Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    VIS-NIR Spectroscopy Applied to Copper Flash Smelting Processes

    By W. Díaz, R. A. Parra, L. E. Arias, C. A. Toro, M. Marin, E. Balladares, V. Parra, G. Reyes, S. N. Torres, D. Sbarbaro

    This work presents visible-near infrared (VIS-NIR) spectroscopy measurements, and signal analytical techniques to characterize minerals and relevant pyrometallurgical process variables for the copper

    Jan 1, 2019

  • CIM
    Metal Removal Mechanisms During the Treatment of Highly Contaminated Acid Mine Drainage using Passive Bioreactors, Limestone Drains, and Multi-Step Systems: A Short Review

    By Carmen M. Neculita

    Optimizing the long-term efficiency of passive systems for the treatment of highly contaminated acid mine drainage (AMD) is still a challenging issue. The optimization lies, among others, on improving

    Aug 1, 2013

  • CIM
    Kinetics of Chalcopyrite Leaching in Novel and Exotic Lixiviants

    By Isabel F. Barton, J. Brent Hiskey

    Chalcopyrite (CuFeS2) is the earth’s most abundant copper ore mineral, but is refractory to leaching with sulfates, chlorides, and other common lixiviants and oxidants. This has led to increasing rese

    Jan 1, 2019

  • CIM
    Slag Reduction and Settling for Improved Metal Recovery

    By R. Dawes, B. R. Davis, T. LeBel, C. Pelow

    Settling of copper, lead, and other metals in slags is an important part of overall recovery of metals, both in primary and secondary operations. The impact of slag reduction on settling is not well k

    Jan 1, 2019

  • CIM
    Behaviour of Selenium Contained in Copper Anode Slimes by Oxidizing Alkaline Leaching

    By O. Benavente, M. C. Hernández

    Selenium is obtained mainly from copper anode slimes, which is a by-product of the copper electrorefining process. Selenium is present in copper anode slimes as silver and copper selenides. Tradition

    Jan 1, 2019

  • CIM
    The East Sullivan Stock and its Gold-Copper Potential, Val d’Or, Quebec, Canada

    By Mehmet F. Taner

    "Abstract - The East Sullivan Stock (ESS) is a small, composite felsic alkaline pluton of presumed late Archean age in the Val d’Or mining district. Three main facies have been distinguished: monzonit

    Jan 1, 1996

  • CIM
    Technological aspects of narrow vein mining: suggested modifications and new developments. Mining of shallow and intermediate dipping (<45°) ore zones

    By C. Bourgoin

    "The factors constraining productivity in the mining of narrow vein ore deposits are numerous and often interdependent. This paper concerns mining techniques capable of reducing some of these constrai

    Jan 1, 1994

  • CIM
    Large Diameter Raise Boring in Hard Rock: An overview, its application and considerations

    By Patrick S. Hudd

    Traditionally in hard rock mining, large diameter raise boring was thought of as 3.04 metre or 3.66 metre diameter holes 300 metres deep. Mine and ventilation engineers were challenged to design syste

    Oct 1, 2010

  • CIM
    A Distinct Element Modeling with Spring Parameters-Elastic Constants Relation and its Numerical Application

    By K. Fumimura, T. Nishimura, M. Kohno

    When applying numerical techniques to problems of deformation of rocks, the body to be analyzed is divided into small portions and is represented by a system of points linked together with the neighbo

    Jan 1, 2015

  • CIM
    Mining applications of seismic tomography

    By W. J. Mcgaughey, R. G. McCreary, S. C. Maxwell, R. P. Young

    "Seismic tomography is a process for obtaining images or maps of seismic velocity or other seismic properties of a rock mass. Seismic velocity images reveal variation in elastic moduli which, in tum,

    Jan 1, 1994

  • CIM
    A strategy for mine computerization

    By J. E. Tupper

    "This paper will discuss strategies for the introduction of computer technology in the mine environment. More specifically, it will focus on issues such as: (a) make or buy; (b) programmer less mines;

    Jan 1, 1982

  • CIM
    Field Instrumentation Studies in Cemented Paste Backfill

    By Murray W. Grabinsky

    The in situ performance of Cemented Paste Backfill (CPB) systems can be monitored to improve understanding of the paste?s behaviour and therefore optimize the geomechanical design of the cemented past

    May 1, 2008

  • CIM
    Research on the Separating Features of a Permanent Magnetic Drum Separator Designed with Strong Specific Magnetic Force and Open Magnetic System

    By Chuanhui Cao, Shimei Liu, Xiaojing Li, Yueyuan Zhou

    "Force analysis on weakly-magnetic particles and non-magnetic particles in magnetic field are presented, using a kind of permanent magnetic drum magnetic separator, which is designed with strong speci

    Jan 1, 2016

  • CIM
    Geology of the Asbestos Belt in Southeastern Quebec

    By P. H. Riordon

    ONE OF the major sources of the world's supply of asbestos lies in a belt of ultrabasic rocks stretching through the Eastern Townships of Quebec where chrysotile asbestos has been mined continuously s

    Jan 1, 1962

  • CIM
    Notes on the Cariboo District of British Columbia

    By J. D. Galloways

    The northern part of the P. G. E. railway traverses and opens up that part of the province known as the Cariboo district, comprising the Cariboo and Quesnel Mining Divisions, which are a part of the N

    Jan 1, 1925

  • CIM
    Evolution of Ground Support Practice at LaRonde Mine: Innovative Solutions to High-Stress Yielding Ground

    By Pascal Turcotte

    _ Introduction _ LaRonde _ Controlling Instability in Haulage Drifts _ Failure mechanism in drifts walls _ Failure mechanism in drifts back _ Field Behaviour of Support Elements _ The ?Hybrid B

    Feb 1, 2008

  • CIM
    Temperature Variation Rules During the Process of Gas Adsorption in Coal

    By Baisheng Nie, Longlong Yang, Tao Yang, Wenjie Jia

    "Gas adsorption in coal is an exothermic and physical process. Temperature might change during the dynamical process. In order to get the temperature variation of gas adsorption process, the experimen

    Jan 1, 2015

  • CIM
    Recycling of Nickel, Copper, Cobalt, and Vanadium

    By Clemens Kuhnert

    "Nickelhütte Aue GmbH is specialized in the recycling of waste materials containing non-ferrous metals. We treat nickel, copper, cobalt, vanadium, molybdenum and precious metal containing materials li

    Jan 1, 2017

  • CIM
    Operating experience and developments of G-REX and AuRIX®100 resin exchange technology

    By N. Katsikaros, A. Lewis-Gray, P. Richards

    "To optimize gold recovery in complex leach-to-electrowinning processes, Gekko Systems developed the Gekko resin exchange column (G-REX) as an intermediate step, using a highly gold-selective resin to

    Jan 1, 2017

  • CIM
    Electrolytic Ti Powder Production from Ore Sources

    By R. O. Loutfy, J. C. Withers

    "Titanium powder is produced from a small fraction of sieved sponge, HDH of sponge or gas blown from a melt produced billet. Ore from foreign sources is chlorinated in a very high temperature fluid be

    Jan 1, 2016