Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-WallsBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city
Sep 8, 2021
-
Session 24 "Compaction Grouting and Consensus Guide"By Richard Berry
The spacing of grout injections is typically about 2 to 2 V½ meters if the purpose of the grouting is densification of the in-situ soils. Hole spacing will vary with the in-situ soil properties and th
Feb 10, 2003
-
Elliptical Jet Grouting for the Sela-22 Project in New Orleans, LA: An Innovative SolutionBy Filippo Maria Leoni, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, the SELA-22 project entailed the construction of a co
Jan 1, 2017
-
Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West AfricaBy Maurizio Siepi, Bruno Vingiani, Claudio Asioli
"The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill
Jan 1, 2016
-
Shoring of Long Beach Main Pump Station Utilizing Ground Improvement Methods, Long Beach, CABy Eric Lindquist, John Compagnone, Gabriel Carvajal
"Condon-Johnson & Associates, Inc. (CJA) with the assistance of design consultant, Brierley Associates, designed and installed a water tight shoring system utilizing several ground improvement techniq
Jan 1, 2017
-
Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)By I. D. Dayal, Anil Kumar Jain
"Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat
Jan 1, 2016
-
Washington Avenue Tunnel Project: Fortifying Aging Underground InfrastructureBy Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016
-
Estimation Of Maximum Unit Side Resistance In Drilled Shaft Foundations From Partially Mobilized Load-displacement DataBy Ramin Motamed, Anna Panorska``, Joseph A. W. Toth
In this study, a dataset of 145 bi-directional and static load tests was used to evaluate the load-displacement response with respect to unit side resistance for drilled shafts comprising fully and pa
-
Wet Soil Mixing For Foundation Support and Liquefaction Hazard Mitigation for the Ventura Cancer CenterBy Thang V. Nguyen, Lisheng Shao, Gary E. Taylor
"The Community Memorial Hospital of Ventura, California, proposed to build a new state-of-the-art Cancer Treatment Center with radiation shielding walls and roof. The loose silty soils at the site had
Jan 1, 2015
-
Tomographic Dst Algorithm For Stone Column Site Imaging And CharacterizationBy Gerald Verbeek, Erick Baziw
Stone columns are used in geotechnical site remediation to increase load-bearing capacity and reduce settlement of foundations. Stone columns also improve slope stability and increase the shear streng
-
A Tall Slender Tower Rises On Secant Piles and Drilled ShaftsBy Renzo D. Verastegui, T. C. Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala
"When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high rise towers in New York City. The 52-story condominium building is located on a 60 by 100 feet
Jan 1, 2016
-
A Case History – Termination of Pile in Rock Based on Penetration Resistance for a Bridge across River Mandovi in GoaBy Akshay Sakhuja, M. S. Karthika, R. Vignesh
"The bridge across River Mandovi in Goa is a cable stay bridge structure proposed parallel, along existing bridges for regulation and reduction of vehicular traffic; the entire bridge structure is sup
Jan 1, 2015
-
Eglinton Crosstown - Over and Under the Existing SubwayBy Shawna Munn, Sarah Speir
Cedarvale Station is one of 25 new Eglinton Crosstown light rail transit (ECLRT) stations along Eglinton Avenue in Toronto. It is an interchange station with the existing Toronto Transit Com- mission
Jan 1, 2023
-
Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)By Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2008
-
Static Behavior of Steel H-Piles under Axial Load using Scale Models in Very Soft ClaysBy Francisco A. Flores, Rigoberto Torres
The Complementary Technical Standards of Mexico’s City Building Code do not mention the criteria to compute the bearing capacity of Steel H-piles. It is necessary to increase knowledge in using steel
Sep 8, 2021
-
Collaborative Data Sharing During Seepage Barrier Wall Construction at Bolivar Dam – Perspectives from Owner, Contractor and Sub-ContractorBy Robert Bachus, Jamey Rosen, Fabio Santillan, Georgette Hlepas
"A seepage barrier of length 4,800 feet and maximum depth 144 feet is being installed at Bolivar Dam in Ohio. This project is owned by the United States Army Corps of Engineers and contracted to Trevi
Jan 1, 2017
-
Cannonsville Dam Emergency Borehole ResponseBy John Vickers, William H. Hover, Paul C. Schmall
"Any sudden subsurface issue that threatens the stability of existing buildings or infrastructure is cause for immediate investigation and prompt remedial action. Nowhere is this more true than the n
Jan 1, 2016
-
Approximate Assessment Of Basement Wall Effects On Foundation PerformanceBy Helen S. W. Chow, Harry G. Poulos
Most modern buildings involve the construction of a basement, often of several levels, to maximize the floor area ratio. The basement walls are generally designed for excavation retention purposes onl
Nov 1, 2022
-
Experimental Studies on Behaviour of Single Pile under Combined Uplift and Lateral Loads (5ae0a39a-734f-4c2b-bd6b-06fe19e6d6ea)By K. Madhusudan Reddy
"Pile response under combined uplift and lateral load is very important and it is imperative to evaluate the effect of combined loading and only few studies were reported on pile behavior under combin
Jan 1, 2017
-
TRD Soil Mixing at Herbert Hoover DikeBy George Burke
"Many soil mixing methods have evolved over the years, but the Trench Cutting Re-mixing Deep method (TRD) was developed in Japan, circa 1993, to construct continuous uniform cutoff walls, without the
Jan 1, 2009