Search Documents

  • NIOSH
    RI 8083 Recovery of Mercury From Cinnabar Ores by Electrooxidation - Extraction Plant Amenability Tests

    By E. S. Shedd

    Amenability studies were conducted by the Federal Bureau of Mines on an electrooxidation technique for the extraction of mercury from cinnabar ores, particularly those that are too low in grade to be

    Jan 1, 1975

  • CIM
    The Sampling System of Courier 300 Analyzer

    By Tapio Leskinen

    "l. IntroductionA reliable sampling system is the basis for an on-stream analyzer. This was realized in Outokumpu company when the development work of the Courier 300 On-Stream X-ray analysis system w

    Jan 1, 1976

  • SME
    International Project Management: Challenges For a Junior Mining Company

    By Andrew Kaczmarek

    The mining industry is enjoying a much needed and long awaited increase in demand for natural resources. However, consolidations in the mining and mining service industries, along with a generational

    Jan 1, 2006

  • DFI
  • DFI
    Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - Introduction

    By P. A. Neill, O&apos

    The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee

    Jan 1, 1994

  • AUSIMM
    Technical note-acid removal of manganous ion adsorbed on ore surfaces during microbial manganese dioxide leaching

    By Poi G, Madgwick J. C, Davis P, Pannowitz D, Cho D, MacKay B, Chan S. M, Varga R. A, Chun U

    Periodic dilute sulphuric acid treatment ofstill, batch-fed, molassesenriched, microaerobic, manganese-dioxide-Ieaching microbial cultures led to marked improvements over untreated cultures. Percentag

    Jan 1, 1986

  • ISEE
    Percussive Drilling Theory and Practice

    By Pat McLaughlin

    Environmental constraints are pushing many operators to change from large rotary blastholes to the smaller diameter holes drilled with down-hole or top-hammer rigs. Productivity improvements over the

    Jan 1, 1995

  • DFI
    Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2013

  • SME
    Tough Times Not Enough To Deter More Than 2,200 From Northwest Mining Meeting

    Amid some of the worst economic conditions that the mining industry has been faced with in more than a decade, the mood among the large crowd at the 114th Annual Northwest Mining Association?s annual

    Jan 1, 2009

  • IMPC
    A Techno-Economic Comparison Of Pyrometallurgical And Hydrometallurgical Options For Treating High-Arsenic Copper Concentrates

    As the high-grade copper deposits in the world become depleted, there is an increasing focus on developing lower-grade ores which contain problematic impurities such as arsenic. Indeed, many high-arse

    Sep 1, 2012

  • SME
    Tunneling Data: Turning Information into Intelligence on the NEIS Project

    By John McDonald, Peter C. Raleigh, Christopher Dishlip

    This paper will discuss how the construction management team and the contractor working together on the City of Los Angeles, North East Interceptor Sewer project, managed information on a daily basis.

    Jan 1, 2005

  • CIM
    The Ausmelt Continuous Copper Converting (C3) Process

    By R. Matusewicz

    The key drivers for the copper smelting industry are a complex mix of economic and "human" factors which combine to drive technology in new directions and can provide a strong indication of future ind

    Jan 1, 2007

  • NIOSH
    Seventy-Two Fatalities Have Occurred at Coal and Metal/Nonmetal Mining Operations Since January 2001

    This article updates the status of fatalities occurring in both coal and metal/nonmetal mines from January through December of 2001. Based on preliminary accident reports, as of December 31, 2001, sev

    Jan 1, 2002

  • SME
    Correct Identification Of Chrysotile Asbestos In Ores

    By Allison

    During the 1980’s, laboratories opened throughout the United States to serve the analysis needs of a rapidly growing asbestos abatement industry. The samples analyzed were either collected during the

    Jan 1, 2005

  • SME-ICGCM
    Subsidence Prediction From The Beginning - Collie Coal Basin (Western Australia) (dce863fc-d411-440e-9991-cfa750adc084)

    By Ian Misich

    Surface subsidence resulting from "total extraction" of coal in the Collie Basin first occured in 1987 when Western Collieries Ltd trialed the Wongawilli mining method. Because very little quantitativ

    Jan 1, 1992

  • CIM
    Decision Support Programs

    By Hamid Butt

    Information Technology ??Advanced Information Technology is dramatically changing information flow within organizations. This enables employees to have information at their fingertips to make informe

    May 1, 2006

  • DFI
    The Seven Steps To Foundation Retrofit

    By Javier Rodriguez

    Adaptive re-use of existing structures in urban environments has become very common due to lack of available space in our cities and requirements for increased structural capacity. Often, it involves

    Jan 1, 2006

  • AUSIMM
    Late Metamorphic Structural Zones in the Otago Schist: Prospective Hosts for Gold Mineralisation

    By M Begbie, R J. Norris, D J. MacKenzie

    The Otago Schist is crossed by numerous deformation zones that formed in the latter stages of metamorphism and uplift of the metamorphic belt. These deformation zones are long (tens of km) linear feat

    Jan 1, 2005

  • NIOSH
    Applications Of The Point Estimation Method For Stochastic Rock Slope Engineering

    By Edward L. McHugh, Stanley M. Miller, Jeffrey K. Whyatt

    The point estimation method can be applied to the safety factor (SF) equation for any specified rock slope failure mode (such as plane shear, step path, or wedge) to obtain reliable estimates of the m

  • SME
    Design of the Akron Northside Interceptor CSO Tunnel - RETC2023

    By Dominick Mandalari, David Mast, Heather Ullinger, Juan Granja, Amanda Foote

    The City of Akron will construct the Northside Interceptor Tunnel project, a U.S. EPA/ DOJ CSO Long Term Control Plan Project. The system will provide at least 10.3 million gallons of storage in a 16.

    Jun 13, 2023