Search Documents

  • CIM
    Growth through Continuous Improvement - Heap Leach Processing and Gravity Expansion at Fort Knox Gold Mine

    By James L. Oleson, Hunter R. Propsom, Kevan J. R. Ford, Robert D. Henderson, Bob Musgrove

    "Kinross’ Fort Knox Gold mine, near Fairbanks, Alaska has successfully implemented two major metallurgical continuous improvement projects resulting in growth of gold production and an extension of mi

    Jan 1, 2011

  • NIOSH
    OFR-187-82 Phase Equilibrium Studies Of Refractory Oxide Systems - Part I: SrO-ZrO2-MgO And SrO-MgO-Dolomite

    By Charles E. Semler

    The possible utility of selected compositions in the systems SrO-ZrO2-MgO and SrO-ZrO2-Dolomite for commercial refractory products was confirmed in this study. Specifically the compositions of interes

    Jan 1, 1982

  • SME
    Our Efforts to Modernize an Archaic Mine Project Cost Estimating Software System

    By S. Stebbins

    In 1994 Western Mine Engineering, Inc., (WME), which is now InfoMine USA, Inc., set out to build a suite of stand-alone software programs that would provide their clients the means to estimate the cos

    Jan 1, 2019

  • SAIMM
    Barriers and drivers towards the approval and implementation of new technology in mining: A dilemma and exit strategies framework

    By B. Emwanu, R. A. Raju

    The implementation of new technology in mining can be likened to a paradoxical situation or dilemma, where, on one hand, major mining projects are not able to solicit investor funding unless it is pro

    Oct 24, 2025

  • AUSIMM
    Geomorphological and Geophysical Investigation of the Waste Dump Site, Porgera Gold Mine

    By Pilon CG, Deakin RC

    It is proposed that a waste rock dump be constructed on slopes consisting of soft colluvium and weathered Chim Formation mudstone at the Porgera Gold Mine, in Enga Province, Papua New Guinea (PNG)

    Jan 1, 1991

  • NIOSH
    OFR-99-81 Development Of A Through-The-Earth Monitor System

    The object of this program was to design and build a self-contained system for remote monitoring of the atmosphere in mines. The system developed uses the mine pager phone line as the primary communic

    Jan 1, 1980

  • SME
    Multi Mineral Cutoff Grade Optimization With Option To Stockpile

    The Cutoff grade optimization is very critical to the open pit production scheduling. In case of single mineral deposits, algorithms have been developed for determining cutoff grade policy that maximi

    Jan 1, 1997

  • AIME
    Butte Paper - Biographical Notice of John Fritz

    By Henry Sturgis Drinker, Rossiter W. Raymond

    Jan 1, 1914

  • SAIMM
    Winning Paper: Analysis Of Strike Gully Stability At Tautona Mine

    By J. Thompson

    Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree A study into the stability of strike gullies at TauTona mine was to be carried out. In reaching

    Jan 1, 2002

  • NIOSH
    IC 8398 Helium: Bibliography Of Technical And Scientific Literature, 1962 - Including Papers On Alpha-Particles

    By Philip C. Tully

    This bibliography contains 2,072 citations to technical and scientific literature about helium and alpha-particles abstracted by 12 abstract service publications during 1962. Citations are listed by 1

    Jan 1, 1969

  • SME
    Development Of New Process And Reagent For Flotation Of Graphite

    By G. M. Rao, P. N. Deo

    Graphite is soft and easily floatable but it is quite difficult to obtain high purity concentrate at coarse sizes. Chemical treatment can produce high grade concentrate but it is an expensive process.

    Jan 1, 1995

  • AIME
    Iron Ores on the West Coast of Chile

    By Joseph Daniels

    IN connection with a study of the feasibility of establishing a blast-furnace industry in the Puget Sound region of Washington, possible sources of ore supplies along the Pacific rim were investigated

    Jan 1, 1926

  • NIOSH
    OFR-81-76 Development Of An Automatic Fire Protection System For Mobile Underground Metal Mining Equipment

    By Gene R. Reid

    The contract objective is the development of an Automatic Fire Control System for Mobile Underground Metal Mining Equipment. The Phase I Report, which described the projected data handling plan, was p

    Jan 1, 1975

  • SAIMM
    Auburn Furnace Services

    By R. S. McDonald

    Auburn began operations 40 years ago with an office in Sudbury, Ontario, Canada, to provide services to Inco Limited. Over the next 40 years, operations expanded considerably, with projects being und

    Jan 1, 2006

  • NIOSH
    Regional Mineral Industry Review Of Europe

    By L. Nahai

    THE OUTPUT ff the mineral industry in 1964 in both non-Communist and Communist Europe showed an upward trend for most countries in keeping with the higher index of overall industrial production. Com

    Jan 1, 1966

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • DFI
    Inspection and Observation Methods

    "Full time inspection of drilled shafts by qualified personnel is a necessary part of construction. Detailed inspection procedures for routine inspection are provided in the Drilled Shaft Inspector’s

    Jan 1, 2004

  • CIM
    Setting the Record Straight

    By Don Thompson

    It isn?t a lie if you don?t tell the whole truth The pictures National Geographic didn?t print Other photos National Geographic didn?t print?

    May 1, 2009

  • SME
    Resource companies must preserve capital while gaining operational efficiency

    By Adam H. Zimmerman

    Introduction Noranda, like similar businesses, is suffering the pain of previously unheard of currency relationships, a cost structure built in better days, and conditions of gross oversupply possibl

    Jan 6, 1985

  • ISEE
    Top Hammer Drilling-The Way Things Work

    By William D. Hissem

    For those blasthole applications which require the use of holes ranging from 1” to 5.5” in diameter, the use of top hammer drills has been the equipment of choice for several generations of drillers.

    Jan 1, 1998