    Blast Damage Claims Evaluation and The Small Engineering Firm

    By Mark A. Rugen

    It may be difficult to imagine but small engineering companies do exist, even in relatively large cities like San Antonio. Due to the limited capital available for the purchase or use of equipment suc

    Jan 1, 1983

  • ISEE
    New Model for Realistic 3D Blast Simulation

    By BernardThierry

    To be able to precisely predict the result of a mine blast before pressing the button is a goal for many blasters due to the environmental and economic constraints of our century. Based on the fundame

  • ISEE
    The Effect of Shock and Gas Energies on Rock Fracturing Process

    "In order to increase control over blasting, it is important to identify the imperative mechanismsand to quantify their participation during the rock fracturing process. The useful energyreleased by t

    Jan 1, 1999

  • ISEE
    Journal: Safety Talk / Blast Area Security

    By W. Reisz

    Blast area security is the responsibility of everyone involved in the blasting operation and goes well beyond simply controlling access by unauthorized personnel.

    Jan 1, 2009

  • ISEE
    Evaluation of Propagation Sensitivity of Commercial Explosives in Large Diameter Holes

    By RR Vandebeek, A W. Bauer

    The Canadian Explosives Research Laboratory regularly evaluates the properties of commercial explosives for authorization under the Canada Explosives Act. Propagation sensitivity is normally measured

    Jan 1, 1987

  • ISEE
    Strategy, Innovation and Change - Challenging the Future at the Gregg River Mine

    By Rick W. Bellenie, Ronald L. Woolf

    The Gregg River mine is located 40 kilometres (25 miles) south of Hinton, Alberta, approximately 330 kilometres (205 miles) west of Edmonton and lies against the Front Range of the Rocky Mountains.

    Jan 1, 1994

  • ISEE
    Underwater Plug Blast at Manic-C Hydro-Electric Project

    By P Albert

    A wedge-shaped underwater rock plug has to be blasted in order to tap the reservoir and furnish water to a new underground powerhouse at Manicouagan-5. The paper deals with the design and engineering

    Jan 1, 1984

  • ISEE
    Peabody Study: Optimizing Cast Blasting Efficiency Using ANFO With Liners

    By Stafan Rose, Art Madsen

    Four years ago, Peabody’s North Antelope Rochelle Mine (NARM) site started experimenting withANFO and Liners in its Cast Blasting operations. The motivation to use ANFO was based on the following:1. A

    Jan 1, 2007

  • ISEE
    Status of Testing Program to Benefit Explosives Safety Standards Development in The United States Department of Defense

    By Michael Swisdak, John Tatom, James Tancreto

    In 2002, testing was proposed to generate needed data to assist in developing improved explosives safety standards within the US Department of Defense. This testing emphasizes two major areas: (1) ful

    Jan 1, 2006

  • ISEE
    Working With Explosives Suppliers to Optimize Pit Productivity and Costs

    By Thomas J. Snyder

    Modern quarry management should be alert to every opportunity to improve productivity and reduce operating costs. In this paper, the author outlines areas in which explosives suppliers should be encou

    Jan 1, 1988

  • ISEE
    Investigating Colliding Shock

    By Joshua Hoffman, Catherine Johnson, Braden Lusk

    The practice of dual initiation using precise timing from electronic detonators in boreholes is thought to be beneficial for increasing fragmentation at a desired location in the rock strata. This inc

    Jan 1, 2014

  • ISEE
    Rock Removal Utilizing Ice Bridges in the Mackenzie River Northwest Territories, for Pipeline Trenches to Man-Made Islands a Deepening Shipping Channels

    By William A. Travnik

    For more than 60 years, ESSO RESOURCES CANADA LIMITED has been producing and refining oil at a small refinery in Norman Wells, Northwest Territories, and supplying diesel fuel and other oil products

    Jan 1, 1986

  • ISEE
    Blasting and Excavating on Precarious Rock Slopes

    There is an intuitive tendency to equate rock strength with rock stability, yet the two must be evaluated separately. A slope in strong hard rock is not necessarily stable, nor is a slope in weathered

    Jan 1, 1996

  • ISEE
    Evaluation of Soil Cratering and Ground Vibration through Small-Scale Airblast Experiments

    By Courtney Vallejo, Rafiqul Tarefder

    This study examines the effects of small scale airblast experiments on cohesive soils and the resulting ground vibrations and crater geometries. Relationships for ground vibration attenuation with soi

    Jan 1, 2013

  • ISEE
    New Firing Method for Underwater Blasting (Remote-Controlled Blasting System by Electromagnetic Firing Method)

    By Takeo Ueda, Masashi Nakano

    We have developed a new blasting system remotely controlled by an electromagnetic firing method, which has proved advantageously applicable to sites where rapid tidal current or deep water may cause s

    Jan 1, 1983

  • ISEE
    Shockwave-Critical Charge Distance to Objects in Water

    By Bob de Raadt

    For a long time industrial underwater blasting has stood in need of a calculation method, for the determination of shockwave-proof as well as shockwave-effective charge distances to objects in water.

    Jan 1, 1980

  • ISEE
    Relating Horsepower to Drilling Productivity

    By Brian Wingfield, Rick Givens, Greg Williams

    Many technological advancements have been made in explosive products and applications over the last 15 years resulting in productivity and cost gains. However, the application of total energy (engine

    Jan 1, 1996

  • ISEE
    Evaluation of Environmental Effects Induced by Blasting Around a Waste Water Tunnel Project in High-Urbanized Area in Turkey

    By Ali Kahriman

    This paper presents the results of ground vibration and air blast measurements from tunnel blasting activities during the construction of the Beylerbeyi-Kucuksu waste water tunnel under a residential

    Jan 1, 2006

  • ISEE
    Techniques of Precision Blasting in the Excavation of Drilled Piers

    By George Young Mosteller

    This paper is summary of the practical solutions developed in the excavation of drilled piers (caissons) at GPCo's Plant Scherer, Juliette, GA. Plant Scherer is a 3,245 Megawatt Fossil Fuel Powerhouse

    Jan 1, 1980

  • ISEE
    Efficient use of energy to control bench damage

    By Elias Poulakidas, Marco Arellano

    The impact of a higher copper price on the open pit metal mining sector has derived in a faster and safer way in which the mining operation of broken and mineralised material is carried out. In this r

    Jan 1, 2008