Assessing The Performance And Capacity Of Matte Leaching Using Predictive ModelsBy F. Crundwell, A. J. Lathwood
A number of base-metal operations would like to increase production to take advantage of the higher metals prices. In general, this higher production should not be achieved with major operating chang
Jan 1, 2007
-
Accelerated Kimberlite Weathering - The Role Of Cation Type On The Settling Behaviour Of FinesBy E. T. Boshoff
Paper written on project work carried out in partial fulfilment of B. Eng. (Metallurgical Engineering) The weathering of kimberlite can be accelerated with cations in solution if swelling of the ki
Jan 1, 2005
-
A Review On The Progress Towards PT-Base Superalloys For Ultra High Temperature ApplicationsBy S. Vorberg, J. Preussner, B. Fischer, U. Glatzel, R. Völkl, M. Wenderoth
Pt-Al-X alloys have shown good mechanical properties and adequate oxidation resistance. Starting from a promising Pt-Al-Cr alloy, the influence of Ni additions was investigated. After ageing finely di
Jan 1, 2006
-
Shear-bond strength testing of thin spray-on liners - SynopsisBy H. Yilmaz
A testing method for assessing the shear-bond strength of thin spray-on liner (TSL) on rock substrate was developed at Wits University Rock Mechanics Laboratories. The gap between a 20 mm thick steel
Jan 1, 2007
-
Economic Modelling Of A Ferrochrome Furnace ? SynopsisBy W. Biermann
All industrial processes are economically driven, resulting in the ever increasing need for process optimization in order to stay competitive and profitable. Numerous models has been published depicti
Jan 1, 2012
-
Finite Element Modelling Of Electric Currents In Ac Submerged Arc FurnacesBy I. Mc Dougall
Finite element models were generated of two submerged arc furnaces of different geometries. A 48MW circular furnace and a 68MW 6-in-line rectangular furnace were studied. The electrodes, raw material,
Jan 1, 2007
-
Structural Modelling Of Open Pit MinesBy M. K. Elmouttie, G. V. Poropat
The analysis of structure using joint set statistics is well known. Other data such as the position of discontinuities and the contacts between rock mass units cannot be easily incorporated in simple
Jan 1, 2006
-
Planning Concept For U/G Works - Overall Planning Concepts Of The Underground Works - Park Station To Marlboro Portal - SummaryBy Philippe Dumont
?Lay out of the tunnel section ?General ?Geology ?Tunnels methods ?Stations constraints ?Impacts on tunnels ?Design ?Programs
-
Process design of the Phola coal preparation plant - SynopsisBy G. M. Cresswell
The 2 360 t/h two module Phola coal preparation plant represents anew era of large plant in the Witbank coalfield designed to extend its life to 2020 and beyond. The plant uses the optimum processing
Jan 1, 2010
-
The challenge of building local capacity to support the development of a sustainable mining industry in emerging mining nations ? SynopsisBy C. L. Reichardt
Mining companies are increasingly looking to the developing world for the next generation of mining projects, often in countries that have little or no previous history of large-scale mining. One of t
Jan 1, 2009
-
A sustainable approach to derelict and ownerless mines in South AfricaBy S. Mudau, P. Mohasoa, M. J. Cole
Derelict and ownerless (D&O) mines in South Africa have been an ongoing concern for over a decade. While some progress has been made to rehabilitate D&O asbestos sites, significant work remains, exace
Apr 25, 2025
-
Automated SEM study of PGM distribution across a UG2 flotation concentrate bank: implications for understanding PGM floatability ? SynopsisBy D. Chetty
The characterization of platinum group minerals (PGMs) from concentrator flotation circuits provides valuable information towards understanding PGM recovery under given milling and flotation condition
Jan 1, 2009
-
Aids to Planning Production in Coal MinesBy F. H. Deist, M. P. Roberts
"The Collieries Research Laboratory of the Chamber of Mines of South Africa is developing a coherent system of programs to aid in the full spectrum of activities arising in the planning of new as well
Jan 1, 2014
-
South Africa's Ferro Alloys Industry - Present Status And Future OutlookBy T. R. Curr, W. A. Gericke, J. Basson
South Africa is a leading player in the international ferro alloys industry. Historical factors that have contributed to this dominant position include an abundance of natural resources and relatively
Jan 1, 2007
-
A Mathematical Model Of Laser Surface Heat-Cooling Treatment For Medium Carbon Steel - SynopsisBy I. Fedotov
One of the most effective methods of metal surface heat treatment is through laser hardening. In most cases, laser parameters are determined experimentally, which is expensive and time-consuming. A ma
Jan 1, 2011
-
Risk Indexing Tool for Mine PlanningBy W. Abdellah
The purpose of this paper is to establish a qualitative method to estimate the risk level (e.g. rating and ranking) resulting from mining activity. Risk is the product of two factors: probability of f
Jan 1, 2014
-
The Ultimate Screener - IntroductionBy R. Dass
Paper written on project work carried out in partial fulfilment of B. Sc Eng (Extractive Metallurgy) degree Screening is an industrial process that splits material at a specific cut size into one f
Jan 1, 2004
-
The Application Of Radar Techniques For In-Mine Feature Mapping In The Bushveld Complex Of South AfricaBy D. Vogt
A brief summary of the propagation characteristics of rock provides the necessary understanding to design effective radar surveys. Measurements of the electrical properties of the major Bushveld plati
Jan 1, 2005
-
An algorithm for quantifying regionalized ore grades - SynopsisWe present a novel hybrid algorithm for quantifying the ore grade variability that has central importance in ore reserve estimation. The proposed algorithm has three stages: (1) fuzzy clustering, (2)
Jan 1, 2008
-
Dealing With Open Fire In An Underground Coal Mine By Ventilation Control TechniquesBy N. Sahay
Open fire in coal mines is one of the most serious threats to miners, as well as to the mine. Open fire can often be effectively dealt with by prompt local action, otherwise it very quickly becomes un
Jan 1, 2014