    Rammed Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle East

    By Brian Metcalfe, Kord Wissmann, Gianni Martinez

    The Middle East consists of vast deserts that reach temperatures up to 50 degrees Celsius, with some areas characterized by endless sand dunes. When the project team selected the location for a large

    May 1, 2022

  • DFI
    Lateral Vibration Response Of Full Scale Single Piles

    By A. Boominathan

    The behaviour of single piles under lateral dynamic loading is very critical and the study is still a current field of research since 1950's. Though many methods have been developed analytically

    Jan 1, 2002

  • DFI
    Evaluating Efficiency of Geo5 in the Analysis of Pile Foundation

    By Elizabeth Varghese, Sanket Rawat, Prachuryya Kaushik, Ravi Kant Mittal

    "Geo5 Software is gaining popularity worldwide due to its expediency in analysis and design of pile foundation. The analysis is based on various theoretical, empirical and semi-empirical methods avail

    Jan 1, 2017

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - Collapse

    By Darrell L. Beddard

    The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western

    Jan 1, 1996

  • DFI
    Driven Pipe Pile Solutions for the Temporary Foundations at the New San Francisco-Oakland Bay Bridge

    By Manuel M. Reyes, Thuraisamy Thavaraj, Alex Sy

    "The new east span of the San Francisco-Oakland Bridge features a single tower self-anchored suspension (SAS) bridge. During construction of the SAS bridge, a temporary bridge was used to support the

    Jan 1, 2015

  • DFI
    Innovations in the Design and Construction of Marine Foundations

    By Robert B. Bittner

    "AbstractLarge diameter tubular piles offer significant advantages in terms of design performance and economy for major marine structures. This is particularly true for foundations of major overwater

    Jan 1, 2014

  • DFI
    Construction Of Effluent Outfall Diffusers For The Boston Harbor Project

    By Geoffrey D. Collins

    This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay

    Jan 1, 1994

  • DFI
    Lateral Pressure Relief by Geotextile Encased Columns (GECs) at Piled Bridge Abutments: Two Case Studies

    By Sven Schröer, Lilma Schimmel, Dimiter Alexiew

    "The Geotextile Encased Columns (GEC) deep foundation system for embankments on soft soils was introduced some 20 years ago and is now considered State-of-the-art worldwide.The GECs consist of compact

    Jan 1, 2016

  • DFI
    Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit Limestone

    By Jim Glider, Noah Miner

    The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio

    Sep 8, 2021

  • DFI
    Earth Retention Systems In The Urban Environment - Special Considerations

    By George J. Tamara

    The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence

    Jan 1, 2003

  • DFI
    Site Development and Foundation Planning for a Wastewater Treatment Plant Expansion

    By Steven R. Ahlfield, Ali Ghandeharioon

    A wastewater treatment plant commissioned in 1978 is undergoing a major expansion. Planning various phases of the 8-hectare expansion at this site requires an understanding of the site response during

    Jan 1, 2019

  • DFI
    PPP Contract Delivery System- Contractual Risks and Ethical Issues Regarding Deep Foundation Subcontractors

    By Alexander Filotti, Richard Kalson

    "1. INTRODUCTION- WHAT IS P3 OR PPP ?The Public Private Partnership (PPP or 3P) is a project delivery scheme based on the government providing land and/or a concession agreement, and on a private enti

    Jan 1, 2017

  • DFI
    Optimization of Design of Drilled Shaft Foundations by Lateral Load Testing (94ee84ca-5eda-40d1-bba2-d7742a925002)

    By Donald R. Clark

    "Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re

    Jan 1, 2017

  • DFI
    Optimization Of Design Of Drilled Shaft Foundations By Lateral Load Testing

    By Donald R. Clark

    Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re

  • DFI
    Low Overhead Secant Piles Drilled From Within A Shaft

    By Allen B. Stanton, Parthiv Brahmbhatt, Michael Grimm, Stanley L. Worst

    Constructing a circular shaft consisting of secant piles has its own complications which make it more difficult than typical drilled shaft construction. Add to that performing under low overhead power

    Oct 1, 2022

  • DFI
    New Piling System With Multi-Head Hammer Drill Capable Of Drilling Including 35,000 Psi Rock "Mach Drilling System" And Some Construction Examples - 1. Incentive Of Development

    By J. Nakayama

    For drilling large diameter holes for deep foundations, the common and distressing difficulty of long standing has been in coping with ground containing rocky formations and boulders. Where geological

    Jan 1, 1988

  • DFI
    Seismic Retrofit Of Bridges; Geotechnical Design Considerations And Case History

    By Aly M. Mohammad

    State and federal agencies during rehabilitation of existing bridges may require the existing bridges to be evaluated under seismic conditions. If the bridge does not perform under the seismic event,

    Jan 1, 2006

  • DFI
    Bi-Directional Testing Using Super Cells for the Jiaxing-Shaoxing River Crossing Bridge

    By Diane Reid, Antonio Marinucci, Robin Mao

    Super Cells are an innovative, open-shaped bi-directional static load testing device used to promote concrete flow during placement while utilizing greater cross-sectional area of the pile to achieve

    Jan 1, 2019

  • DFI
    Pile Top Hydraulic Hammer Drive Down The Hole Chiselling Round Steel Piling System - Summary

    By J. Nakayama

    For installation of round steel piles or cast-in-place pile construction through boulder contained ground or rocky formation, usual system does not function properly or impossible to work. This paper

    Jan 1, 1999

  • DFI
    Effects Of Change In The Support System On Temporary Secant Pile Wall

    By Anburaj C., Srinivas A.

    Deep excavation with support system is required to construct various part of underground structures like shafts, stations and entry structures etc. These structures have to be constructed using perman

    Nov 1, 2022