Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Validation Of Exponential Decay Blast Vibration Predictor With Case Studies

    By A. Ghosh

    Commonly used predictors of ground vibration from blasting, being linear in log-log plot, do not model the underlying physics of wave attenuation. Amplitude of the wave decays with distance due to geo

    Jan 1, 1991

  • SME
    Ground Support Optimization Using a Structured Strata Management Process in Wide Set-up Room Roadways at West Elk Mine

    By Bob Munz, Ry Stone

    To facilitate the installation of the longwall equipment for each extraction panel, West Elk mine develops set-up room roadways that are between 26.5 and 30.5 feet wide. Historically at the mine, the

    Jun 25, 2024

  • SME
    Heat/humidity tests of a built-in-place refuge alternative using simulated miners - SME Transactions 2018

    By T. J. Lutz, D. S. Yantek, L. Yan, J. R. Srednicki, J. A. Yonkey, G. T. Homce

    Federal regulations require the installation of refuge alternatives in underground coal mines. Of the inuse refuge alternatives, more than 95 percent are mobile refuge alternatives, with the remainder

    Jan 1, 2018

  • SME
    Realistic Simulation Accelerates Safety Evaluation Of Mine Designs

    Global mining company achieves significant productivity gains with three-dimensional (3D) mine models developed with Abaqus finite element analysis software. In a steep change beyond traditional proc

    Jan 1, 2009

  • SME
    The Size Distribution of Airborne Bolivian Crocidolite Fibers

    By Matthew S. Sanchez, Richard J. Lee, Matthew D. Zock, Drew R. Van Orden

    "Current Environmental Protection Agency (EPA) risk models and asbestos fiber counting techniques for monitoring airborne exposures treat all fibers as being equivalent and ignore the effect of dimens

    Jan 1, 2012

  • SME
    Reducing Mine Accidents By Design

    By J. H. Daniel

    The reduction of accidents will play an ever increasing role in the mining of coal and hardrock ores as mining operations become more mechanized, the equipment becomes more costly and sophisticated, a

    Jan 1, 1991

  • SME
    Automatically Controlled Continuous Mining Machines - Computer Simulation Of Control System Performance (842f2370-d6fc-46af-a07c-a7b6bb488a8a)

    A computer simulation of the automatic control of continuous mining machines has been prepared, similar to previous simulations of longwall mining systems and coal thickness sensors. The simulation al

    Jan 1, 1993

  • SME
    Washington Metropolitan Area Transit Authority's Experience With Contractual Relationships In Tunneling Contracts

    By William S. Alldredge

    The Washington Metropolitan Area Transit Authority(WMATA) officially came into existence in February 1967 after the District of Columbia, Maryland, and Virginia joined in a com¬pact pursuant to Federa

    Jan 1, 1974

  • SME
    Excavation And Support Of Navajo Tunnel No.3

    By P. E. Sperry, R. E. Heuer

    The United States Bureau of Reclamation is constructing the $200 million Navajo Indian Irrigation Project to irrigate 110,000 acres of land on the Navajo Indian Reservation in northwestern New Mexico.

    Jan 1, 1997

  • SME
    The Effect Of End Constraint On The Compressive Strength Of Model Rock Pillars

    By Clarence O. Babcock

    Model pillars of limestone, marble, sandstone, and granite, with length-to-diameter ratios of 3, 2, 1, 0.5, and 0.25 (0.286 for granite), were broken in axial compression to determine to what extent a

    Jan 1, 1969

  • SME
    Cost Calculations for Highly Mechanized Cut-and-Fill Stoping

    By Gordon M. Pugh, David G. Rasmussen

    INTRODUCTION The two unit operations in cut-and-fill stoping that would benefit most from increased mechanization are drilling blastholes and moving broken ore to the ore¬passes. Drilling in curren

    Jan 1, 1982

  • SME
    Understanding Thermal Coal Ash Behaviour

    By S. K. Ghosh

    This paper discusses how the information on ash composition, ash-fusion temperatures, and ash-slag viscosity can be utilized to predict slagging and fouling potentials of a particular coal. A review o

    Jan 1, 1983

  • SME
    Hierarchical Computer Monitoring And Grinding Control At Pinto Valley

    By J. C. Watts

    Monitoring and control of conventional industrial wet grinding circuits is conceptually straightforward. However, since production objectives and operating constraints can vary widely from plant to pl

    Jan 1, 1978

  • SME
    Penalty Element Metallurgical Amerlioration By Automated Mineralogy: Progress Towards A Deportment Of Fluorine In The Grasberg, Dmlz And Block Cave Mines, Papua, Indonesia - SME Annual Meeting 2022

    By W. A. Mathews

    We report on the progress of an automated mineralogical deportment of fluorine (F) in two portions of the Grasberg District for the development of metallurgical amelioration protocols for Cu sulfide c

    Mar 2, 2022

  • SME
    Effects of Sodium Carbonate on the Carbothermic Reduction of Siderite Ore With High Phosphorus Content

    By Shaojun Bai

    Siderite ore with high phosphorus content was reduced isothermally at 1,050° C with pulverized coal and different dosages of sodium carbonate. X-ray diffraction (XRD), scanning electron microscopy (SE

  • SME
    New Mine Development - A New Industrial Mineral Sand Mine Near Coos Bay, Oregon

    By Joseph D. Drew

    Oregon Resources Corp. (ORC) has developed and permitted a new mining operation that incorporates a process design that will allow the unique paleo-beach placer deposits of southwestern Oregon to be

    Jan 1, 2010

  • SME
    LURGl's Circulating Fluid Bed Roasting Process Improves Gold Recovery

    By Bodo Peinemann

    For more than 35 years Lurgi has been providing its fluid bed roasters on a world­wide basis. The current total annual capaci­ty of the 250 Lurgi roasters approaches 26 million mt of sulphide minerals

    Jan 1, 1990

  • SME
    Stochastic modeling of iron in coal seams using two‐point and multiple‐point geostatistics: A case study (Mining, Metallurgy & Exploration)

    By Nasser Madani, SULTAN ABULKHAIR

    The abstract of the paper discusses the challenge of quantifying iron content in a coal deposit in Kazakhstan. The iron dataset is limited, coming from only three drill holes and some stope samples, w

    Mar 30, 2022

  • SME
    Practical Options for Solving the Dolomite Problem with Florida Phosphate Resources

    By C. Feng, W. Song, B. Moudgil, P. Zhang, W. Xiao

    Separation of dolomite from phosphate is the most challenging problem in phosphate mineral processing. Over 50% of the future phosphate reserves in Florida contains too much dolomite to process using

    Jan 1, 2019

  • SME
    Crack Initiation and Damage Evolution in High Porosity Sandstone Under Cyclic Compression - RASIM2022

    By Kai Koosmen, Mehdi Serati, Tengzhou Wang

    Spalling and rockburst are unwanted brittle failures at the boundaries of underground excavations that are commonly observed in hard rock and high-stress environments at significant depths, although,

    Apr 26, 2022