    Water Jets And Rock Hammers For Tunneling In The U. S. And U. S. S. R.

    By William C. Cooley

    SUMMARY A review is presented of the state of development of high pressure water jet equipment and of large impact hammers for rock tunneling. Information from the U.S.S.R. is based on published li

    Jan 1, 1997

  • SME
    Simulation of operating risk in mine feasibility studies - SME Transactions 2011

    By S. Kenzap, V. Kazakidis

    Risk assessment is an essential component of mine feasibility studies. However, it is often challenging to identify the appropriate analysis and derive the required input data. The uniqueness of a min

    Jan 1, 2011

  • SME
    Austrian Method Of Tunnel Building In Very Heavily Squeezing Ground In Mountainous Terrain Theory And Practice

    By Horst Pöchhacker

    The largest structure along the Tauern highway section between Salzburg and Villach is the 6.4-km-long Tauern Tunnel. The major geotechnical problems that came up surprisingly while driving the headin

    Jan 1, 1976

  • SME
    Bold and Visionary Planning of Tunnels and Underground Space ? Introduction

    By Harvey W. Parker

    Our industry has developed to the skilled, experienced and productive industry that we now enjoy as a result of the visions of great engineers throughout history, but, in particular for their visions

    Jan 1, 2008

  • SME
    Transporting A TBM Through A Large City On The East Side CSO Tunnel Project In Portland, OR

    By Niels Kofoed

    Upon completion of the 6,200 m (20,340 lineal ft; lft) North Tunnel drive for the Portland East Side Combined Sewer Overflow (CSO) Tunnel project in Portland, OR, the slurry tunnel boring machine (TBM

    Jan 1, 2011

  • SME
    The Upper Pennsylvanian Pittsburgh Coal Bed: Geology And Mine Models

    By L. F. Ruppert, W. D. Watson, S. J. Tewalt, L. J. Bragg

    The U.S. Geological Survey recently completed a digital coal resource assessment model of the Upper Pennsylvanian Pittsburgh coal bed which indicates that of the original 34 billion short tons [31 bil

    Jan 1, 2000

  • SME
    Quartz-Feldspar Separation For The Glass And Ceramics Industries

    By F. Burat

    Large reserves of feldspar ore exist in the Aegean region of Turkey. The main colored impurities in these ores are iron- and titanium-bearing minerals such as anatase, rutile, sphene and ilmenite. In

    Jan 1, 2007

  • SME
    Assessing Small Underground Coal Mines For High Safety-Related Risk

    By H. Kinilakodi

    In 2008, the authors developed a methodology for identifying underground coal mines at high risk for major-hazard events. It focused on major hazard-related violations of safety standards associated w

    Jan 1, 2011

  • SME
    World?s Largest TBM Keeps Niagara Project On Track

    By Doug Harding

    The Niagara Tunnel Project (NTP) is a 10.4-km- (6.5- mile-) long, 14.4-m (47.5-ft) bored tunnel that will run under the city of Niagara Falls from the Upper Niagara River to the Sir Adam Beck power st

    Jan 1, 2008

  • SME
    Preliminary Rib Support Requirements for Solid Coal Ribs Using A Coal Pillar Rib Rating

    Researchers from the National Institute for Occupational Safety and Health (NIOSH) are developing a coal pillar rib rating (CPRR) technique to measure the integrity of coal ribs. The CPRR characterize

    Jan 7, 2020

  • SME
    Evaluation of Whole Body Vibration (WBV) of Dumper Operators Based on Job Cycle Mining, Metallurgy and Exploration (4615660d-b95c-47f0-b07e-3e2b55f50187)

    By Sandeep Kumar Jeripotula, Govinda Raj Mandela, Aruna Manglapady

    Dumper operators are frequently exposed to whole body vibration (WBV) in surface mines. Surface mining activities involve the amalgamation of comparatively high intensity of vibration and extended exp

  • SME
    Implementation Of The HydroFloat Technology At The South Fort Meade Mine (b0ff9df4-18a3-4533-954f-95c4d4f285a2)

    Several industrial-scale HydroFloat separators have recently been installed at Mosaic?s South Fort Meade beneficiation plant for the purpose of improving phosphate recovery and throughput capacity. Th

    Jan 1, 2007

  • SME
    Investigating Different Methods Used for Approximating Pillar Loads in Longwall Coal Mines

    Accurately estimating load distributions and ground responses around underground openings play a significant role in the safety of the operations in underground mines. Adequately designing pillars and

    Jan 7, 2020

  • SME
    On The Lateral Stiffness Of Gearless Mill Bearings

    By R. L. Guerguerian

    Nowadays, most grinding mills driven by a wrap-around ring motor are operating successfully. Some of the earlier problems could be attributed to the lateral stiffness and stability of their bearings.

    Jan 1, 2000

  • SME
    Drainage Problems Of The Chicagoland Area

    By Ben Sosewitz

    The subject of rapid excavation tunneling is one that is extremely important to the people in the Metropolitan area of Chicago. My personal observation is that it is also extremely important to the ur

    Jan 1, 1997

  • SME
    Scheduling Fast-Track Tunnel Construction Projects - Introduction

    By Valerie (Wollet) Rebar

    Successful execution of fast-track projects is an arduous task at best. Effective and organized management, a comprehensive technical design with an independent check-and-balance system, and optimal s

    Jan 1, 2008

  • SME
    Performance And Experiential Development Of The Mobile Miner At Mount Isa

    By R. J. Boyd

    SUMMARY The productivity of drill and blast methods of mining in hard rock is limited by the cyclic nature of the operation, and a plateau of performance has been reached, even with the most advanc

    Jan 1, 1987

  • SME
    Designing Continuous Conveyor Systems in Urban Environments: The 63rd Street Access Tunnel in New York City

    By Dean Workman

    Located in downtown New York City, this project necessitated an innovative conveyor design for successful muck removal. This paper will discuss the technical challenges and engineering solutions of th

    Jan 1, 2008

  • SME
    Reduce Urban Tunnel Utility Relocation Risk through Early Relocation by Specialty Contractor

    By Justin Carl, Aliuddin Mohammad, Gordon Evans, Steven Bealby, Carlton Ray

    "The District of Columbia Water and Sewer Authority (DC Water) is implementing the $2.2-billion DC Clean Rivers Project (DCCR) to control combined sewer overflows (CSO) to the Anacostia and Potomac ri

    Jan 9, 2017

  • SME
    Roof Deformation Associated with Mining of Two Panels in Steeply Dipping Coal Seam Using Subsurface Subsidence Prediction Model Mining, Metallurgy and Exploration and Physical Simulation Experiment

    By Panshi Xie, Xicai Gao, Yi Luo, Youfu Zeng, Yongping Wu, Shenghu Luo

    This research investigates roof deformation and failure characteristics, as well as mechanical interaction between the panels of the roof strata above two adjacent working faces in a steeply inclined