Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Single Level Extraction At KoffiefonteinBy R. L. Pienaar
Paper written on project work carried out in partial fulfilment of B Eng (Min. Eng.) degree A study was conducted to investigated and compare the feasibility of two single level extraction layouts
Jan 1, 2006
-
Leachwell Versus Fire Assay: Comments from Assay Quality Assurance at Tarmoola Gold MineA fundamental component of grade control at Tarmoola Mine has been the monitoring of assaying through quality assurance programs. The programs have concentrated on issues related to accuracy and preci
Jan 1, 2000
-
Cokriging And Its Effect On The Estimation PrecisionBy E. Yalçin
The data set often contains one or more secondary variables. These secondary variables are usually spatially cross correlated with the primary variable. The addition of the cross-correlated informatio
Jan 1, 2005
-
The System Silver-Gold: The Reproducibility of Silver Activity Measurements Using the Solid Ionic Conductor, Silver-B-AluminaBy Browner R, Lincoln F. J
The activity of silver in solid gold-silver alloys (electrum) has been measured with an electrochemical concentration cell based on the super ionic conductor silver-i3-alumina in the temperature range
Jan 1, 1983
-
Refinery effluent water reduction and treatmentBy S. Pule, Z. Ndabezimbi, A. Hefer, E. Cupido
This article outlines various projects implemented at Rand Refinery to reduce effluent generation and freshwater consumption. The refinery generates about 2800 m³ of effluent annually and has initiate
Mar 5, 2025
-
IC 8863 Proceedings Of Seminar On The Role Of Overburden Analysis In Surface Mining, Wheeling, W. Va., May 6-7,1980 - Sponsored By The American Council For Reclamation Research And The Bureau Of MinesThis Bureau of Mines publication contains the texts of the four papers presented at the May 6-7, 1980, seminar on the role of overburden analysis in surface mining. Coverage includes the geologic dist
Jan 1, 1981
-
ISACONVERT? ? Continuous Converting Of Nickel/PGM MattesBy M. L. Bakker
Keywords: Pyrometallurgy, top submerged lance (TSL), nickel, PGM, calcium ferrite, lime ferrite The ISASMELT? top submerged lance (TSL) bath smelting process was developed in Mount Isa, Australia
Jan 1, 2011
-
Removal Of Arsenic And Heavy Metals From Mine Drainage And Ground Water In The Black Hills Of South DakotaBy A. D. Davis
The Gilt Edge Superfund Site is a former heap-leach gold mine that currently is being remediated in the Black Hills of South Dakota. Mine runoff water is treated before release from the site. The fi
Jan 1, 2011
-
Dewatering Of Coal Fines Using A Super Absorbent PolymerBy F. Peer
In most coal preparation processes, water is a necessary medium, but the presence of water in coal after it has been cleaned has a negative impact on transportation costs, handling and specific energy
Jan 1, 2003
-
Preparing a Written Blast PlanBy David Ziegler
Rough sketches, field notes, an on-site conference or a phone call may no longer suffice to establish your blast plan at a job site. More and more, general contractors, site supervisors, owner re p re
Jan 1, 2004
-
Mitigación de pasivos ambientales mineros en la cuenca Alta del Río PiscoBy José Vidalón
Dado que las lagunas de Papacocha y la Virreyna sufren los efectos de los drenajes ácidos de minas abandonadas, relaves y desmontes depositados en sus áreas de influencia, se ha previsto el control de
Sep 13, 2001
-
Optimal Inference of Modelling Parameters to Simulate Complex Trends across Soft Boundaries – A Case Study in Heavy Mineral SandsBy T Wambeke, J Benndorf
A risk-robust development of a heavy mineral resource requires an assessment of the geological uncertainty and spatial variability of the key factors impacting the mining and processing operation. Att
Nov 24, 2014
-
OFR-112(2)-82 Safety Analysis Of The Impactor Shaft Sinking System - Safety ManualBy P. M. Daling
This report, sponsored by the U.S. Bureau of Mines, presents the results of an examination of the safety of the impactor shaft sinking system in comparison to conventional shaft sinking technology. De
Jan 1, 1982
-
Piled Foundation Design as Reflected In Codes and StandardsBy Bengt H. Fellenius
"ABSTRACTAn example from a guidelines document for the Eurocode is discussed that addresses design for geotechnical strength of piled foundations in settling soil, generating drag force and downdrag.
Jan 1, 2014
-
A Complete Approach to Flowsheet Development - Niquel do Vermelho (CVRD) Case StudyBy Mike Adams
A comprehensive pre-feasibility study has been conducted by Companhia Vale do Rio Doce CVRD) for Niquel do Vermelho nickel laterite deposit. Within this study, five integrated flowsheet options were e
Jan 1, 2004
-
Improving Real-Time Expert Control Systems Through Deep Data Mining Of Plant Data And Global Plant-Wide Energy Monitoring And AnalysisBy L. B. Hales
Expert control of grinding and flotation plants has been successfully used in the minerals industry since the 1970?s. The earliest of these systems were written in a hard-coded fashion in FORTRAN, BA
Jan 1, 2012
-
Blasting Effects on Pore Pressure in Coal Impoundments (Dry Conditions - Part I)By Joshua Micah Hoffman, Jhon Silva-Castro, Kylie Larson-Robl
A coal mine impoundment failure has the potential to be environmentally devastating and life-threatening. It is well documented that after seismic events slope failures in impoundments can occur. It h
Jan 1, 2015
-
Remediación de pasivo ambiental de Ticapampa y creación de valor a los residuos inertesBy Rony Yupanqui C
El presente trabajo señala el proyecto de remediación de los relaves mineros realizado en la relavera Ticapampa, ubicado en el Distrito de Ticapampa – Huaráz, región Ancash, con el objetivo de remedia
Sep 12, 2011
-
Critical Delay Timing in Multi-Level Mass Stope Blast DesignBy Dale Preece, Stephen Chung, Qian Liu
Stoping is one of the widely adapted methods in underground mining. In this method, fanned or parallel holes are often drilled from a top sill down to a sub- level in the ore zone and blasted ring by
Jan 1, 2003
-
OFR-39-91-V1 Maintainability Design [Guidline For] Of Underground Mining Equipment: Volume I - Final Technical ReportBy E. J. (Kirk) Conway
The objectives of this project were to: (1) determine the extent to which maintainability design concepts and principles have been applied to the design of underground coal mining equipment, (2) try t
Jan 1, 1988