Search Documents

  • CIM
    A Precise, Reliable, and Fully Automatic Real Time Monitoring System for Steep Embankments

    By Rick Wilkins

    The stability of steep embankments is a major safety issue in open pit mining, highway passes, and earth filled dams. A failure in any one of these situations could mean a loss of very expensive equip

    May 1, 2002

  • CIM
    Lessons Learned from Measuring and Monitoring the Social License to Operate

    By Ian Thomson

    The Social License to Operate ? We are operating in an era where social license in the resource industry is as important ? if not more important ? than mineral potential ? Concept proposed by Plac

    Aug 1, 2013

  • ISEE
    Blast Vibration and Seismograph Section - Wintertime Seismograph Set-Up Blues

    By Bobby Dupree

    I remember a big problem with a seismograph in the winter two years ago. In response to a citizen’s complaint I placed a transducer near the corner of a two-story home. It was a pretty nice day for th

    Jan 1, 2004

  • DFI
    Underground Parking Facilities In Rotterdam

    By Henk E. Brassinga

    In Rotterdam a number of underground parking facilities have been built and are under development in the inner city, and in the suburbs. These parking facilities are located at already densely built a

    Jan 1, 2006

  • AUSIMM
    Stacking and Reclaiming Facilities at South Blackwater Coal Mine, Queensland

    By Hoskings R

    Conceptual studies of the run of mine stockpiling and reclaiming requirements at Thiess Bros Pty Ltd South Blackwater coal mine commenced in 1975.Final selection of equipment was made in 1978 and the

    Jan 1, 1981

  • AUSIMM
    Rio Tinto’s strategic assurance response to the Brumadinho tailings dam failure

    By J Lapwood, S Pal, M Pascoe

    The devastating failure of Dam I at the Corrego do Feijao iron ore mine near Brumadinho in Brazil on 25th January 2019 left at least 270 people dead or missing. In the immediate aftermath of this even

    Jul 1, 2021

  • CIM
    Electromagnetic Wire-Rope Testing --- Disparate LMA Results, an Ongoing Problem

    By Marcel M. Djivre

    Electromagnetic wire rope testing is the only practical non-destructive method to evaluate the current condition of wire ropes in general, and in the mining industry in particular. The method has been

    May 1, 2004

  • NIOSH
    IC 8266 Review And Evaluation Of Silver-Production Techniques

    By C. H. Schack

    Extractive metallurgy techniques currently employed to recover silver from primary ores and secondary scrap were reviewed and evaluated to identify and delineate metallurgical problems whose resolutio

    Jan 1, 1965

  • SME
    Cleaner Tail Recycling to Minimize Phosphate Loss

    By A. K. Fallaw, G. Wang, L. R. Moore, S. Dobson, Y. Xiong, J. Gu

    "As ores degrade, mining techniques and chemistries change to meet market demand and maintain product quality. The balance of recovery and grade is a significant challenge in the Crago Process where a

    Jan 1, 2016

  • AIME
    LHD Equipment Ups Production For Inco

    By T. D. Parris

    Within a 30-mile radius of Sudbury, Ontario, the Ontario division of the International Nickel Co. of Canada, Ltd., operates nine underground mines and two open pits. Prior to 1966, ore removal from

    Jan 6, 1969

  • CIM
    Water Management Design for Cigar Lake Uranium Mine

    By Ken Dyck Sr.

    "Construction of the Cigar Lake uranium mine in northern Saskatchewan is well under way. Production is anticipated to begin in the first half of 2007. When in full production, the mine is projected to

    Jan 1, 2006

  • AUSIMM
    Design of Reinforced Concrete Chimney at Yallourn Briquetting Works

    THE Yallourn chimney has aroused interest, as it is, for the time being, the tallest structural erection in Australia. Its height was not decided on, however, with the object of breaking records, but

    Jan 1, 1924

  • CIM
    Market Driven Performance Improvements at Brunswick

    By L. Flett, S. Woods, C. Deredin

    "Following a significant reduction in world Imperial Smelting Furnace (ISF) capacity from 2003 to 2008, a major optimization initiative was successfully carried out on the lead upgrading and bulk (zin

    Jan 1, 2013

  • CIM
    Galvanic Interaction and Particle Size Effects in Self-Heating of Sulphide Mixtures

    By Jan E. Nesset, James A. Finch, Frank Rosenblum, Rebecca Payant

    "Under certain conditions of moisture and oxygen, sulphides can spontaneously heat, a phenomenon known as self-heating. In this paper, we test a hypothesis that galvanic interaction between some sulph

    Jan 1, 2011

  • SME
    Technology Ensures Coal Will Be The Nation’s Fuel Choice

    By Steve Kral

    President Bush’s National Energy Program and his Clear Skies Initiative both emphasize the use of coal to help meet the nation’s growing energy needs. And why not? Coal is currently responsible for

    Jan 1, 2003

  • CIM
    Optimizing Plant 2 at Kinross Paracatu, the World’s Largest Tonnage, Lowest Grade Primary Gold Milling Operation

    By Kevan Ford, Getulio Junior, Rob Henderson, Wayne Philips, Chris Martin, Rob Thorpe

    "Plant 2 at the Kinross Paracatu gold operation in Minas Gerais State, Brazil, was commissioned in late 2008. Designed to be the largest tonnage, lowest grade gold milling operation in the world, Plan

    Jan 1, 2011

  • SME
    A Review Of The Analysis Of Amphibole Fibers

    By K. A. Allison, D. R. Van Orden, R. J. Lee

    Continuing analysis of environmental samples for asbestos content has resulted in the misidentification of non-asbestos amphibole particles as asbestos fibers. These errors have received wide publici

    Jan 1, 2005

  • NIOSH
    IC 7328 Hazards Of The Trolley-Locomotive Haulage System In Coal Mines ? Introduction

    By D. Harrington

    The greatly extended use of the underground trolley-locomotive system for hauling coal without doubt was one of the most important factors in the rapid progress of coal mining and the increased produc

    Jan 1, 1945

  • SME
    A Case Study: Determination of the Optimal Tailings Beach Distance as a Guideline for Safe Water Management in an Upstream TSF Mining, Metallurgy and Exploration

    By Yongsik Jeong, Kwangmin Kim

    Most tailings storage facility (TSF) failures occur in active, upstream-type TSFs, often due to extreme and unexpected weather conditions—specifically, heavy rainfall and strong winds. This case study

  • AUSIMM
    Kalgoorlie Tailings Retreatment Project- A Case Study

    The Kalgoorlie Tailings Retreatment Project (or "Kaltails") involves the reclamation and retreatment of approximately 50 million tonnes of gold tailing situated on the Golden Mile at Kalgoorlie, Wes

    Jan 1, 1990