Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Experience of the Oxygen Bottom-Blown Converter in PoscoBy C. S. Ha, H. S. Choi, D. Y. Shin
POSCO installed a new 100 ton oxygen bottom-blown converter in 2013 for the development of new steelmaking process named as PS-BOP which is reading POSCO-Saarstahl Basic Oxygen Process. This process w
Jan 1, 2015
-
Simulation of microporosity formation in A356 aluminum alloy casting: The Role of hydrogen transportBy J. D. Zhu
A numerical model for predicting microporosity formation in aluminum castings has been developed, which describes the redistribution of hydrogen between solid and liquid phases, the transport of hydro
Jan 1, 2005
-
Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen
This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr
Jan 1, 2004
-
Building the Next Major Iron Ore Mine in the Labrador TroughCertain information contained herein regarding Champion Minerals Inc., including management?s assessment of future plans and operations, may constitute forward-looking statements under applicable secu
May 1, 2011
-
Concepts for Co-Mixing Waste Rock and TailingsConventional waste management practices produce two waste streams for the construction of separate disposal facilities. The design of tailings impoundments is usually controlled by physical stability.
Nov 1, 2002
-
Considerations regarding the definition of remotely located integrated cogeneration plants. Part 1By D. Berkley
"The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining a
Jan 1, 2003
-
Management of Nitrogen Compounds in Mine Wastewater: Comparing Selective Adsorption and Electro-Oxidation to other Treatment MethodsBy C. Xiao, F. Mohamm, A. Borsoi
"Nitrogen compounds produced by cyanide destruction and/or blasting are often a cause of concern for environmental compliance and at times, for water re-use in metallurgical circuits. Natural attenuat
Jan 1, 2017
-
Towards an Integrated Framework for Asset and Process Health Monitoring and Optimization on a Milling Circuit"In mining operations, it is widely accepted that strategies to drive operational goals must revolve around improving plant availability, reliability and process efficiency. In this paper, an integrat
Jan 1, 2014
-
A Best Practice Database for Energy Management Initiatives in the Mining IndustryBy M. Y. Levesque
The Australian Government?s Energy Efficiency Opportunities (EEO) program launched in 2006 obliges companies that use more than 0.5 PJ (petajoule) or roughly 139 GWh (gigawatt hour) per year to conduc
Aug 1, 2013
-
Mathematical Definition of Particle HydrophobicityAs a bubble travels through the pulp region of a flotation cell, it will collect the most hydrophobic particles of an intermediate particle size range, this being the primary source of true flotation
Jan 1, 2006
-
Mechanical Integrity versus Process Safety Management RequirementsBy Hugo Julien
According to OSHA 29 CFR Part 1910.119 (Process safety management of highly hazardous chemicals), Canadian Provincial Safety Standard Acts or Federal laws, the owner of stationary equipment (Boilers,
Jan 1, 2014
-
Geology of the Ore Fault Ni-Cu Deposit, Bird River Sill Complex, ManitobaBy P. Walford, C. Mealin, D. Good
"The geology of the Ore Fault Ni-Cu deposit has been reinterpreted in the light of recent studies of the geology of the Neoarchean Bird River Sill Complex and the occurrence of economic Ni-Cu and Zn-C
Jan 1, 2009
-
The Installation and Operation of Heap Leaching Test FacilitiesBy J. Maheu
Heap leaching is an old technique for the recovery of copper, but a fairly new technique for the recovery of gold.The paper outlines the equipment required for the establishment of heap leaching test
Jan 1, 1982
-
The Challenges and Ramp op of Filtered Tails in a Modern Production Plant – Éléonore Project ExperienceBy Andy Fortin, Jeet Basi, Simon Hille
Goldcorp’s Eleonore mine is situated in Ell Lake area in the northeastern part of the Opinaca reservoir in the James Bay region of Quebec. The design of the 7000 t/d process plant includes crushing,
Jan 1, 2016
-
Applied communicationsBy B. J. Clauzier
"The Falconbridge Limited approach to employing communication equipment is first, to determine what is required in a given situation, second, to evaluate the possible alternatives, third, to select th
Jan 1, 1987
-
Rationale for Quantum Leap Innovations in Mine FillBy J. H. Nantel
Indications are that underground mining is gaining favour with large and small mining companies due to environmental and sustainability concerns. Dramatic changes to mine fill technologies will be nee
May 1, 2007
-
Design. Aspects of Ground Consolidation by the Freezing Method for Shaft Sinking in SaskatchewanBy Witold J. S. Ostrowski
Stabilization of water-bearing sediments by the freezing method for shaft sinking has been used for over 80 years on the European Continent. The real application of this method in Canada started with
Jan 1, 1967
-
The Kumtor Gold Mill Start Up and Start up ChallengesBy John Kazakoff, Andrew Mortimore
"Production at the remote Kumtor Gold Mine in Kyrgyzstan commenced on schedule in December 1996.The ore mined during the first few months of 1997 from the upper benches of the pit did not produce the
Jan 1, 1999
-
Impact of Operating Conditions on Emissions from Mine Haul Trucks Operating in the Oil Sands Region of Alberta, CanadaBy R. J. Schafer-Frentz, T. G. Joseph, M. Curley
"Greenhouse gas emissions—specifically of carbon dioxide—are a concern in Canada, where industrial sectors such as mining are stringently regulated for carbon release. Cumulative emissions are positiv
Jan 1, 2019
-
Control of Size Distribution of the Ore Feeding a Semi Autogeneous Grinding MillBy Claude Bazin, François Robichaud
"The control of the operation of semi autogeneous grinding (SAG) mills is mainly achieved through adjustments of feed rate, water addition and speed of rotation. With the introduction of image based s
Jan 1, 2013