Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Effect of Silicon Content and Solutionizing Temperature on the Mechanical Properties in a Sand Molded Aluminum 206 Casting

    By F. Chiesa, Jeremy Carignan, B. Duchesne, D. Levasseur

    "Aluminium A206 (AlCu4) is one of the strongest aluminium casting alloys with tensile properties approaching those of ferritic ductile iron. If the specification on the silicon content (< 0.05%) is ea

    Jan 1, 2016

  • CIM
    The Mesozoic Clay Deposits of the Mattagami and Missinaibi Rivers, Northern Ontario

    By W. S. Dyer

    Considerable attention has been paid in recent years to the fire-clay and silica-sand deposits of the Mattagami and Missinaibi rivers and ? to the lignite occurring in them. The fireclay especially de

    Jan 1, 1928

  • CIM
    Engineering Challenges in Mining

    By C. E. White

    The depletion of higher grade mineral reserves will accelerate the trend toward production from progressively larger and lower grade deposits. The discovery of adequate reserves of leaner ores will re

    Jan 1, 1967

  • CIM
    The CIMVAL Code for the Valuation of Mineral Properties

    By CIMVAL

    This Code for the Valuation of Mineral Properties (the “CIMVAL Code”) is the result of a review more than a decade after the release in 2003 of the “Standards and Guidelines for Valuation of Mineral P

    Nov 29, 2019

  • CIM
    The development of the coal mining industry in Canada

    By A. Brown

    "The first printed report on Canada's coal resources was published in Paris in 1672(1. Written by Nicholas Denys, then Governor for France of Isle Royale (Cape Breton Island), the report dealt exclusi

    Jan 1, 1985

  • CIM
    The Prevention of Silicosis by Metallic Aluminium (9487d148-58bd-4d3f-813b-31c165c977da)

    By J. J. Denny

    IN a preliminary paper (1) it was shown that the addition of small quantities of metallic aluminium powder almost completely inhibited the solubility of siliceous material in the beaker. Six rabbits e

    Jan 1, 1939

  • CIM
    Advanced Blasting Technology for Large Scale Destress Blasts at Brunswick Mine

    By Qian Liu

    Mining in highly stressed ground conditions has been an increasing challenge at the Brunswick Mine. Two large regional pillars were established on the 1000 m Level to support the ground for safe extra

    May 1, 2003

  • CIM
    Coordination Guidelines for Virtual Design and Construction

    By Anoop Sattineni

    Over the past decade the use of BIM in the AEC industry has grown several fold and with it the number of standards available for implementing BIM. The ?National BIM Standard? by buildSmart Alliance, t

    Aug 1, 2013

  • CIM
    Sub-Sea Faulting in the Lismore Area, Nova Scotia

    By H. L. Cameron

    General Statement In July, 1948, experimental aerial photography o shallow water zones on Northumberland strait was carried out by the Nova Scotia Research Foundation. This work was designed to tes

    Jan 1, 1949

  • CIM
    A Simple Solution to Assess Pore-Water Pressure in Barricades Made of Waste Rock

    By L. Li

    ABSTRACT Stope backfilling is a common operation in many underground mines, which requires a barricade at the base of the stope near the drift entrance to retain the backfill in place. In this paper,

    Jan 1, 2013

  • CIM
    Little Long Lac Gold Mines

    By Alan A. Barton

    Introduction The Little Long Lac mine is situated in the Thunder Bay mining district, township of Errington, Ontario. The mine is located on the south side of the most westerly bay of Little Long Lac

    Jan 1, 1935

  • CIM
    Development of Permanent Stainless Steel Cathodes in China

    By Chi Zhang, Junyi Wu

    "The use of permanent stainless steel cathodes for electrorefining and electrowinning of cathode copper had been introduced to the market long time ago and now is a well-accepted technology worldwide.

    Jan 1, 2016

  • CIM
    The Impact of Process Water Quality on the Performance of Different Collectors in Flotation Process

    By J. Dong

    "A “green” collector project has been initiated at Vale Base Metals Technology Development to replace xanthate. Bench and miniplant testwork showed comparable metallurgical results between xanthate an

    Jan 1, 2012

  • CIM
    New Solutions in the Area of Belt Conveyor Elements Increasing Energy Efficiency of Mine Transportation Systems

    This paper presents the results of research aimed at proposing new solutions in the area of belt conveyor elements. Many factors, such as energy consumption costs, and operating costs of belt conveyor

    Aug 1, 2013

  • CIM
    BIM For Facility Management: Design for Maintainability with BIM Tools

    By R. Liu

    As Building Information Modeling (BIM) becomes widely adopted by the construction industry, it holds undeveloped possibilities for supporting Facility Management (FM). Some FM information systems on t

    Aug 1, 2013

  • CIM
    Marine Discharge of Mine Wastes: Ecosystem Effects and Monitoring Programs

    By Derek V. Ellis, Jack L. Littlepage

    "Marine ecosystem effects ar1smg from the discharge of man-generated wastes to the sea can be schematized as: acute poisoning, chronic poisoning, enrichment, suffocation, temperature effects, salinity

    Jan 1, 1972

  • CIM
    Mic Mac Mine

    By Joseph W. Mills

    "The Mic Mac property comprises 994 acres held under mining concession and approximately 2,000 acres held under development licenses in Bousquet township, Abitibi county, western Quebec.Gold was first

    Jan 1, 1954

  • CIM
    Two Dimensional Numerical Simulation of Fault Reactivation and Induced Seismicity

    By R. R. Song, Q. Li, H. Xing, X. C. Wei

    Geomechanical modelling of fault stability is an important part of CO2 capture and storage (CCS) research program to ensure its viability and long-term safety. Storage of CO2 in deep subsurface reserv

    Jan 1, 2015

  • CIM
    Transporteur Multi-Fonctionnel Pour Forage

    By Marcel Labbé

    La largeur de l?armature peut être modifiée selon les besoins du client entre 48 " et 64" de largeur totale, donc 2 sections de 24" à 32". Ceci permet à l?opérateur d?effectuer le démantèlement de l?é

    May 1, 2001

  • CIM
    Deep hardrock mining — the future

    By D. M. Morrison

    "The most important factor in Canadian mining is not the operating cost of current projects but the availability of capital for future projects. The future of mining at depth will be producing ore fro

    Jan 1, 1996