Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Blast Design Parameters and Their Impact on Rock Fragmentation

    By B Prasad, M P. Roy, P K. Singh, C Drebenstedt

    Blasting operations play a pivotal role in the overall economics of opencast mines. The blasting subsystem affects all the other associated subsystems, ie loading, transport, crushing and milling oper

    Aug 24, 2015

  • AUSIMM
    Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South Africa

    By G Kirk

    Definition and delineation of in-pit ore and waste material are the most significant tasks for an open pit production geologist; adding or destroying value in the mining value chain. Anglo American’s

    Aug 22, 2011

  • AUSIMM
    Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016

    By J Darbritz

    "This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016

    Nov 15, 2016

  • AUSIMM
    Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case Study

    By P Crittenden

    Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant

    Jan 1, 2009

  • AUSIMM
    The effects of operational parameters on HydroFloat® performance in a metalliferous application

    By A J. Morrison, K Demir, J Kohmuench, K Runge, C Evans

    The Eriez HydroFloat® is a flotation device capable of recovering significantly coarser and lessliberated particles than is possible using a conventional mechanical flotation cell. Originally develope

    Aug 24, 2022

  • AUSIMM
    Overview of the experimental phase equilibria studies of the Ni-Sn-S, Cu-Sb-S, Cu-Sn-S, Fe-Sb-As and Fe-Sn-As systems

    By M Akhtar, E Jak, M Shevchenko

    This article presents an overview of the experimental phase equilibria studies of S-containing systems (Ni-Sn-S, Cu-Sb-S, and Cu-Sn-S) and As-containing systems (Fe-Sb-As and Fe-Sn-As). These systems

    Jun 17, 2024

  • AUSIMM
    An Environmental Collaborative Research Program ù Field Studies Contributing to the Sustainability of Ne w ZealandÆs Mineral Industry

    By T Clemens, D Trumm

    Adopting environmentally acceptable practices in New Zealand is a crucial requirement for mineral wealth development. Recent planned expansions in the coal and gold industry have increasingly placed m

    Jan 1, 2004

  • AUSIMM
    Effect of alumina on microstructures of iron ore sinters from the perspective of the phase equilibria of the CaO-SiO2-Fe2O3-Al2O3 system

    By A Takahashi, Y Uchisawa, M Hayashi, T Watanabe, M Susa

    Owing to the deterioration of iron ore, the Al2O3 concentration in iron ore increases, and thus it is important to investigate the effect of increment in Al2O3 concentration on the microstructures of

    Jun 19, 2024

  • AUSIMM
    Metal cap versus steel lining system at Philsaga Mining Corporation’s Ø6100 mm SAG mill

    By N S. Weerasekara, S Town, E Lessing, J A. De Torres

    Philsaga Mining Corporation (Philsaga) had three main aims in converting their lining system from steel to metal cap. They wanted to increase mill availability, minimise localised high wear and optimi

    Aug 29, 2018

  • AUSIMM
    Evaluation of the impact of modifying froth launders in an industrial flotation bank using novel flotation models

    By A Yáñez, P Vallejos, R Grau, J Yianatos

    In flotation cells, especially in large flotation units, froth management is a crucial variable that should be considered during the design phase or optimised to improve the performance of existing fl

    Aug 24, 2022

  • AUSIMM
    What is the Future for Magnetite Projects in Australia and Why Have Some of the New Projects Been So Problematic?

    By D Connelly

    Magnetite orebodies generally means mining lower grade iron ores, crushing and grinding with significant energy costs in processing and the capital costs being significantly higher than for direct shi

    Jul 13, 2015

  • AUSIMM
    Flotation as an Operation of Macromolecular Mass Transfer

    By M R. Drumond

    The present work presents a new theoretical interpretation of the flotation process, which can also be applied to other mineral processing physical unit operations. This interpretation is part of the

    Jan 1, 2005

  • AUSIMM
    XCT investigation on the generation of fatigue in autogenous grinding pebbles and its contribution to pre-weakening before fracture

    By J Kuva, M Parian, B I. Pålsson

    One of the main factors affecting the suitability of an ore for autogenous grinding is the ore’s competency, ie providing enough critical stones for the grinding process. Several experimental test rou

    Aug 24, 2022

  • AUSIMM
    The Wonawinta Silver Project – Value Engineering at Work

    By P G. Greenhill

    The Wonawinta silver project near Cobar in NSW is under development by Cobar Consolidated Resources Limited (CCR). RMDSTEM Limited is part of the owner’s team for feasibility, design, engineering, con

    Aug 8, 2011

  • AUSIMM
    The Value of Geological Human Capital in the Improvement and Maximisation of Ore Deposit Value – The Kalgoorlie Consolidated Gold Mines Experience

    By D Cooke

    In 2010, Kalgoorlie Consolidated Gold Mines (KCGM) was Australia’s largest gold producer, with total annual production of 788 000 ounces. Of the gold produced by KCGM in 2010, 95 per cent was extracte

    Aug 22, 2011

  • AUSIMM
    Pre-Competitive Exploration Research in Australia û A 30 Year Assessment

    By May J. R

    Exploration, including research, has fuelled the enormous expansion of the Australian mineral industry in the last three decades. Analysis of success and failure in exploration and research has the

    Jan 1, 1992

  • AUSIMM
    The Frieda Kiss – Keeping It Simple

    By S J. Tear, L D. Queen

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Frieda River Project is located in the north-west of Papua New Guinea. The target commo

    Mar 18, 2015

  • AUSIMM
    Managing Uncertainty on the Cut 8 Project

    By G M. Jones, J Rademan

    Debswana, owned by the Government of the Republic of Botswana (GRB) and De Beers in a 50:50 joint venture partnership, operates the Jwaneng diamond mine in Botswana - the most valuable diamond mine in

    May 24, 2012

  • AUSIMM
    Effective Use of Mine Waste in the Design of a Residue Storage Facility, Pilbara Region, Western Australia

    By A Wanninayake, E Novello, I Gillani

    A residue storage facility (RSF) was designed to cater for Davidson Creek Area and Robertson Range Area operations under the FerrAus Pilbara iron ore development project in the Pilbara Region, Western

    Aug 12, 2013

  • AUSIMM
    Comparative Life Cycle Impacts of Deep Ocean Minerals and Land-based Counterparts

    By B C. McLellan

    The decline of ore grades on land, increasing demand and high prices for various minerals have led to an increased interest in mining the deep ocean sea floor. The potential deep ocean reserves are va

    Nov 4, 2015