Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Recent Advances in the Effect of Velocity of Detonation and Gas Pressurization on Fragmentation in Layered RockBy K Uenishi, H P. Rossmanith, N Kouzniak, A Daehnke
This contribution presents an introduction into that part of the field of elastic wave propagation which is relevant to blasting of boreholes and addresses briefly borehole breakdown and the formation
Jan 1, 1998
-
Improved Methods of Blasting Concrete for Welland Canal RehabilitationBy Ray Jambakhsh, Craig Copping
The St. Lawrence Seaway's Welland Canal has been undergoing a rehabilitation program that requires the removal of deteriorated concrete from the 25 meter high lock walls. Multi million dollar contract
Jan 1, 1994
-
Pneumatic Loading of ANFO UndergroundBy J J. F Smith
The application of pneumatically loaded ANFO for underground mining has continued to increase year by year since the technique was first developed and introduced underground during the early 1960's. I
Jan 1, 1982
-
Peabody Study: Optimizing Cast Blasting Efficiency Using ANFO With LinersBy Stafan Rose, Art Madsen
Four years ago, Peabody’s North Antelope Rochelle Mine (NARM) site started experimenting withANFO and Liners in its Cast Blasting operations. The motivation to use ANFO was based on the following:1. A
Jan 1, 2007
-
Digital Delay Blasting At United Taconite LLCBy William Everett, Jack Eloranta
United Taconite is an iron ore mine operated by Cleveland-Cliffs Inc (Cliffs) located near Eveleth, Minnesota. The mine, originally known as Eveleth Taconite Mines, was purchased in December 2003 by C
Jan 1, 2006
-
Specialized Blend and Delivery Equipment Optimize Emulsion/ANFO ApplicationsBy Thomas F. Mechtenberg, Michael S. Powell
In the past several years many coal operators and stone producers have reduced drilling and blasting cost by utilizing Bulk Emulsion/ANFO blends. For many operators the cost of equipment to handle ble
Jan 1, 1990
-
Modern Blast Vibration Monitoring, Modelling and Frequency Control at Tara Mines, IrelandBy Brendan O'Reilly, Outokumpu Zinc, Geoff J. Johnston, S Durucan
Historically vibration monitoring has dealt primarily with surface blasting or "near field" monitoring of underground blasts. The Situation at Tara Mines is different, blasting occurs up to 400m under
Jan 1, 1994
-
The Waiting Time Recovery TestBy John T. Aler
The U.S. Bureau of Mines has been studying the problem of why explosives detonate weakly or misfire during blasting in underground coal mines. Cross-borehole shock wave interaction has been identified
Jan 1, 1991
-
Size Matters on the Mesabi RangeBy Thomas Palangio, Lyall Workman, Jack Eloranta, Tom C. Palangio
The fragmentation distribution of the blasted ore is an important descriptor of blasting results. Traditionally it has been hard to measure quantitatively. Developments in image analysis over several
Jan 1, 2007
-
Quantification of Production Quarry Blasting - the Search for the Most Effective Blasting TechnologiesBy S C. Brashear, D A. Anderson, A P. Ritter, S R. Winzer, R Broughton
Results of quarry blasts can be quantified to show the effects of controlled variables. Two studies have been carried out: one to document the effect of delay on fragmentation and the other to show th
Jan 1, 1985
-
Everglades Nutrient Removal ProjectBy Philip M. E Thomas
For over sixty years man has struggled to defeat the natural swamp lands known as the Florida Everglades as demand for land to support the burgeoning population growth in the state continued almost un
Jan 1, 1994
-
An Improved Scaling Procedure for Close-in Blast MotionsBy Bruce B. Redpath, Thomas E. Ricketts
Scaling laws commonly used for describing or predicting blast motions generated by conventional arrays of blastholes are dimensionally incorrect. The scaling of distance by the cube root of charge wei
Jan 1, 1987
-
Effective Construction Blasting Damage ControlBy Earl C. Hutchison, Gene Smith
Extensive blasting was required to construct an underground tunnel for a 90 inch sewerage relief line. The tunnel and required excavation extended under an upper middle-class residential area in Atlan
Jan 1, 1981
-
Laboratory Study on Prevention Method of Detonation Failure Caused by Channel EffectBy Fumihiko Sumiya, Kunihisa Katsuyama, Yuji Ogata, Yukio Kato, Yuji Wada, Yoshikazu Hirosaki
Smooth blasting technique is widely applied for tunneling road or railway construction in Japan. However, smooth blasting technique often causes problem related to detonation failure in explosive colu
Jan 1, 2003
-
A Computer Program to Predict the Probability of Overlap or Crowding of Adjacent-Period Millisecond-Delayed InitiatorsBy Mark S. Stagg, Stephen A. Rholl
The firing times of millisecond-delayed initiators are random variables that exhibit varying degrees of scatter. This scatter can cause crowding and overlap of adjacent delay periods, which results in
Jan 1, 1988
-
Study of Blast Over-pressure from Intentional MEC Detonations Using Double Sandbag MitigationBy Daniel Haines, Benjamin Konshak, Michelle Crull
American Technologies Incorporated Group (ATI) is the prime contractor with U.S. Army Corps of Engineers, Huntsville Center (CEHNC) in the Honolulu District for the removal of munitions and explosives
Jan 1, 2008
-
Source Scaling Study of Single-Fired Mining ExplosionsBy Brian Stump, Rong-Mao Zhou
A series of single-fired (simultaneously detonated) explosions were conducted in an Arizona copper mine. The explosions spanned yields from 1700 to 13600 lbs (773 to 6169 kg) and were all detonated in
Jan 1, 2006
-
Non-Ideal Blasting for Ideal Grinding - Part TwoBy Jack Eloranta
Building on previous work, this paper expands the template for modeling the economic relationship between blasting and grinding. The actual efficacy of various blasting enhancements is not addressed,
Jan 1, 2014
-
Practical Application of Emperical Blast DesignBy Donald J. Moore
It has become more important today than ever before to reduce costs and improve equipment utilization. One area where such improvement can he achieved is in the use of explosives. Effective blast desi
Jan 1, 1975
-
Control Blasting at Sherman MineBy Peter N. Calder, John N. Tuomi
The development of a successful control blasting program for an open pit iron mine in hard jointed rock is described. The objectives and mechanics of control blasting are discussed. Design and impleme
Jan 1, 1980