Search Documents

  • SME
    8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months

    By Antonio Raschillà

    On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p

  • AUSIMM
    Maximising the Operational Benefit of Capital Investment Via Computer Simulation

    In the minerals industry allocating capital for setting up a new project or for upgrading an existing facility usually requires that a compromise be found between the initial cost of equipment, its

    Jan 1, 1990

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996

  • NIOSH
    RI 4518 Examination, Mapping, And Sampling Of Mine Shafts And Underground Workings Leadville, Lake County, Colo.

    By Jr .. Ebbley

    The investigation of mine shafts and underground workings at Leadville, Colo., was started in May 1946 and recessed in November 3, 1946. Thirty-eight shafts and connecting accessible underground worki

    Jan 1, 1949

  • IMPC
    New Approach to Reagent Development and Applications in the Processing of Base and Precious Metals Ores

    By D. R. Nagaraj

    The traditional (popular) approach to reagent development and optimization, which has become entrenched in both research and practice for many decades, is highly reductionistic, incremental and costly

    Jan 1, 2014

  • SME
    Fitness-For-Purpose: Should You Buy One Grinding Mill For The Price Of Two?

    By P. Ulrich, V. Svalbonas

    The early to mid 1980s was a period of mining consolidation, and many senior design engineers retired from the mill industry. Similar conditions have existed in the last few years. This creates a lo

    Jan 1, 2001

  • ISEE
    Precision Presplitting Optimization

    By Anthony J. Konya, Calvin J. Konya

    Mine sites and construction projects have faced problems with blasting a smooth back wall. This lead to safety concerns with slope stability and rock falls from the walls. Decades ago Dr. Calvin Konya

    Jan 1, 2016

  • ISEE
    Garbage Plug Demolition Using a Low Detonation Velocity Explosive in “Presa Mixcoac” Dam, in Mexico City

    By Enrique Albarrán, Julian Hernández

    "In 1942 The “Presa Mixcoac” dam was built, along with 15 other dams, to control the rain fall waterin the mountains west of Mexico City. Mexico City’s population at that time was around 1.5 millionpe

    Jan 1, 2016

  • AUSIMM
    The Petrography of Some Triassic Ipswich Coals

    By Taylor G. H

    The Triassic Ipswich (SE. Queensland) coals are of bituminous rank. The more exact rank of individual samples was determined by measuring the reflectance of the vitrinite. While in general the rank of

    Jan 1, 1963

  • SME
    Mining to play a larger role at bauma 2010

    Once every three years the eyes of the construction and mining industry?s turn to Munich, Germany for the bauma trade fair and exhibition. From April 19-25, Messe München International (MMI) will host

    Jan 4, 2010

  • CIM
    The Social Acceptability Process of the Canadian Malartic Mine

    By Philippe Angers

    This article analyzes the social acceptability process of a mining project located in an existing city. It will explore how the principles of sustainable development have been integrated in the projec

    Aug 1, 2013

  • SME
    Model And Experimental Study Of The Effect Of Impeller Rotational Speed On The Flotation Rate From A Small-Scale Flotation Cell - Implications For The Effect Of Bubble Velocity

    A series of flotation experiments were carried out in a 2.25-dm3 laboratory-scale Rushton turbine cell using hydrophobic quartz particles. Flotation was performed at a constant mean bubble diameter ov

    Jan 1, 2007

  • CIM
    Discrete Event Control and Dynamic Scheduling for Tele-Robotic Mining

    By Jamie King

    This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. In the past decade there have been significant advances in

    May 1, 2001

  • SME
    THE EFFECTS OF DISCHARGE DESIGN ON WET BALL MILLING PERFORMANCE - SME Annual Conference 2023

    By S. Makni, R. E. McIvor

    Grate discharges historically outnumbered the overflow type of industrial wet ball mills. However, overflow discharge mills now strongly dominate. In order to understand their comparative advantages a

    Feb 1, 2023

  • NIOSH
    OFR-29(2)-83 High Angle Conveyor Study - Volume II

    By E. A. Mevissen

    With the ever increasing consumption of mineral commodities, the vital question is not whether sufficient mineral quantities will be available, but rather can the known existing low grade resources be

    Jan 1, 1981

  • SME
    Creep Along Weak Planes In Roof And How It Affects Stability

    By M. K. Larson, R. G. Wade

    Researchers at the National Institute for Occupational Safety and Health (NIOSH) are studying the time-dependent response of rock stressed along weakness planes. The objective is to improve mine safe

    Jan 1, 2000

  • AUSIMM
    Ore Minerals of the Rockvale Mine, N.S.W., with Special Reference to Unmixing Textures

    By Chand F

    The silver deposits of Rockvale near Armidale, N.S.W., occur in fissure veins in epi-Permian granite. The ore is fine grained, mineralogically complex, and contains twenty-seven different minerals inc

    Jan 1, 1962

  • CIM
    Michelin Uranium Project, Labrador, Canada: Metallurgical Test Work, Economic Studies, and Process Design

    By J. R. Goode

    ABSTRACT Aurora Energy Ltd. is considering a 10,000 t/d process plant to produce 97 million lb (43,998,460 kg) of U3O8 over a 17-year project from uranium deposits in coastal Labrador. This paper summ

    Jan 1, 2012

  • NIOSH
    RI 4246 Laboratory Study of the Hot-Water Process for Separating Hydrocarbons from Surface Deposits of Bituminous Sandstones near Edna, Calif.

    By R. V. Higgins, G. B. Shea

    "FOREWORDIn the second year of World War II, the petroleum industry in California was taxed to near capacity to satisfy the expanded war demand for petroleum products, particularly fuel oil. With disc

    Oct 1, 1948

  • NIOSH
    OFR-84(7)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume VII - Rail Haulage Subsystem

    By C. B. Manula

    This report is volume 7 of an eleven-volume final report for a Grant completed by The Pennsylvania State University for the Bureau of Mines to develop a dynamic general purpose computer simulation mod

    Jan 1, 1974