New Technique To Drive Piles By Impact Hammer Inside The Pile - SynopsisBy Djk Arentsen
A new technique to drive tubular piles by impact hammer inside the pile has confirmed a dramatic reduction of noise and the opportunity to save steel. Also a reduction in driving time and a higher bea
Jan 1, 1996
-
Inference in the Detection of Pile Integrity Defects Using Current Quality Control MethodsBy T. Wulleman, M. Ansriou
Integrity testing is a primary quality control check on a product that is for the most part not accessible to visual examination. Their cost can be expensive when using direct methods of inspection (l
Jan 1, 2019
-
Ground Freezing In Urban Areas And Under Special ConditionsBy Frank Haehnig
Ground freezing is a technique which is used more and more in tunnelling under complex ground conditions. This paper will present three case studies which highlight different aspects of the ground
Jan 1, 2008
-
Hybrid Excavation Support System for the Union Station Revitalization ProjectBy Charles G. Crans, Naresh Gurpersaud
"Toronto’s Union Station, a National Historic Site occupying an entire city block, is the busiest commuter rail transportation hub in Canada. An extensive project is being undertaken to revitalize Uni
Jan 1, 2017
-
Experiences Using A Leader System For Long Cfa(Acip) Piles In HawaiiBy Damien Enright, Franz-Werner Gerressen
CFA/ACIP pile is the most used single pass drilling method for deep foundation installations. It is constructed by rotating and driving a Continuous Flight Auger (CFA) into the ground at a controlled
Oct 1, 2022
-
A Decade of Experience with Drilled Foundations in HonoluluBy James W. Niehoff
"Prior to 2003, most high rise structures in Honolulu, Hawaii were supported on driven pile foundations, extending through shallow coral strata and bearing in competent formations at depths of 100 ft
Jan 1, 2016
-
Risks Associated With Finite Element Modelling Of Cut And Cover StructuresBy Tony Suckling
The commercially available finite element program Plaxis has a key benefit over other finite element analysis programs in that it has a relatively simple user interface to input and output data. This
Jan 1, 2010
-
Parametric Analysis Of Piled Rafts Founded On A Tropical Clay Of BrazilBy Renato P. Cunha
The paper presents the results of a comparative and parametric analysis in which a numerical program developed exclusively for groups of deep foundations under general loading (vertical, horizontal an
Jan 1, 2002
-
Urban Challenges In Design, Co-Ordination And Construction Of Deep Foundations And Retaining WallsBy Pawan L. Sethi
Design and construction of deep foundations and basements is increasingly becoming more complex, as the density and frequency of urban development increases. This growth brings various associated chal
Nov 1, 2022
-
Piles In Expansive Soil For Large Tension Forces ? SynopsisBy G. W. Plant
This paper describes the design philosophy and construction details of piles between 25m and 32m deep to support 160m high and 110m base diameter cooling rowers for a major power station. It is sited
Jan 1, 2010
-
Instrumented Pile Load Tests on ACIP Piles for a Real Estate Project in Kolkata-A-Case StudyBy Krishnendu Mandal
"For a multi-story building project in Kolkata, a pile load testing program was conducted to minimize pile performance uncertainty resulting from variable subsurface conditions and to verify the pile
Jan 1, 2015
-
A Novel Method For Assessing The Reuse Of Under Reamed Piles As Part Of The Southbank Place ProjectBy Stuart Hardy, Xiangbo Qiu
The South Bank Place project comprised the redevelopment of the iconic Shell Corporation headquarters in Waterloo, located on the Southbank of the River Thames in central London. The site was original
May 1, 2022
-
Wrigley Field – The 1060 ProjectBy Darren S. Diehm
"Construction for the restoration and expansion of 102-year-old Wrigley Field in Chicago, Illinois began at the conclusion of the 2014 baseball season. This six year project involves structural upgrad
Jan 1, 1900
-
Model Specification Helical Anchor Foundations Tension Applications"This model specification includes sample text shown in normal font with commentary in italics. The commentary is intended to highlight project-specific items the specification writer should consider
Jan 1, 2016
-
Model Specification Helical Pile Foundations Compression Applications"This model specification includes sample text shown in normal font with commentary in italics. The commentary is intended to highlight project-specific items the specification writer should consider
Jan 1, 2015
-
Application Of Deep Mixing And Stone Column Techniques For Stabilization Of Large Earth Cum Rock Fill (Ecrf) Dam For An Irrigation ProjectBy Cemal Can Maslak, Vijaya Bhushan Rao, Vidyaranya Bandi, Karsten Beckhaus
A Large Earth Cum Rock Fill, ECRF Dam is under construction at Polavaram in the state of Andhra Pradesh in India as part of an irrigation project. The Embankment crest width of the dam is 12.5m and ba
Sep 1, 2022
-
Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information SystemBy Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler
Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e
-
Session 25 "Grout Mixtures and Materials I"By Stephan Jefferis
It is my understanding that the Scandinavians have done some fundamental work on durability. I have seen a study published whereby the author, Helen Anderson, comments on the durability of polyurethan
Feb 10, 2003
-
Dynamic Pile Testing for the Five Mates BridgeBy Jonathan G. Cannon
"This paper will describe dynamic pile testing conducted during installation of driven octagonal precast prestressed concrete piles used as the foundation for this bridge. The piles were long and henc
Jan 1, 1900
-
Geospatial Project Information Management System At Herbert Hoover DikeBy Jamey Rosen
A Project Information Management System (PIMS) was developed to manage and analyze QC data at the Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall (owned by the Jacksonville District of