Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Distinct Element - Structural Element Analysis of Support Systems in Jointed Rock Masses

    The objective in design of an excavation in a jointed rock mass is to achieve a prescribed degree of control of rock mass displacement around the excavation. Any excavation in jointed rock usually

    Jan 1, 1987

  • AUSIMM
    Ore Reserve Estimation at Renison Tin Mine

    Computer-based block modelling of orebodies is now used at Renison Tin mine for the estimation of ore reserves. It is considered that this has resulted in improved reserve estimation for complex &apos

    Jan 1, 1990

  • AUSIMM
    A Second Derwent Crossing for Hobart

    Proposals for engineering works in the River Dement in recent years have been made in the context of very little geological informat- ion. Breakage of the Tasman Bridge, forced a complete re-apprai

    Jan 1, 1977

  • AUSIMM
    An Economically Viable Method of Dragline Mining in Weak Unstable Ground at German Creek Mine, Central Queensland

    By Xaykhamphoune, Ward B

    Draglines have been used exclusively for primary overburden stripping at the German Creek Mine complex in central Queensland, where coal has been extracted from a series of ten open cut pits working s

    Jan 1, 1992

  • AUSIMM
    Study of Surface Properties in Agglomeration Processes

    By Chaves AP

    This paper describes an investigation on the surface properties and mechanisms involved in the agglomeration of iron ore. For this purpose, an organic binder (carboxyl-methyl-cellulose (CMC)) was us

    Jan 1, 1993

  • AUSIMM
    Thermodynamics of Liquid Cobalt-Gold Alloys

    By Toguri JM

    A solid electrolyte technique has been used to measure the activity of cobalt in liquid cobalt-gold alloys containing between 0.085 and 0.50 mole fraction of cobalt, and for temperatures from just

    Jan 1, 1984

  • AUSIMM
    The Selectivity of Ion-Exchanges Resins for Au, Ag, Cu, Zn, and Fe in Highly Saline Ground Water

    By Kyle J. H, Browner R. E

    The selective adsorption of gold cyanide by the weak base ion exchange resins, PAZ-4* and Duolite A-7*, the neutral polymeric adsorbent, Amberlite XAD7*, and the strong base resins, PAZ-8 and IRA-40

    Jan 1, 1992

  • AUSIMM
    Support of Longwall Workings in Thick Seam Extraction

    By Smith PE

    The main components of face design are the power loader, face conveyor and powered support system and the interaction of these components determines the effectiveness of strata control. A major in

    Jan 1, 1986

  • AUSIMM
    Flotation in the Warrego Concentrator of Peko Mines Ltd.

    By Lynch AJ, Musgrove NH

    The behaviour of chalcopyrite and pyrite in the rougher-scavenger and regrind-retreatment circuits in the Warrego concentrator is discussed. The effects of change in xanthate addition on the separ

    Jan 1, 1975

  • AUSIMM
    The Economic Feasibility of Recirculation in Underground Mines

    By Gostylla W

    The economic feasibility of controlled district cross-cut recirculation is examined in this paper with particular reference to the most important mine ventilation network parameters. An algorithm i

    Jan 1, 1988

  • AUSIMM
    The Use of Equilibrium Diagrams to Better Understand the Influence of Lead Additions on Gold Leaching in Aqueous Cyanide

    By T Mahlangu

    The leaching of gold in alkaline aqueous cyanide solutions may be reduced significantly by the passivation of the gold by a surface layer of polymeric aurocyanide. This passivation of the gold is typi

    Jan 1, 2007

  • AUSIMM
    Modern Blasting Using Electronic Detonators and the Total Drill and Blast Concept in Quarries

    By A Jurg, F Leclercq

    The total drill and blast concept is widely known in the mining industry. On the contrary, the quarry industry rarely adopts such working methods. Based on the experience of the CBS quarry in the Nort

    Jan 1, 2007

  • AUSIMM
    Walhalla and the Long Tunnel Extended Gold Mine: An Historical Review

    By Roddick F

    From its mining lease at the northern end of Cohens Reef at Walhalla in the North Gipps- land mountains, the Long Tunnel Extended Gold Mining Company produced 13,695kg of gold, which at 1982 prices

    Jan 1, 1982

  • AUSIMM
    Continuous Pressure Filtration Aspects of Design and Development Trends from the Point of View of Mechanical Engineering

    The first continuous pressure disk filter took up industrial-scale operation in Germany in 1976. This paper comments on major components of pressure filter facilities from the point of view of indu

    Jan 1, 1989

  • AUSIMM
    Nabarlek Uranium Mine Design, Construction, Operation Monitoring and Decommissioning of the Water Management System

    By Weatherhead J, Grounds J

    The Nabarlek Uranium Project located in Arnhem Land in the Northern Territory of Australia was a small high-grade deposit which was the first uranium mine brought into operation following the extens

    Jan 1, 1988

  • AUSIMM
    Review of the Cut and Fill Method of Underground Mining

    By Thompson IR, Solomons SS

    Underground mining with the cut and fill method has been declining during the past decade or so, being replaced mostly by sublevel open stoping methods. During 1983 the Australian Mineral Industries R

    Jan 1, 1985

  • AUSIMM
    Design Investigations for a Steel Lined Pressure Tunnel in the King River Power Development, Tasmania

    The King River Power Development on the West Coast of Tasmania has involved the storage of the waters of the King River in the new Lake Burbury and their diversion through a 7 km tunnel to a 144 MW po

    Jan 1, 1993

  • AUSIMM
    Good Data-A Requirement For A Good Reserve

    Quite often the reserve assessor becomes enamored with the numbers gen- erated and forgets the basis for his assessment. The quality of the assess- ment can only be as good as the quality of the in

    Jan 1, 1979

  • AUSIMM
    Bankshooting Techniques at Moura Open Cut Coal Mine, Queensland

    By Hoppe AJ

    Drilling and shooting techniques at Moura open-cut have evolved over a period of 16 years and are the result of hard earned experience combined with established practices and consul- tation with pro

    Jan 1, 1978

  • AUSIMM
    An Investigation into Spoil Stability at Moura

    By Dunbavan M, Mallett C. W

    The sequence of development and back analysis of the failure of a spoil pile in the 1B pit of the Moura Mine are given. The mode of failure was a two-wedge mechanism with a basal slip plane passin

    Jan 1, 1981