMM
    Post-mining Land Use Options in the Appalachian Coal Mining Region of the USA

    By J Skousen, C E. Zipper

    "Prior to the 1950s in the USA, surface coalmines were generally left without any reclamation. As government regulations advanced, mine operators were required to backfill the area and plant grasses o

    Jul 16, 2014

  • AUSIMM
    Development of new performance prediction models for a raise boring machine based on indentation tests

    By C Balci, D Tumac, A Sheterpour-Mamaghani, E Dogan, A Kocbay, T Erdogan, A Gumus, H Copur, E Altintas

    Excavation of vertical and/or inclined shafts in the underground structures requiring careful design and planning. Raise Boring Machines (RBMs) are commonly used for excavation of shafts for different

    Nov 29, 2022

  • AUSIMM
    Telfer Project Process Plant Design

    By R Dunne, G Lane, S Ha, D Dreisinger

    The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine

    Jan 1, 2003

  • AUSIMM
    Building a Geometallurgical Model for Early-Stage Project Development – A Case Study from the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru

    By R Baumgartner

    The Canahuire deposit is a recently discovered Au-Cu-Ag epithermal deposit in Southern Peru. A geometallurgy program is a key study element of the project Feasibility study. Metallurgical, mineralogic

    Sep 5, 2011

  • AUSIMM
    Mineral Taxation Policies and Practices Around the Pacific Rim

    This paper examines some of the important aspects of mineral taxation policies and practices, with reference to the mining tax regimes of selected Pacific Rim countries (see Tables 1 and 2). The follo

    Jan 1, 1999

  • AUSIMM
    Taxonomy of Interactive Computer-Based Visualisation Systems and Content for the Mining Industry û Part One

    By C Caris, K Fowle, M Schmid, E van Wyk, D Schofield, A Squelch, M S. Kizil

    This paper has been written collaboratively by members of the International Mining VR Group. It is the first of a series of papers. Mining in the 21st century is a high technology industry that strive

    Jan 1, 2008

  • AUSIMM
    The Integration of Geometallurgy with Plant Design

    By G Harbort

    Traditional engineering design for flotation circuits use the “Rule of Thumb” approach. Typically this uses a nominated maximum head grade for design. A scale-up factor is applied to laboratory flotat

    Aug 8, 2011

  • AUSIMM
    A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction Activities

    By D Davis

    The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi

    Mar 8, 2011

  • AUSIMM
    Integration of Geoblast and D&B Engineering as an engineering tool in PT. Indo Muro Kencana

    By H Utama, hi, A Suw

    PT. Indo Muro Kencana (PT.IMK) is gold and silver mine located in Central Kalimantan province, Indonesia. Mining activities in PT.IMK is conducted in Bantian pit area by applying surface mining method

    Nov 29, 2022

  • AUSIMM
    Phytostabilisation and Phytomining – Principles and Successes

    By R L. Chaney, M Mahoney

    Mine and ore beneficiation wastes and smelter contaminated soils often cause phytotoxicity and threaten adverse environmental effects if not remediated. Science has clarified both the risks from soil

    Jul 16, 2014

  • AUSIMM
    Ensuring Professional Engineering Capability - Queensland Professional Engineers Act 2002

    The provision of professional engineering services in Queensland is regulated through the Professional Engineers Act 2002. The Act requires that anyone providing professional engineering services must

    May 1, 2010

  • AUSIMM
    Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western Australia

    By D R. Anstey

    The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from

    Jul 11, 2011

  • AUSIMM
    Technology change in underground mining – things to consider

    By A G. L Pratt

    Change and its relationship with the introduction of new technology is a constant of human history. The mining industry has many examples of this relationship. This record contrasts with its present d

    Oct 16, 2017

  • AUSIMM
    Recent Experiences at the Kangaroo Flat Mine, Bendigo

    By M Hernan

    Bendigo Mining Limited has established a modern underground gold mine and processing plant at Bendigo in central Victoria. The Bendigo goldfield produced around 22 000 000 oz of gold between 1851 and

    Jan 1, 2008

  • AUSIMM
    Activity Coefficient of Cobalt Oxide in Non-Ferrous Smelting Slags - A Review

    By S Jahanshahi, D R. Swinbourne

    A knowledge of the value of the activity coefficient of cobalt oxide in slag as a function of composition and temperature is necessary if effective strategies are to be devised to maximise the recover

    Jan 1, 1998

  • AUSIMM
    Modelling Mine Sustainability - Indicators Based on a Comprehensible Framework

    By A Lyon

    The minerals industry, as many other industries, has a wealth of indicators and a thriving æindustryÆ in their development, measurement and reporting. It is natural for this to occur for a new endeavo

    Jan 1, 2009