Proactive Interburden Fracturing Using Underground Inseam Drilling with Validation MonitoringA series of gas inrush events occurred during development at Grosvenor mine resulting in exposure to elevated levels of methane at the production face. A total of 22 gas inrush events occurred releasi
Jan 7, 2020
-
Tunneling And Trenchless Technology Key To Charleston?s InfrastructureBy Larry F. Drolet
Charleston, SC is anything but boring. The city was founded in 1670 and has played a significant role throughout the history of the United States. Located along the coast of the Atlantic Ocean in the
Jan 1, 2013
-
Foamed Grout Controls Underground Coal-Mine FireBy Joseph J. Feiler
Fires in underground coal mines are persistent problems anywhere in the world that coal is mined. Coal fires pose safety and health hazards in the form of mine subsidence, loss of energy reserves, de
Jan 1, 2000
-
Role Of The Mill In A Competitive Minerals Company - Is Low Cost Enough?By Bruce Cavender
Historically, the processing function has been regarded as efficiently managed as long as production costs were kept low, recovery was adequate and sufficient plant capacity was avail-able. In this pa
Jan 1, 2008
-
Mining on the Edge of the Murray MineBy Sam Ash
The Murray Mine was one of the first mechanized cut-and-fill underground gold operations in northern Nevada. At the end of 2002, mine production began to decline. So the mine entered a phase of remnan
Jan 1, 2006
-
Benefits Analysis Of Expert Control SystemsBy A. Broussaud, J. D. McKay
Benefits analysis of adaptive Expert control systems operating at plants in Africa and the United States are presented. Proper statistical tools and techniques are discussed. Technical and practical
Jan 1, 2001
-
Rock Mechanics Study Of A Longwall PanelBy Lewis V. Wade
This paper summarizes the results of the rock mechanics monitoring program performed as part of Old Ben Coal Company's longwall coal mining demonstration project conducted in cooperation with the
Jan 1, 1977
-
Semi-Autogenous Grinding (SAG) Mill Liner Design And DevelopmentBy D. Royston
SAG mill liner development draws primarily on practical experience from SAG milling operations supported by computer-based modeling of charge motion in SAG mills and on established good design practic
Jan 1, 2007
-
Mechanisms Involved In Reactive Flotation Of DolomiteBy A. El-Midany
Dolomite impurities are increasing in the currently mined phosphate deposits in Florida. Several research efforts have been conducted in various laboratories around the globe to find methods to econom
Jan 1, 2009
-
Team Organization in the Mining IndustryBy David M. Spatz
The way people interact, collaborate, learn and improve can have a profound impact on a company’s efficiency, performance, productivity and return on investment. This is the motive behind corporate e
Jan 1, 2000
-
Railroad Crossing by Microtunneling: MTBM Successfully Mines Side-by-Side Twin Tunnels Six Feet Below Railroad - West Elizabeth Avenue Storm Drainage Project, Linden, New JerseyBy Keith Schaeffer
This paper presents a history of the planning, engineering and construction completed for the railroad tunnel crossing part of the West Elizabeth Avenue Storm Drainage Project, undertaken to relieve f
Jan 1, 2008
-
Shutdown and restart at Pinto Valley - a maintenance viewpointBy Robert S. Shank
Introduction The Pinto Valley open-pit copper mine is located in southern Arizona, 11 km (7 miles) west of Miami. Production at Pinto Valley began in 1974. About 350 Mt (386 million st) of ore and wa
Jan 4, 1985
-
Dewatering for the Lenox Avenue Subway Reconstruction ProjectBy Paul C. Schmall, Thomas Tuozzolo, Arthur B. Corwin
The Lenox Avenue Reconstruction Project involved the excavation and replacement of 750 m (2,500 ft) of deteriorated subway invert concrete, 5 to 7 m (15 to20 ft) below water table in very permeable gr
Jan 1, 2001
-
Practical Methods Of Shallow Shaft SinkingBy James J. Brady, Joginder S. Bhore, Robert B. Gordon, Jimmy W. Honeycutt
The authors of this paper have a combined construction experience of 70 years. They have served as engineers and managers on projects throughout the United States and Canada. Approximately 50 shafts h
Jan 1, 1985
-
Looking for Mr. Good ContractBy Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb
Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac
Jan 1, 2005
-
Design of the University Link Tunnels and StationsBy Daniel N. Adams
The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter
Jan 1, 2008
-
Two Tunnels in Totally Different Geological Formations Driven by the Same 7M Double-Shield TBM with an Extremely Thin-Walled Monoshell Honeycomb Segmental Lining SystemBy Wolfgang Guetter, Wolfgang Weber
The upgrading project for two hydropower plants in Slovenia, Europe, requires two new pressure tunnels: Plave II (5.9 km Flysch) and Doblar II (3.6 km Limestone). It is the worldwide largest applicati
Jan 1, 2001
-
New York Subway Caverns and Crossovers—A Tale of Trials and TribulationsBy Charles Stone, Madan Naik, Drupad Desai, Karel Rossler
Planning of New York’s new subway line dictated the location of shallow underground station caverns and track crossovers. Clear span openings ranging from70 feet to 100 feet and lengths in excess of 1
Jan 1, 2005
-
Influence of highwall mining progression on web and barrier pillar stabilityBy M. J. Raffaldi, K. W. Harris, K. A. Perry
"Highwall miners have been widely used to extract additional coal reserves from existing surface operations, particularly on contour operations in the Appalachian coalfields. Using a continuous miner
Jan 1, 2014
-
Lyon–Turin Long and Deep Railway Tunnel ProjectBy P. Fauvel, V. Nasri
In January 2001, French and Italian governments signed an agreement for the construction of a new Lyon-Turin railway line. This project includes a tunnel of 53.1 km length and a maximum of 2500 m over
Jan 1, 2005