Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Fundex - Deep Foundation Institute Tensile Pile Test Seminar - September 9 & 10, 1993 - Introduction
After the Loma Prieta Earthquake, which caused major damage to viaducts in the Bay Area, the California Department of Transportation set up a test programme for foundation piles. Funderingstechnieken
Jan 1, 1993
-
PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History
By Chris D. Shewmaker
So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po
Jan 1, 2004
-
The Bawang Pile ? A New Type Of Pile ? Synopsis
By B. Broms
The "Bawang Pile" (in english "onion" pile) described in the article consists of a cased concrete shaft and an expanded base. The steel casing is first driven by an internal drop hammer and then the b
Jan 1, 2010
-
Use of Porous Concrete in Secant Bored Pile Walls
By Matthias Pulsfort, Markus Herten, Rolf Breitenbücher, Claudia Fierenkothen
"Secant bored pile walls are frequently used as retaining walls in watertight excavations to cut off ground water aquifers and are subsequently exposed to ground water pressure loading in addition to
Jan 1, 2017
-
Dynamic Load Testing of Drilled Deep Foundations
By Paikowsky, Samuel G.
"Due to the way drilled deep foundations are being constructed, their structural integrity and geotechnical capacity are highly variable. Drop weight systems are increasingly being used to dynamically
Jan 1, 2015
-
Review Of The Methods Used To Construct Large Diameter Bored Piles For Top Down Construction
By J. D. Findlay
The demands on development in London in recent years has led to the increasing use of top down construction methods in which there is a requirement to place steel columns to high tolerances into large
Jan 1, 1989
-
Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And Meeting
By Peter J. Nicholson
A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th
Jan 1, 1998
-
LRFD and Its Implications for QC/QA of Deep Foundations
By Bernard Hertlein, Chia K. Tan
"The move to LRFD methods for structural design by AASHTO, ACI, AISC , ASCE, and the FHWA has been a major change for the American construction industry. The deep foundations industry has arguably bee
Jan 1, 2005
-
Pile Top Hydraulic Hammer Drive Down The Hole Chiselling Round Steel Piling System - Summary
By J. Nakayama
For installation of round steel piles or cast-in-place pile construction through boulder contained ground or rocky formation, usual system does not function properly or impossible to work. This paper
Jan 1, 1999
-
Non-destructive Testing Of Unknown Bridge Foundation Lengths Using Parallel Seismic Testing
By Chetan D. Savani, Mike K. Muchard
The necessity to evaluate undocumented foundation lengths is essential in assessing the useable life, need for scour protection, retrofitting, or full reuse of existing bridge foundations. For this pu
-
Sonic Integrity Testing - 1.0 Summary
By A. F. van Weele
In general cast-in place piles will have an irregular pile shape. However, it is possible that these irregularities are so large that they may lead to pile deficiencies. It is very rarely possible to
Jan 1, 1987
-
Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial Soil
By Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi
"Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei
Jan 1, 2014
-
Cyclic Degradation Of Pile Foundations For Offshore Wind Turbines
By Fabian Kirsch
Cyclic behaviour of axially loaded piles has been an issue since studies revealed that the capability to transfer skin friction into the ground is highly depending on the level and the number of load
Jan 1, 2011
-
Old Sewer, Big Risks: Managing Risks During The Design And Construction Of A 21-Story Building Adjacent To A Critical 100-Year-Old Sewer Structure
By Damian R. Siebert
Risk-reduction measures implemented during the design and construction of a 21-story pile-supported building adjacent to a below-grade 100-year-old sewer structure were keys to a successful foundation
Jan 1, 2011
-
Experimental And Theoritical Studies On Pile Capacity - Synopsis
By K. Rambha Devi
The paper is an attempt to co-relate the findings of pile capacity using a number of formula suggested by various authors with the actual field load test results. Five locations consisting of wholly s
Jan 1, 1996
-
Time Dependent Open-End Pipe Pile Capacity Assessment By Dynamic And Quasi-Static Methods
By Derrick D. Dasenbrock
Three piers of a new river bridge are supported on 1.067 m diameter open-end steel pipe piles. At time of drive, and after pile re-strikes, high-strain dynamic capacity values at plan tip elevations,
Jan 1, 2006
-
Pile Foundation - A Critical Study Of Some Design Aspects. - Synopsis
By S. L. Karunakaran
Selection of an appropriate foundation system requires great skill and ingenuity on the part of the designer. Certain guidelines for choosing between a pile and raft foundation are presented. A number
Jan 1, 1996
-
Evaluation For Stone-Column Composite Foundation In Rayleigh Wave Method
By Zhang Baoshan
In this paper, the forced features and dynamic behaviors of stone-column composite foundation are concisely related. The characteristics of Rayleigh wave method is summarised. This method is proposed
Jan 1, 1991
-
Diving Underground - Through a Hologram - To Better Understand Foundation Risk
By Scott A. Anderson, Benjamin S. Rivers, Derrick D. Dasenbrock, Silas Nichols
Unknown geotechnical conditions are a major source of risk. Unexplored places vastly outnumber the sampled and tested ones, and widely spaced boreholes with intermittent tests and samples are the norm
Jan 1, 2019
-
A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test Results
By Richard D. Short
The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field
Jan 1, 2000