Guidelines for Selecting Cutoff Wall SystemsBy Mary Ellen Large
This publication of Deep Foundations Institute (DFI) is intended to provide project owners, design engineers and construction professionals with guidelines for selecting cutoff wall and barrier system
Jan 1, 2021
-
Final Report – Workshop on Quality Assurance for Post-Grouted Drilled ShaftsBy Mary Ellen Bruce Large
"In partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC), Deep Foun
Jan 1, 2016
-
Workshop on Quality Assurance for Post-Grouted Drilled ShaftsBy Mary Ellen Bruce Large
"INTRODUCTIONIn partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC
Jan 1, 2016
-
Thermal Integrity Profiling Of Drilled ShaftsBy Gray Mullins
The construction of drilled shafts as well as other cast in place foundation alternatives relies heavily on good practices from the contractor, engineer, and inspector in order to produce a quality fo
Jan 1, 2010
-
A Numerical Study On Behavior Characteristics Of Steel-Concrete Composite Drilled ShaftsBy Hyu-Soung Shin
This study is concerned with the characteristics of the behavior of steel-concrete composite drilled shafts, a material that is used for large bridge foundations, and especially for weak submerged gro
Jan 1, 2007
-
Dynamic Pile Testing - The Caltrans Results - Dynamic Pile Testing - Who Needs It?By G. G. Goble
Dynamic pile testing is now over 20 years old as a routinely applied tool for evaluating driven pile installation. The first test on a cast-in-place pile was performed more that 15 years ago. The rese
Jan 1, 1993
-
Drilled Shaft Difficulties and a Micropile SolutionBy Jeff Jackson, Paul Axtell, David Graham
The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were
Jan 1, 2018
-
High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case StudyBy James Weaver
During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari
Jan 1, 2011
-
Analysis Of The Settlement Of A Single Axially Loaded Soil-Cement PileBy Jiwei Duan
The deformation and load transfer behavior of a single soil-cement column are studied with the finite element method. The results show that there is an effective length for a soil-cement column. Beyon
Jan 1, 2002
-
Ultimate Uplift Capacity Of Single And Group Piles In Clay ? SynopsisBy B. M. Das
Several laboratory model test results for the determination of the ultimate uplift capacity of single and group metal piles embedded in near-saturated clay have been presented. Based on the uplift tes
Jan 1, 2010
-
Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing ResultsBy Yogesh Prashar
Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December
Jan 1, 2002
-
Deep Caisson Foundations In China ? SynopsisBy C. Y. Liu
This paper principally deals with the application of caisson foundation in the Chinese bridge building industry, the different types of caisson foundation adopted, and their spheres of application. Ca
Jan 1, 2010
-
Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2002
-
Vertically Loaded Piles In Sand Subjected To Triangular Profiles Of Soil MovementsBy W. D. Guo
With an experimental apparatus developed recently, model tests on piles were conducted in sand subjected to triangular soil movement profiles. Four instrumented piles tests are reported, which show th
Jan 1, 2006
-
Review Of The Methods Used To Construct Large Diameter Bored Piles For Top Down ConstructionBy J. D. Findlay
The demands on development in London in recent years has led to the increasing use of top down construction methods in which there is a requirement to place steel columns to high tolerances into large
Jan 1, 1989
-
Driven PilesBy S. Merjan
Three papers were presented for discussion at the conference: 1) Instrumented driven steel tube piles at Canary Wharf; author: A. R. Gaba, United Kingdom. The author described the Canary Wharf
Jan 1, 1991
-
The Design Of Deepwater Wharves Which Are In The Complex Geological Conditions Of Pearl River EstuaryBy F. W. Liang
The geology of pearl River estuary belongs in strong weathered rock quaternary geological systen, so the conditions are complication. Since 80's we built the first deepwater wharf of Shenzhen chi
Jan 1, 1991
-
A New Analysis Of Data From Statnamic Tests On Piles In ClayBy William F. Anderson
A series of pile load tests (maintained load tests, constant rate of penetration tests at different rates, and statnamic tests) was carried out on an instrumented model pile installed in clay beds pre
Jan 1, 2006
-
Improving Very Compressible Soils By Stone Columns And Stiffening Concrete Columns ? SynopsisBy I. Stanculescu
The consolidation of thick and very compressible soil deposits by stone columns associated with cast-in-place plain concrete columns, has been performed for shallow foundations of some heavy industria
Jan 1, 2010
-
Shaft End Bearing Capacity In Cavernous LimestoneBy Issa S. Oweis
Limestone is a sedimentary rock composed primarily of calcite (calcium carbonate). In the presence of an aqueous solution of carbon dioxide (carbonic acid) bicarbonate radicals (2HCO3)- are produced t
Jan 1, 2009