Search Documents

  • IIMP
    Gerenciamiento en la construcción de proyectos de sistemas de izaje Volcán Compañía Minera S. A. A.

    By Ernesto Zelaya P

    En el Perú, muchas de las empresas mineras se desarrollaron por la configuración de sus yacimientos explotados. Sin embargo, también se generaron limitaciones y restricciones en el transporte, extracc

    Sep 12, 2011

  • SME
    Challenge of Minerals Exploration in the 1990s

    By Roy Woodall

    Successful mineral exploration is the lifeblood of the mining industry. Contrary to what the environmental lobby would have the world believe, the industry is replacing the metals it is extracting. Th

    Jan 1, 1992

  • NIOSH
    RI 9399 - Jet Fan Ventilation in Very Deep Cuts - A Preliminary Analysis (375a027e-ac7b-464d-9c5f-72c1dad6256e)

    By Gerrit V. R. Goodman

    Future coal mining systems will be able to cut from crosscut to crosscut where advances could exceed 100 ft. However, limitations arise when ventilating such mining systems. In deep advance mining, th

    Jan 1, 2010

  • SME
    Hydraulic Shovel Digging Phase Simulation and Force Prediction Using Machine Learning Techniques - Mining, Metallurgy & Exploration (2021)

    By JESSICA W. A. AZURE, Samuel Frimpong, AZUPURI G. A. KABA, FORSYTH A. KADINGDI, PROSPER E. A. AYAWAH

    This study developed machine learning (ML) models for predicting rock formation reactive forces experienced by a hydraulic shovel bucket during excavation. To do this, rock formation in the form of mu

    Sep 27, 2021

  • SME
    Multicriteria and Modular Approach for the Transition from Open Pit to Underground Mining: De-Risking Concept - SME Annual Meeting 2026

    By Enrique Rubio Esquivel, Matías Fuentes Bustamante

    The transition from open pit to underground mining represents a key strategic challenge in modern mine planning. This paper presents a multicriteria and multivariable methodology to plan such a transi

    Feb 22, 2026

  • IIMP
    Nueva línea de producción de clinker grupo Gloria - Yura S. A.

    By Juan Carlos Lozada

    YURA S.A. es una empresa industrial cuyo principal actividad es la fabricación y comercialización de Cementos Portland y adicionados, conglomerados de albañilería y concretos. Asimismo proyecta la con

    Sep 12, 2011

  • IOM3
    Detection of collectors on concentrator mineral grains by time-of-flight secondary-ion mass spectrometry (TOF-SIMS)

    By E. Niehuis, J. Y. Kim, H. G. Cramer, S. L. Chryssoulis, K. G. Stowe, C. Bendel

    TOF-SIMS was used to detect, identify from parent molecular ions and determine the relative concentrations of collectors sorbed on the surface of mineral particles in concentrate and tailings samples

    Dec 1, 1995

  • SAIMM
    The manufacturing of nanoparticles with a plasma process - Synopsis

    By J. T. Nel

    Non-transfer-arc linear plasma systems are highly suited to manufacturing nanoparticles. In this paper, the manufacturing of such particles with specially designed plasma systems is discussed. In gene

    Jan 1, 2010

  • ISEE
    Common Test Methods Used to Measure Properties of Commercial Explosives

    By Gary Eck, Kevin Tallent

    Over the past decades, the science of energetic materials has advanced dramatically in both the fields of military munitions, as well as industrial explosives. Out of necessity, test methods to measur

    Jan 1, 1998

  • CIM
    Monitoring of Highwall Stability at the Dome Open Pit

    By John G. Henning

    The Porcupine Joint Venture operates the Dome Mine in South Porcupine, Ontario. Dome underground began production in 1910. It is the longest continuous operating gold mine in Canada, producing in exce

    May 1, 2004

  • SAIMM
    Design Of A Modern Large Capacity FeNi Smelting Plant

    By J. Kempken, R. Degel, J. Kunze, R. König

    The FeNi technology is currently dominated by high-power submerged arc furnaces, often designed as smelter as "two-inline-solution". To achieve the intended high efficiency, state-of-the-art design in

    Jan 1, 2007

  • CIM
    Satrapm, A Customizable Web-Based Project Management Software

    By Vahid Faghihi

    SatraPM is a web-based software package, aiming to help project managers to easily handle their construction projects via internet. This software is capable of handling all projects of an organization

    Aug 1, 2013

  • CIM
    Placer Mining in the Atlin District

    By C. L. Monroe

    It has been the custom in recent years to look upon Atlin as a worked-out placer camp. This is a conception, however, which is far from the real situation. The placer-gold deposits of Atlin are today,

    Jan 1, 1929

  • DFI
    Construction Of Large Underground Openings And Use Of Grouts ? Synopsis

    By E. Mongilardi

    The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a

    Jan 1, 2010

  • ABM
    Desenvolvimento De Aço Api 5l-x65 Para Dutos Resistentes Ao Serviço Ácido (Sour Service)

    By Ricardo Miranda Alé

    Aços resistentes ao serviço ácido (sour service), com requisitos adicionais de alta resistência mecânica e tenacidade, têm sido especificados para aplicação em gasodutos do Pólo Pré-sal da Bacia de Sa

    Aug 8, 2018

  • AUSIMM
    Presidential Address (d1c8711c-24f7-4067-8feb-50759fcd4917)

    In presenting this address I am conscious of the honour that has been paid me in my election to this important office, and I am very aware that I follow, in the position of President, many distinguish

    Jan 1, 1963

  • SME
    Application Of Slag Technology To Recycling Of Solid Wastes

    By Paul B. Queneau

    Formulation and commercial utilization of solid-waste incinerator slag by-product is the focus of this paper. Particular attention is given to iron aluminosilicate melts having compositions similar to

    Jan 1, 1991

  • CIM
    Shaft hoisting system for Olympic Dam

    1. Scope of project In South Australia, the Western Mining Corporation operates the underground copper and uranium mine Olympic Dam. The deposits concerned are enormous (approx. 570 million tons) and

    May 1, 2003

  • DFI
    Construction Considerations For Ground Modification Projects ? Synopsis

    By J. P. Welsh

    Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan

    Jan 1, 2010

  • SME
    MBTA Silver Line Phase III?Completes Boston?s Newest Transit Line

    By Gregory Yates

    INTRODUCTION Project Description The Silver Line is a Bus Rapid Transit (BRT) Line and is Boston?s newest transit service. Silver Line Phase I extends along Washington Street entirely on the surface