Abstract

The St. Lawrence Seaway's Welland Canal has been undergoing a rehabilitation program that requires the removal of deteriorated concrete from the 25 meter high lock walls. Multi million dollar contracts must be completed during the three month winter freeze up. New blast designs have drastically cut the time required for concrete demolition. All blast results including vibration, noise, underbreak, overbreak, scaling and flyrock have been improved and at a lower cost.
Citation

APA: Craig Copping Ray Jambakhsh  (1994)  Improved Methods of Blasting Concrete for Welland Canal Rehabilitation

MLA: Craig Copping Ray Jambakhsh Improved Methods of Blasting Concrete for Welland Canal Rehabilitation. International Society of Explosives Engineers, 1994.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account