Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Critical Delay Timing in Multi-Level Mass Stope Blast DesignBy Dale Preece, Stephen Chung, Qian Liu
Stoping is one of the widely adapted methods in underground mining. In this method, fanned or parallel holes are often drilled from a top sill down to a sub- level in the ore zone and blasted ring by
Jan 1, 2003
-
Measuring Blast Movement to Reduce Ore Loss and DilutionBy Darren Thorton, David Sprott, Ian Brunton
Blasting causes movement of the rock and can be detrimental to the accurate delineation of the ore and waste regions within the resulting muck pile. The consequences can be ore loss and dilution. Howe
Jan 1, 2005
-
Stratablasttm - A New Mining MethodBy T Goswami
The conventional practice in open cut coal strip mining has been to blast the overburden or coal layers in separate blast events. This is done in order to maximise the benefits from throw blasting and
Jan 1, 2006
-
Visualization of Cratering in an Underwater EnvironmentBy D. J. Goodings, R. J. Bonenberger, H. U. Leiste, W. L. Foumey
This paper describes a series of two-dimensional tests conducted and filmed with a high-speed (500 frames per second) video camera. The purpose of these tests was to provide a better understanding of
Jan 1, 2000
-
Interpreting the Accuracy and Validity of Seismograph RecordingsBy John E. Wiegand
"We will attempt to explain the basic workings of a modern seismograph and how the recorded data can be interpreted, not only for determining compliance to the regulations, but also in determining whe
Jan 1, 1992
-
Rapid Chemical Destruction of Explosives in Various Materials by MuniRem®By Charolett Hayes, A. L. Russell, Anthony J. Bednar, Jared Smith, Valentine A. Nzengung, Stephen L. Pilcher
The manufacture of Energetics Materials (EM), including maintenance and demilitarization of munitions causes dangerously high levels of explosives residues to be harbored in building features. The two
Jan 1, 2016
-
Demonstrating Competence from Charge Hands to Chartered EngineersBy Ken Cross
This paper aims to demonstrate that explosives organizations and workers have a legal, moral and financial duty to be able to demonstrate their competence when required, and how that may be achieved a
Jan 1, 2013
-
Bench Face and Quarry Fragmentation Analysis: 3D Imaging vs. Scaling ReferencesBy Daniel Ko, Ian Bell, Shahram Tafazoli, Bahram Sameti, Aylin Azmin
Image-based remote sensing of rock fragmentation in mining and quarry applications essentially treats each rock in the image as a data object in order to determine the rock size distribution. An obvio
Jan 1, 2015
-
Guidewall Demolition at Bonneville DamBy Randall S. Marks
Bonneville Dam, completed in 1938, included the smallest and busiest lock on the Columbia and Snake River Navigation System. To expedite barge traffic through this restriction, a new larger lock was d
Jan 1, 1997
-
Effect of Firing Multiple Geophysical Charges in a Borehole on the Amplitude and Frequency Content of the Generated Seismic WaveBy D S. Preece
The aim of the present work is to investigate the effects of shooting multiple explosive charges, in the same borehole, on the amplitude and frequency content of the generated seismic wave. The work a
Jan 1, 2012
-
The Assessment of Environmental Impacts of Blasting During The Construction of A Metro TunnelBy Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Mehmet Aksoy, Kagan Ozdemir, Adiguzel Deniz
This paper presents the results of ground vibration measurements induced by blasting during the construction of the Istanbul Kadiköy-Kartal metro tunnel which has been driven at a depth of approximate
Jan 1, 2007
-
Near-field Blast Vibration Response of Sensitive PipelinesBy C. Sawmliana, P. Pal Roy
Near-field blast vibration response of restrained pipelines either buried or exposed was studied during rock excavations at sensitive locations for Stage-II (4x500 MW) commissioning work in a super th
Jan 1, 2001
-
Measuring Underground Face Drilling and BlastingBy Thomas Barkley
Recent developments in hardware and software have made accurate measurement of Underground Face (Development) Drilling a reality. New and compact laser profiling equipment makes it possible to measure
Jan 1, 2003
-
Compromising Technology with Field Expedience in Fragmentation EvaluationBy Jason M. Ryan
"Along with recent advances in computer technology have come cost-effective systems desiiedto evaluate fragmentation distributions through digital images of particles. In mining operations andmineral
Jan 1, 1998
-
Trench Blasting Guidelines & PitfallsBy Vic Sterner
As cities and towns continue to grow, the need to install sewer, water, gas and other utilities becomes a necessity and the blasting of trenches for these service lines probably constitutes one of the
Jan 1, 2004
-
Selection of Powder Factor in Large Diameter Blastholes (9dd28d4c-e692-46ff-9e71-b2043e0b42a0)By Jack Eloranta
This paper documents the relationship between material handling and processing coete compared to blasting cost. The old adage, "The cheapest crushing is done in the pit", appears accurate in this c!as
Jan 1, 1995
-
Florida Mining Blast Vibration Study Part 1: Do RI8507 Vibration Limits Apply in Florida?By Tristan Worsey, Nathan Rouse
Florida is one of the major limestone producing states in the United States. The state has unique regional geology and groundwater characteristics that require equally unique mining methods to extract
Jan 1, 2019
-
Journal: 100 Years / Mining & Scientific Press San Francisco March 18, 1905By Robert Hopler
This article, advocating having employees whose specific job would be to fire blasts in underground coal mines in llinois, was written 5 years prior to the establishment of the U.S. Bureau of Mines,
Jan 1, 2006
-
The Fragblast History FB 1- FB 10By Agne Rustan
This paper is intended to give a summary of the first ten Symposia on Rock Fragmentation by Blasting where the symposia activities were governed by a Steering Committee replaced at Fragblast 2 by an I
Jan 1, 2014
-
Effects of Aggregate Production Blasting on an Adjacent 42” (1.067m) PipelineBy John Babcock, Bryan C. Smith
In a partnership between Luck Stone Corporation and Loudoun Water, a 42” (1.067m) steel pipeline was constructed along the perimeter of an extensive permitted reserve of diabase rock Luck Stone was ab
Jan 1, 2019