Abstract
A comprehensive pre-feasibility study has been conducted by Companhia Vale do Rio Doce CVRD) for Niquel do Vermelho nickel laterite deposit. Within this study, five integrated flowsheet options were evaluated via batch and pilot campaigns at Lakefield Oretest, over an intensive six-month period from receipt of ore to final reporting. Key technical objectives set by the client included demonstrating the technical viability of the beneficiation of several ore types, processing through integrated pressure acid leach/mixed hydroxide precipitation (PALIMI-IP) and mixed sulfide precipitation (PALIMSP) circuits, and the treatment of barren liquors to meet stringent environmental requirements. Refining of the MHP was by ammonia re-leach and solvent extraction (SX) to produce LME-grade nickel cathodes, NiCO3, NiO and CoS. LME grade nickel and cobalt was also produced by oxidation of the MSP and hydrogen reduction on the leachate. The database and data acquisition system, along with web-based reporting, enabled rapid turnaround on both daily and more comprehensive run reports, making it possible for speedy and confident decisions on operating conditions of the complex flowsheets. The high value of developing such data is emphasized and discussed as pivotal in the successful progression of laterite projects through to sustainable commercial viability. Keywords: Flowsheet, CVRD, Nickel, Piloting, Pressure, Leach, Refining.
Citation
APA:
(2004) A Complete Approach to Flowsheet Development - Niquel do Vermelho (CVRD) Case StudyMLA: A Complete Approach to Flowsheet Development - Niquel do Vermelho (CVRD) Case Study. The Minerals, Metals and Materials Society, 2004.