Model Specification Helical Pile Foundations Compression Applications

- Organization:
- Deep Foundations Institute
- Pages:
- 17
- File Size:
- 296 KB
- Publication Date:
- Jan 1, 2015
Abstract
"This model specification includes sample text shown in normal font with commentary in italics. The commentary is intended to highlight project-specific items the specification writer should consider during development of the specification. In some sections, typical values are presented to indicate common practice, and these values may be changed to reflect project-specific requirements. The commentary should be removed before using the specification for a project. 1. SCOPE The work consists of designing, furnishing, installing, and testing helical piles used to support foundation loads (compression, tension and lateral), and any ancillary materials (e.g., load transfer devices, etc.) according to the project plans provided and these specifications. Unless otherwise noted, the installing contractor shall provide all labor, tools, equipment and materials necessary to install the required piles. The parties referred to in this specification are as follows: • The Owner is the property owner. • The Owner’s representative is the individual or firm hired by the Owner to design and oversee the overall project. • The pile designer is the individual or firm generally hired by the installing contractor to design the helical piles. • Installing contractor installs and tests (if necessary) the helical piles, and possibly tasks associated with the project. It is important to clearly define the roles and responsibilities of every party on each project to promote good communication and reduce potential for contractual misunderstandings. Different types of contractual vehicles (design-build, value engineering, etc.) require different roles and responsibilities for the various parties, which should be considered in specification development. The Owner will provide suitable access to the construction site for the installing contractor’s personnel and equipment. Unless specifically noted otherwise in the contract documents, the Owner will remove and replace any structures, utilities, pavements, landscaping or other surficial improvements in the work area as necessary to facilitate the work. The Owner will be responsible for overall construction oversight to minimize potential for developing unsafe conditions. The work may include post-construction monitoring of pile performance if required by the Owner or the pile designer to confirm performance of the piles subsequent to their installation. The work may also include installation of additional piles if the initial installation does not meet specified capacity or performance requirements. Responsibility for providing subsurface investigation shall be addressed in the bid documents. The Owner is responsible for providing to the installing contractor all available subsurface soils, rock and groundwater information and geotechnical testing data."
Citation
APA: (2015) Model Specification Helical Pile Foundations Compression Applications
MLA: Model Specification Helical Pile Foundations Compression Applications. Deep Foundations Institute, 2015.