Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Yield Index: A New Method For The Analysis Of Flotation ResultsBy M. T. Ityokumbul
The use of yield index, the product of the yield and gangue rejection, for the optimization of separation processes is presented. The characteristics of the yield index are contrasted with separation
Jan 1, 1997
-
GIBE II Tunnel Project?Ethiopia: 40 Bars Of Mud Acting On The TBM ?Special Designs And Measures Implemented To Face One Of The Most Difficult Events In The History Of Tunneling?By Antonio De Biase
In October 2006, a 7m Double Shield TBM, boring through very poor volcanic formations, was pushed back by fluid mud, which presence had not been detected during previous field investigations, due to t
-
A database of ventilation friction factors for Quebec underground minesOne of the most important parameters in mine ventilation planning is the friction factor (K). Accurate values of friction factors are critical especially when carrying out mine ventilation simulations
Jan 1, 2009
-
The QIT Madagascar minerals deposits - geology, mining & mineral processingBy M. Mead, J. Dumouchel, W. Yule, J. Giroux
The QMM mineral sands of South East Madagascar contain approximately 1,900 million tonnes of mineable sand with a total heavy mineral (THM) content of roughly 4.5wt%. The QMM deposits are the world’s
Jan 1, 2005
-
A Novel Probe For Investigation Of Slurry FiltrationBy D. W. Wu, M. T. Haque
A novel impedance probe has been commissioned specifically for capturing fast dynamic information about filtration processes. It provides an attractive alternative to more complex measurement techniq
Jan 1, 2000
-
The application of nitrogen to control a spontaneous combustion event during a longwall face salvageBy Leeming. J. R.
In the UK, powered supports are normally salvaged from longwall faces on completion of production, for reuse on the next unit. Where a spare set of supports are held, the salvaged supports are often s
Jan 1, 2009
-
NIOSH Extramural Research Funding: Fulfilling the Mandate of the Miner Act (e1d7e0c3-f95b-4806-af8c-89ff1f6d2251)By J. F. Burr, D. P. Snyder, G. W. Luxbacher
"The Mine Improvement and New Emergency Response Act (MINER Act) of 2006 established the Office of Mine Safety and Health (OMSH) within NIOSH and provided authority for awarding contracts related to t
Jan 1, 2018
-
Bay Tunnel-Design ChallengesBy R. John Caulfield
The primary water supply system for the City of San Francisco and adjacent peninsula areas consists of aging and deteriorated pipelines crossing under the San Francisco Bay (the Bay). This system is h
-
Technical And Commercial Benefits Of Gearless Mill Drives For Grinding ApplicationsBy M. Ahrens, J. Gonser
Gearless mill drives are a well established solution for grinding applications in the minerals and mining industries. The paper describes the functionality and technical features of such drive systems
Jan 1, 2007
-
Design of the Akron Northside Interceptor CSO Tunnel - RETC2023By Dominick Mandalari, David Mast, Heather Ullinger, Juan Granja, Amanda Foote
The City of Akron will construct the Northside Interceptor Tunnel project, a U.S. EPA/ DOJ CSO Long Term Control Plan Project. The system will provide at least 10.3 million gallons of storage in a 16.
Jun 13, 2023
-
APM Tunnels at Phoenix Sky Harbor International AirportBy David M. Jurich, Randy J. Essex, Alex de Aboitiz
An Automated People Mover (APM) transit system is planned for the growing Phoenix Sky Harbor International Airport. The APM will improve passenger movements between the terminals, and provide a link t
Jan 1, 2005
-
Estimating Strain and Stress in Oriented Rock Cores Using a Diametral Deviation MethodA practical core-based method for estimating in situ stress was tested using 360° measurements of rock core diameter in a laboratory setting. In several mining districts across West Virginia, rock cor
Jan 7, 2020
-
Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, CaliforniaBy Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow
The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo
Jan 1, 2007
-
Mine Closure At San Martin Mine In Honduras, Central America - Preprint 09-111By R. E. Chaves
San Martin Mine is an open pit, gold heap leach operation located approximately 70 kilometers from the Honduran capital of Tegucigalpa. Mining operations commenced in 2000 and were completed late in
Jan 1, 2009
-
Exploration Of Limestone Pillar Stability In Multiple-level Mining Conditions Using Numerical ModelsBy Michael Murphy, Gamal Rashed, Brent Slaker
Many underground stone mines in the United States operate on multiple mining levels. The effects of interburden thickness, pillar offset between mining levels at various depths of cover, and in situ s
Jan 1, 2023
-
Selective Copper Recovery with HCl Leaching from Copper Oxalate Material Mining, Metallurgy and Exploration (d35b21fb-0dcb-4cd4-94b9-4575e3b19bb0)By Hasan Nizamoğlu, Z. Abidin Sarı, Aslıhan Demiraslan, M. Deniz Turan, Tolga Depci
In this study, recovery of copper from solid material (obtained by leaching of chalcopyrite with oxalic acid in the presence of hydrogen peroxide) with a copper oxalate structure was carried out selec
-
The Technological Evolution Of Longwall Mining – Preprint 97-116By M. Karmis, C. Haycocks
The evolution of longwall mining is briefly traced from its inception in England in the 1620's. In the beginning this method recovered 90% of coal with roof closure controlled by packs and walls.
Feb 24, 1997
-
Defining the Niche of Ground FreezingBy Paul C. Schmall, Arthur B. Corwin, Derek Maishman
Ground freezing occupies a unique and important niche in underground construction, fulfilling a geotechnical need that is difficult, or sometimes impossible, to fulfill through other groundwater contr
Jan 1, 2005
-
Sao Paulo Metro Project?Control Of Settlements In Variable Soil Conditions Through EPB Pressure And Bicomponent Backfill GroutBy Lorenzo Pellegrini
The respect of EPB reference pressure during TBM advance and hyperbaric activities, the complete and effective filling of the annular gap between tunnel lining extrados and the excavation section and
-
Environmental Impact Of Digging And Loading Equipment In Surface Coal MiningBy A. Lashagri
This paper presents research results on assessment of environmental impact of digging and loading equipment in surface coal mining. Environmental impact is accessed through the equipment exhaust and d
Feb 27, 2013