Doyle Drive - Extreme Pile Installation
By Peter Faust
The foundations for the new South Viaduct Bridge in San Francisco were extremely challenging due to the requirement for very large and deep piles installed adjacent to historic structures. Drilled sha
Jan 1, 2011
-
Residual Loads Measurements in Driven Steel H-Piles
By Reda M. Bakeer
"Measurements obtained during load testing of two steel H-piles driven at a site in Northeastern Mississippi are discussed. The general site conditions, equipment used, testing procedures and results
Jan 1, 2017
-
Evaluating Axial Elastic Pile Response From Cone Penetration Tests (The 2009 Michael W. O?Neill Lecture)
By Paul W. Mayne
Axial pile performance can be rationally evaluated within an elastic continuum framework using field results from seismic piezocone tests (SCPTu). Adopting a versatile Randolph-type elastic pile model
Jan 1, 2009
-
Design Considerations For Underground Subway Station - Introduction
By Mohammed Z. Islam
As cities are growing all over the world, the need for urban transportation facilities are on the rise. Designers (of these facilities) today are faced with a number of constraints for their design, o
Jan 1, 1993
-
Analysis of Structural Capacity and Stiffness of Drilled Shafts with Construction Defects and Repairs
By John P. Turner, Benjamin J. Turner
"Non-destructive testing and evaluation (NDT/NDE) methods have become standard tools as part of the post-construction quality assurance of drilled shaft foundations. In responding to anomalies, founda
Jan 1, 2016
-
25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction Grouting
By Frank Callanan
The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour
Jan 1, 2009
-
Development and Experiences on Versatile Applications of RD-pile Wall
By Fredrik Sarvell, Leo-Ville Miettinen, Veli-Matti Uotinen
"Abstract The continued concentration of building activities in cramped areas of city centres means more underground construction and facilities. Demand to minimize execution time and any kind of dist
Jan 1, 2014
-
Seattle Shored Excavation - Design, Construction, Monitoring
By David Winter
The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of
Jan 1, 1987
-
Drilled Piers With Base Preloading By Grouting - 1. Introduction
By Boleslaw A. Klosinski
Drilling of a pier hole is accompanied with stress releasing in the surrounding soil and often with loosening of soil at the pier base. In effect the drilled piers are more deformable than driven pile
Jan 1, 1995
-
-
O Street Anchored Precast Lagging And Soldier Pile Retaining Wall
By John Wise
Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu
Jan 1, 2003
-
Interaction Between New Drilled Shafts And Existing Timber Piles At Holland Tunnel Approach
By Aly M. Mohammad
The 12th and 14th Street Viaducts, which carry Route 139, are located west of the Holland Tunnel in Jersey City, New Jersey. The two viaducts, provide access to and from the Holland Tunnel (which con
Jan 1, 2009
-
Design Of The BMIP Boat Section - Introduction
By Kenneth Pidgeon
The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.
Jan 1, 1994
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction
By Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994
-
Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)
By David B. Paul
"ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class
Jan 1, 2014
-
Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT Station
By Allan Sylvester
This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant
Jan 1, 2002
-
-
Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell Interchange
By Mark Maday
As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o
Jan 1, 2011
-
Driven Pile Foundation Design And Construction Genentech Hall - UCSF Mission Bay Campus
By Robert E. Fosse
Driven 14-inch-square concrete piles were used as the foundations of Genentech Hall at the new University of California, San Francisco Mission Bay Campus. The five-story, steel eccentrically-braced fr
Jan 1, 2002
-
A Tale of Two Dams: Performance of Deep Cutoff Walls
By Donald Bruce, Mark Harris, Wesley Schmutzler, James Sanders
"This paper evaluates the history, construction and most importantly the performance of two remedial seepage cutoff walls installed in two major dams in the United States. Beaver Dam, on the White Riv