Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Coolgardie Gold NL - William Ford Decline: Narrow Vein Sub-Level Up-Hole Mechanised Stoping and Long Hole Rise Blasting Practices

    By Will D

    This presentation is to outline the current practice of mechanised stoping a one-metre wide, gold bearing ore body to optimise fragmentation, minimise dilution and reduce stoping costs.Coolgardie unde

    Jan 1, 1993

  • AUSIMM
    Gold, Calcite, and Other Materials on Activated Carbons from CIP Pplants

    By Woodcock J. T, Sparrow G. J

    Activated carbon particles obtained from a number of Australian CIP operations were examined with an optical and a scanning electron micro- scope and an electron microprobe. External surfaces, and po

    Jan 1, 1988

  • AUSIMM
    A Study of Seam Gas Drainage in Queensland

    The gas drainage characteristics of two seams, the Bowen at Bowen No. 2 Colliery, Collinsville, and the Gemini at Leichhardt Colliery, Blackwater, are assessed. Single borehole tests and drainage p

    Jan 1, 1982

  • AUSIMM
    Changes in Underground Coal Mining Technology - an Australian Outlook

    By Lama R. D

    The Australian underground coal mining industry is undergoing major changes. This paper analyses the technologies presently being researched in mines, and discusses their utilisation as major cont

    Jan 1, 1986

  • AUSIMM
    TEMCO û The Australian Ferro Alloy Producer

    By Berglin IK

    Since 1962, ferro alloy production in Australia has been concentrated at Bell Bay, Tasmania with a major expansion occurring in 1976. This concentration was based originally on the perceived requireme

    Jan 1, 1985

  • AUSIMM
    The Prevention and Control of Burning in Waste Coal Dumps (e814abc3-2b0b-49ff-8a5e-6cd3cf04acc7)

    Indiscriminate surface disposal of coal waste in New South Wales has created a serious fire hazard and increased air pollution.A survey of numerous dumps, as well as particular investigations of one b

    Jan 1, 1971

  • AUSIMM
    Recycling Galvanised Steel: Operating Experience and Benefits

    By Daniels E. J, Morgan W. A

    In response to the increase in consumption of galvanised steel for automobiles in the last decade and the problems associated with remelting larger quantities of galvanised steel scrap, a process is

    Jan 1, 1993

  • AUSIMM
    Wind Blasts in Underground Coal Mines: A Study of the Effect of the Rock Mass Properties of the Falling Roof Using a Physical Model

    By Torabi S. R, Daly C. R

    Wind blast is the sudden movement of air displaced by the massive collapse of roof rock in underground openings and is experienced as a high velocity flow of air through adjacent workings. The initi

    Jan 1, 1995

  • AUSIMM
    Current Developments in Charters Towers Geology and Gold Mineralisation

    By Peters S. G, Beams S. D

    CONCEPTS AND REGIONAL GEOLOGY The Charters Towers region holds many keys to the metallogeny associated with the complex geological development of eastern Australia during the Palaeozoic. Tectonic,

    Jan 1, 1989

  • AUSIMM
    The Setting and Characteristics of the Umuna Epithermal Gold-Silver Deposit, Misima Island, Papua New Guinea

    A combination of new radiometric age dates, local field relationships and the regional tectonic history indicate that the low sulphidation, fault breccia-hosted, epithermal gold-silver mineralisati

    Jan 1, 1997

  • AUSIMM
    Longwall Coal Cutting Machines the Future

    By Carthew J

    For more than 30 years shearer loaders have been the most important winning machines for,longwall mining. While the machines of the first generation had a driving power of only 100 or so kW, the p

    Jan 1, 1988

  • AUSIMM
    Waste Processing in the Zinc Industry Using Ausmelt Technology

    By Robbilliard K. R, Floyd J. M

    The problems facing the metallurgical industry from the viewpoint of the range of unacceptable residues, flue dusts and slags currently produced from the electrolytic zinc process, electric arc furn

    Jan 1, 1993

  • AUSIMM
    Sulfide Dust Explosions in Metalliferous Mines

    Changes in mining technology have led to an increase in the number of underground sulfide dust explosions reported in Australian and overseas mines. Samples collected at the Elura mine consisting prim

    Jan 1, 1984

  • AUSIMM
    An Exploratory Study Of Pre-Nucleated Pelletisation

    By Adamiak Z. P, Nicol S. K

    An exploratory study has been carried out on the applicability of pre-nucleated feed in pelletising operations. Measurements of the pellet quality parameters showed that iron ore pellets prepared

    Jan 1, 1974

  • AUSIMM
    Identifying Gold Losses Through the Application of SIMS Technology

    By P Hayward a, P Evans, K Prince, F Radke

    Operating efficiency is becoming paramount as the mining industry moves towards globalisation and conglomeration. Mining companies are continuously searching for new technologies that can improve plan

    Jan 1, 2004

  • AUSIMM
    Sampling of Copper Sulphide Concentrate

    Automatic sampling and weighing of copper sulphide concentrate produced on Bougainville Island (PNG) is described. Contained metal weights gave satisfactory agreement with buyer's results aft

    Jan 1, 1976

  • AUSIMM
    The Use of Isanol at Roseberry Mine

    The problems encountered with the introduction and use of Isanol underground are described. Significant direct as well as indirect savings have resulted from the use of Isanol. Field studies have s

    Jan 1, 1977

  • AUSIMM
    Metallurgical Operation at Gunpowder

    Gunpowder Copper Limited processes 1,000 tonne/day of Mammoth ore in a conventional flot- ation concentrator. Run of mine ore is prepared for flotation by three stages of crushing and two stages of

    Jan 1, 1974

  • AUSIMM
    The Evolution of Blasting Practice at the Kidston Gold Mine

    By Paine GG

    The Kidston Gold Mine commenced mining in 1984 and current annual production is 12 million tonnes, increasing in 1990 to 18 million tonnes. Mill throughout per year is 4 million tonnes with the bala

    Jan 1, 1988

  • AUSIMM
    Expert Control at Boddington Gold Mine

    By Green S, McKernan, Skrypniuk

    In November 1996, Boddington Gold Mine (BGM) began the implementation of an expert system. The objective of the expert system was to improve plant efficiency by developing an `operator best practice

    Jan 1, 1997