Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Geotechnical Constraints On A 6 M Single Pass Longwall

    By Ross W. Seedsman

    The feasibility of 6 m high single pass longwalling has been studied using Newlands Mine as a case study An intensive geological investigation identified a range of hazards but a mine layout was possi

    Jan 1, 1992

  • SME-ICGCM
    International Conference On Ground Control In Mining Design Of Three-Entry System For Super Longwall Panels

    By J. D. Cole

    In order to reduce the number of longwall face moves and to increase the rate of gateroad construction, super longwall panels, 1000 feet wide and 12000 to 14000 feet long, are planned for Wolf Creek C

    Jan 1, 1990

  • SME-ICGCM
    Design Considerations For Bump-Prone Longwall Mines

    Tailgate pillar and tailgate-face corner humps have been a major threat to longwall coal mines where hump-prone conditions exist. The yield pillar design concept, in which the longwall chain pillars a

    Jan 1, 1999

  • SME-ICGCM
    Development of Geotechnical Procedures for the Analysis of Mine Seismicity and Pillar Designs

    By Hamid Maleki

    Mining in the Book Cliffs Coal Field of Utah has historically been associated with seismicity because of high-stress environments and the presence of stiff, competent rocks. Recognizing the geotechnic

    Jan 1, 2003

  • SME-ICGCM
    High Capacity Tensioned Cable Bolts For Tailgate Support

    By Stephen C. Tadolini

    A joint research program was designed and conducted at Lodestar Energy?s Baker Mine to investigate the performance of a high-capacity tensioned cable supported gateroad. The secondary system consisted

    Jan 1, 2000

  • SME-ICGCM
    Cyprus Shoshone Tailgate Roof Control: Case Study

    By Andrew P. Schissler

    Cyprus Shoshone is an underground coal mine in southern Wyoming owned by Cyprus Coal Company, a subsidiary of Cyprus Minerals Company. To date, seven longwall panels have been extracted from the pitch

    Jan 1, 1993

  • SME-ICGCM
    Axial Performance of a Modified Fully Grouted Cable Bolt Tested with a New Laboratory Short Encapsulation Pull Test

    By Paul C. Hagan, Jianhang Chen, Serkan Saydam

    "Modified cable bolts are commonly used in underground mines due to their superior performance in preventing bed separation when compared with plain strands. To better test the axial performance of a

    Jan 1, 2015

  • SME-ICGCM
    Extraction Ratio In Thin Seams Assuring No Surface Subsidence

    By Kot F. v. Unrug

    The depletion of thicker coal reserves has resulted in the thinner seams being economically attractive. Surface protection against subsidence limits the extraction ratio to 50% for the room and pillar

    Jan 1, 2001

  • SME-ICGCM
    Coal Mine Seismicity And Bumps: Historical Case Studies And Current Field Activity

    By John L. Ellenberger

    The National Institute for Occupational Safety and Health (NIOSH) has continued the research role of the former U.S. Bureau of Mines to develop techniques that will reduce the hazards in the mining wo

    Jan 1, 2000

  • SME-ICGCM
    Tension-Torque Relationship For Mechanical Anchored Roof Bolts

    By H. N. Maleki

    Tension-torque relationships were investigated *n a coal mine for bath standard 5/8 in. (16 mm) bolts and a vibrating wire instrumented bolt, using conventional and controlled installation techniques.

    Jan 1, 1984

  • SME-ICGCM
    Depillaring and Roof Bolting Practices at Quinsam Coal Mine

    By Kresho Galovich

    Quinsam Coal Mine located in Vancouver Island, BC, Canada is mining the No. 1 coal seam at the 2 North/3 North mine and the No. 3 coal seam at 4 South Mine. This paper describes its geology and struct

    Jan 1, 2005

  • SME-ICGCM
    Detecting Abandoned Coal Mine Entries by High Resolution Earth Resistivity Method

    By Xianxin Shi

    In surface electrical exploration the high resolution earth resistivity method (HRRM) is a very effective method for detecting abandoned drift mines workings. When the abandoned mines are more than 50

    Jan 1, 2005

  • SME-ICGCM
    A Lineament Analysis Case Study of the Fola Coal Co., LLC. No. 2 Surface Mine, West Virginia

    By Paul L. Tyrna

    The Fola Coal Co., LLC No 2 surface mine, located in Nicholas and Clay Counties, WV, exploits up to nine coal seams by contour, highwall, and mountain top removal mining methods. After encountering fa

    Jan 1, 2001

  • SME-ICGCM
    Finite Element Modeling Of Subsidence Induced By Underground Coal Mining: The Influence Of Material Nonlinearity And Shearing Along Existing Planes Of Weakness

    By Daniel W. H. Su

    Surface subsidence induced by multiple-panel coal extraction was calculated with finite element stress analysis. The use of nonlinear material behavior and GAP elements, which provide a realistic repr

    Jan 1, 1990

  • SME-ICGCM
    The Directional Drill Monitor For Long Hole Gas Drainage In Coal Mines (d6b87c76-5ad8-4cc5-b4ae-23b79c52c32b)

    By G. Skybey

    The Directional Drill Monitor (DDM) is an advanced instrument for real time in hole surveying. It was developed by Du Pont (Australia) to suit Australian gassy coal mining conditions. The instrumen

    Jan 1, 1992

  • SME-ICGCM
    Implication of Highly Anisotropic Horizontal Stresses on Entry Stability at the West Elk Mine, Somerset, Colorado

    By J. F. T. Agapito

    Overcore measurements at the North Fork Valley (NFV) coal mines in western Colorado have shown that horizontal stresses are highly anisotropic. Measurements have been made in four mines at various dep

    Jan 1, 2005

  • SME-ICGCM
    Application of Regional Subspace Detection to Identify Mining Related Seismicity

    By Keith D. Koper, Kris L. Pankow, Derrick J. A. Chambers, Michael K. McCarter

    "In a mining environment, high quality seismic event catalogs are often useful in interpreting local stress states and identifying areas with elevated ground control risk. Installation, operation, and

    Jan 1, 2015

  • SME-ICGCM
    Analysis of Highwall Mining Stability - The Effect of Multiple Seams and Prior Auger Mining on Design

    By D. Newman

    The objective of this is paper is to review the current state of knowledge and practice in highwall mining (HWM). HWM has become a standard method in surface mining, commonly used alone or in conjunct

    Jan 1, 2005

  • SME-ICGCM
    Subsidence Monitoring Results, Thick Seam Longwall Mining In Wyoming

    By Collin L. Stewart

    A summary of the results of a limited subsidence monitoring program at Cyprus Amax Coal Company's Shoshone Mine No. 1 in the Hanna Basin of south central Wyoming is presented. The monitoring prog

    Jan 1, 1995

  • SME-ICGCM
    Prediction Of Longwall Support Loading At Southern Colliery, Queensland (a27f315c-1e91-4c85-b61a-2de1eb8e0d0f)

    Roof conditions at Southern Colliery, the second Iongwall mine to be established at German Creek, were found to be much stronger and more massive than at the earlier longwall mine on the lease. Invest

    Jan 1, 1992