Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Microcomputers and Mining : Administrative and Geotechnical Software

    By Thomas C. Shapiro

    This is the final article in a three-part series on microcomputers and application software in the mineral industry. The first article covered microcomputer terms and concepts. The second discussed ex

    Jan 4, 1984

  • SME
    How to bridge the gap between geotechnical research and credible mine-site geotechnical design tools

    By Mark Colwell

    As per most other earth science engineering problems, the underground coal geotechnical environment and the way in which roof and rib support interacts with the rock mass are complex issues. While the

  • SME
    Development Of An On-Line Coal Washability Analysis System Using X-Ray Computed Tomography

    By G. T. Adel, J. D. Miller, C. L. Lin

    Washability analysis determines the maximum separation efficiency that can be achieved in the operation of coal preparation plants. Unfortunately, there are no on-line techniques for determining this

    Jan 1, 2000

  • SME
    Looking Back at 1942-1946

    Although out of the ordinary, MINING ENGINEERING is pleased to present a few photographs that typify Western US mining activity during WWII. The photographs, taken by R.G. Zellers at Colorado minin

    Jan 6, 1983

  • SME
    Ground Observation System (GOS): A Web-Based Data Information Center for Ground Control Monitoring

    By E. C. Westman, W. R. Thomas, W. J. Conrad, A. J. R. Russell

    "Understanding ground control problems continues to remain a focus of the mining engineering community. To aid mine operators and engineers in identifying and responding to ground control issues, the

    Jan 1, 2015

  • SME
    Large Grinding Mill Bolted Joints – A Topic Of Concern (11a1f463-ada3-4cfb-90bc-0f7f4fabdaf0)

    By R. L. Guerguerian

    Critical fasteners are described as they apply to the specification, manufacture, and assembly on large grinding mill bolted joints. The importance of adequate design methods, related joint diagrams

    Jan 1, 2001

  • SME
    The Value Proposition: High Annual Return On Investment, And Short-Term Payback Realized In Integrated Mining Processing Automation And Optimization Using IndustrialIT Solutions

    By M. C. Mound, E. Gallestey, C. Colbert

    Continuous operating performance and high profit is one of the major concerns in the mining industry. Information systems are expected to reinforce and enable conformance to these requirements. The co

    Jan 1, 2004

  • SME
    Using An Integrated Model For Maintenance Strategy Selection Of Load-Haul-Dump Equipment

    By A. Yazadni-Chamzini

    Maintenance strategy selection plays a significant role in mining design. The nature of maintenance strategy selection is a complex multi-criteria decision making (MCDM) problem including both tangibl

    Jan 1, 2012

  • SME
    Enabling Mining Safety & Automation By Electronically Scanning Microwave Radar Systems On Surface Mining Machines

    Using a series-model of an automotive short range radar sensor (SRR) and a recently completed experimental radar system, field tests have been performed in a surface mine. It was examined, to what ext

    Jan 1, 2007

  • SME
    Extensive Mechanization Produces Record Performance In Drill-Blast Tunnelling

    By Hans Hamrin

    Three drill-blast cycles of 3.1 m advance achieved in one working shift of 7.5 hours at the Holsfjorden Tunnel project in Norway. The tunnel, 5235 m long, with a cross section of 8.6 m2, was completed

    Jan 1, 1987

  • SME
    Removal Of Arsenic And Heavy Metals From Mine Drainage And Ground Water In The Black Hills Of South Dakota

    By A. D. Davis

    The Gilt Edge Superfund Site is a former heap-leach gold mine that currently is being remediated in the Black Hills of South Dakota. Mine runoff water is treated before release from the site. The fi

    Jan 1, 2011

  • SME
    Durability Design and Construction for Underground Facilities - NAT2024

    By Wern-Ping Nick Chen

    Durability risks for underground facilities can be underestimated during design phase as compared to well-known geological risks. However, unclear durability requirements can result in construction sc

    Jun 23, 2024

  • SME
    Sales Comparison Valuation Of Development And Operating Stage Mineral Properties (35d10c9f-1d98-4437-8650-1c6154123f45)

    By T. R. Ellis

    Minerals Appraisers/Valuers often find great difficulty or failure in attempting to employ the Sales Comparison Approach to the Market Value Appraisal of development and operating stage mineral proper

    Jan 1, 2011

  • SME
    Big Walnut Outfall Augmentation Sewer?Part II: Tbm Case History

    By Tom Szaraz

    Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer?Part II (BWOAS) consists of 13,200 feet of tunnel of 12-foot tunnel passing mainly through gla

  • SME
    Exploratory Fea & Conceptual Design Findings Of Large Diameter Segmentally Lined Shaft

    By D. Kruse

    Top down constructed large diameter (up to 90 m [300 ft]) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study cov

    Jan 1, 2011

  • SME
    Building Human Resources Through Systematically Designed Instruction

    By R. E. Mclvor

    This is an update of an original dissertation on this topic by Lavallee, McIvor and Stolovitch (1992). A step-by-step, technical procedure used to measure and improve the performance of plant grinding

    Jan 1, 2008

  • SME
    Minerals Industry Salary Survey

    In its April 1991 issue, MINING ENGINEERING published a salary survey form asking for information relating to engineering and management jobs in the minerals industry. 1038 of these forms were filled

    Jan 1, 1992

  • SME
    Sao Paulo Metro Project?Control Of Settlements In Variable Soil Conditions Through EPB Pressure And Bicomponent Backfill Grout

    By Lorenzo Pellegrini

    The respect of EPB reference pressure during TBM advance and hyperbaric activities, the complete and effective filling of the annular gap between tunnel lining extrados and the excavation section and

  • SME
    Teleoperated Cutting and Haulage For Thin Coal Seams

    By A. J. Kwitowski

    Remote control is usually associated with deep mine, continuous mining machines. This is because thin-seam operation precludes an onboard operator's compartment or the mine has approval to conduc

    Jan 1, 1992

  • SME
    Use of Tunnel Boring Machines at Depth: Extending the Limits

    By Peter Dowden, Trevor Carter, Allan Moss, Bruce Downing, Richard Beddoes

    Traditionally (with a few exceptions) tunnel boring machines (TBMs) have been utilized on tunnel projects where the risks associated with deep tunnels (rock burst, squeeze, etc) are low (or expected t

    Jan 1, 2007