Search Documents

  • DFI
    An Evaluation Of Augered Cast-In-Place Pile Design Methodolgies For Compression Loading In Sand

    By Giuliana A. Zelada

    This paper reports on a study of 43 compression load tests (five fully instrumented) and ten pullout tests of auger cast-in-place (ACIP) piles in sand. Eight design methods reported in the literature

    Jan 1, 2000

  • AUSIMM
    Improving Pentlandite Selectivity Over Pyrrhotite Using Reagents

    Improving Pentlandite Selectivity Over Pyrrhotite Using Reagents

    Sep 13, 2010

  • NIOSH
    RI 5359 Carbonizing Properties Of Raleigh County, W. Va., Coals ? Introduction

    By D. E. Wolfson

    As part of its overall program of coal carbonization, the Bureau of Mines is studying the coking properties of coals that may be used for metallurgical purposes. The objectives of this study were give

    Jan 1, 1957

  • SME-ICGCM
    Influence Of Discontinuity Orientations And Strength On Cavability In A Confined Environment

    By L. J. Lorig

    Much of the present knowledge about caving behavior of rock masses has been obtained from empirical observations. Additional notions about caving have been developed through inferences derived from tw

    Jan 1, 1989

  • DFI
    Soil Improvement Using Soil Mixing – An Alternative Way for the Indian Market

    By Franz-Werner Gerressen

    "The use of soil improvement to utilize areas, which are not suitable for foundation purpose, has a long tradition. Due to the increasing demand of foundation works in areas of unsuitable soils, the i

    Jan 1, 2017

  • SAIMM
    Establishing A New Metric For Mineral Resource Management

    By A. S. Macfarlane

    Mineral resource management (MRM) practice has developed in South Africa over the course of the last ten years, with the purpose of integrating previously isolated technical functions into a value cha

    Jan 1, 2006

  • AIME
  • SME
    Ventilation planning at the Minerales Monclova?s Mines

    By J. R. P. Aguirre

    Minerales Monclova, S.A. de C.V. (MIMOSA) is owned by Grupo Acerero Del Norte (GAN). This company has 4 underground coal mines and 1 open pit to feed it?s steelmaking facilities located in the city of

    Jan 1, 2009

  • CIM
    Improving mining and minerals plant performance: operations and maintenance working together using new information technology

    Operations and maintenance departments have had a long-standing adversarial relationship. The widespread evolution and adoption of modern management techniques, such as reliability centered maintenanc

    Jan 1, 2009

  • DFI
    Evaluating Axial Elastic Pile Response From Cone Penetration Tests (The 2009 Michael W. O?Neill Lecture)

    By Paul W. Mayne

    Axial pile performance can be rationally evaluated within an elastic continuum framework using field results from seismic piezocone tests (SCPTu). Adopting a versatile Randolph-type elastic pile model

    Jan 1, 2009

  • ABM
    Otimização Do Pátio Do Ltq – Realocação De Placas

    By Jovanir Francisqueto

    O objetivo deste projeto foi elevar a produtividade do pátio de placas do Laminador de Tiras a Quente da ArcelorMittal Tubarão através da alteração do processo de sequenciamento do Laminador de Tiras

    Aug 16, 2017

  • NIOSH
    RI 6594 The Hafnium-Vanadium System

    By D. K. Deardorff

    The hafnium-vanadium phase diagram was constructed within an estimated accuracy of ± 10° C and ± 2 wt pct composition. Alloys for investigation were melted under an atmosphere of purified helium by no

    Jan 1, 1965

  • DFI
    State Of The Art In Double Rotary Drilling - Experience Gained From Practice

    By Markus Schönit

    Double rotary drilling combines continuous flight auger drilling with a casing for producing a cast-in-place pile. When producing a pile an outer casing and an auger (hollow auger) rotating inside

    Jan 1, 2011

  • CIM
    Paste Backfill Bulkhead Monitoring ? A Case Study from Inmet?s Cayeli Mine, Turkey

    The stability of paste fill bulkheads forms an integral part of a successful paste fill system. Bulkheads are constructed at the draw points of open stopes to contain paste fill while the initial pour

    May 1, 2007

  • CIM
    Ore Microscopy Applied to the Beneficiation of Volcanogenic Massive Sulfides

    By Orlando C. Gaspar

    Abstract - The presence of fine-grained mineral intergrowths, the complex distribution of deleterious minor elements, and the variable base-metal contents in some assemblages commonly pose technical p

    Jan 1, 1997

  • CIM
    Ore Microscopy Applied to the Beneficiation of Volcanogenic Massive Sulfides (89e4320c-184a-4b9d-8a40-34c652dfef8c)

    By Orlando C. Gaspar

    The presence of ?ne-grained mineral intergrowths, the complex distribution of deleterious minor elements, and the variable base-metal contents in some assemblages commonly pose technical problems for

    Jan 1, 1997

  • IOM3
    Fused-salt electrorefining of bismuth-lead alloys in a recessed-channel cell

    By F. Tailoka

    Bi was electrorefined from alloys containing 10-90 wt% Pb, together with Cu and Ag as minor impurities, in a basic cell and in a recessed-channel cell with 27.5:72.5 NaCl-PbCl electrolyte at 450-470 d

    Aug 1, 1995

  • NIOSH
    RI 7036 Molten-Salt Electrorefining Vanadium Scrap

    By K. P. V. Lei

    The Bureau of Mines investigated molten-salt electrorefining as a practical method for reclaiming vanadium from vanadium scrap. An electrolytic process utilizing a KC1-LiC1-VC12 electrolyte at 615° C

    Jan 1, 1967

  • CIM
    The Premium Value Defined Growth Independent - Value Creation ? Return On Capital ? Low-Cost Producer ? Return On Assets

    By Phil Keele

    Canadian Natural ??Business Approach Efficiency and Execution ?Drive to be the low cost producer ?Focus on exploitation ?Augment exploitation with strategic acquisitions ?Maintain Discipline and

    May 1, 2010

  • ABM
    Redução Do Custo De Transformação Da Bqd Pela Alteração Dos Parâmetros De Solda A Topo Por Centelhamento

    By Douglas Luciano da Silva Oliveira

    Em uma linha de decapagem contínua, o tempo de parada da entrada para realização da solda é um dos fatores que mais afeta a produtividade. Estratificando-se o tempo total dessa parada, parte significa

    Aug 8, 2018