Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Fill Back Stability in Open Stope Mining with Consolidated Backfill

    By Jerry Ran

    When multiple levels are mined in open stope mining with delayed backfill, mining underneath fill is inevitable to achieve higher rate of recovery if no sill pillars are left for the purpose of fill s

    May 1, 2003

  • CIM
    Cratering by a Row of Short Charges

    By Robert R. MacLachlan

    New underground mining technology is evolving through the use of large-diameter bore holes containing individually restricted charge weights. This article presents summary observations on cube-root s

    Jan 1, 1978

  • CIM
    FEM analysis of plastic deformation in Brinell hardness testing: correlation between strength and hardness in aluminum alloys

    By S. Maleksaeedi

    On-site evaluation of strength using hardness is common for different materials. The lack of such relation for aluminum alloys has always been felt. In this work, a finite element analysis of plastic

    Jan 1, 2004

  • CIM
    Kinetics of Copper Oxidation and Reduction in Packed Bed Reactors

    By A. Warczok

    The mechanisms and kinetics of copper oxidation and reduction have been investigated in small scale thermal gravimetric experiments as well as in laboratory pilot scale, packed bed reactors. With blis

    Jan 1, 2007

  • CIM
    Passive Magnetic Bearing Prototype Testing Results - Collaboration between Lawrence Livermore National Laboratory and Arnold Magnetic Technologies takes Passive Magnetic Bearings from Theory to Hardware

    By B. Yamamoto, D. Post, J. De Leon, A. Meike

    "This paper describes the theory, design, building, and testing of the passive magnetic bearing stabilizing system which is the core of the passive magnetic bearing system. The stabilizing system is m

    Jan 1, 2012

  • CIM
    SAG and Ball Mill Circuit Layout and Design

    By L. Dufourm

    This paper presents a review of plant layout considerations incorporated into recent designs of SAG/Ball mill circuits for two medium sized concentrators. The plant layouts presented and the design co

    Jan 1, 2012

  • CIM
    Gold in carbon-rich rocks: improbable protores

    By Janet S. Springer

    Anomalous gold concentrations in carbonaceous material have given rise to misconceptions about the role of carbon in gold depo its. Some hydrocarbon and carbon-rich black muds may how gold contents ra

    Jan 1, 1986

  • CIM
    NASA Lunar Mining and Construction Activities and Plans

    By Gerald Sanders

    Presentation Topics ? We?re Going to the Moon Again? ? What is Lunar Mining ? In-Situ Resource Utilization? ? What Are The Challenges to Lunar Mining? ? What is NASA Currently Doing?

    May 1, 2009

  • CIM
    Volatilization Behavior of Valuable Metals in Electronic Substrate Waste by Chlorination Volatilization

    By K. Sugawaral, W. Tongampl, K. Hiruta, Takasaki Y., A. Hosoi, T. Katol, A. Shibayamal

    Printed circuit boards of discarded personal computers, televisions, mobile phones and so on contain a significant amount of valuable metals. For the recycle of valuable metals contained in the printe

    Jan 1, 2011

  • CIM
    Automatic Generation of BIM Using Parametric Family

    By J. Lee

    A monolithic caisson is one of the major structural components commonly used in the construction of docks, breakwaters, and container terminal quay walls. Since the structure of monolithic caissons is

    Aug 1, 2013

  • CIM
    Full Face Blasting in a Frozen Shaft

    By Micheal Mayhew

    "This presentation will provide information and facts on the drilling and blasting within a frozen shaft using a full face methodology. The Author will briefly discuss the history of the sinking of a

    Jan 1, 2019

  • CIM
    Grinding Practices at the Frood-Stobie Mill

    By G. A. Frame, J. G. Patterson

    The 24,000-tpd Frood-Stobie mill grinding circuit operation and control are described. Changes implemented during the past three years to improve grinding efficiency and capacity are discussed.

    Jan 1, 1971

  • CIM
    Daily Production Planning Efforts at Phelps Dodge Miami Smelter

    By V. Ushakov, P. Bogdan

    Daily production scheduling in a highly dynamic smelter environment has always been a great challenge for the operation management due to a significant amount of uncertainties. Planned and unexpected

    Jan 1, 2007

  • CIM
    MINING EQUIPMENT CO2e EMISSION CALCULATION

    By SANDVIK WHITE

    The mining industry produces approximately 4-7% of global greenhouse gas (GHG) emissions. It is fundamental for mining operations to take immediate sustainable action to actively contribute to an emis

    Jan 1, 2023

  • CIM
    A Holistic Approach To Evaluating Battery Electric Vehicles For Underground Mines

    By Nicholas Bonderoff, Amily Xu

    The evaluation of battery electric vehicles (BEVs) in underground mines involves comprehensive business case analysis beyond just the capital and operating costs of the equipment itself. BEVs demonstr

    Jan 1, 2023

  • CIM
    Removal of Elemental Sulfur from Hydrometallurgical Waste Derived from Massive Sulfide Concentrates

    By K. Hawboldt, J. E. Halfyard, C. Bottaro

    The removal of sulfur from leach residues has been practised in the zinc industry using a combination of flotation and hot melt filtration. The process is highly dependent on the nature of the concent

    Jan 1, 2011

  • CIM
    Recent Developments in Iron Smelting and Steelmaking Processes

    By W. M. Armstrong

    THE GROWTH of the major iron and steel industries on this continent and in many European countries was based on the use of as-mined, high-grade, lump iron ores and on the availability of metallurgical

    Jan 1, 1958

  • CIM
    The Glacier Gulch (Hudson Bay Mountain or Yorke-Hardy) porphyry molybdenum-tungsten deposit, west-central British Columbia

    By D. Atkinson

    "Porphyry molybdenum-tungsten mineralization on the east flank of Hudson Bay Mountain crops out over 5 km2 and is intersected to depths of 2 km. Features such as a hornblende-biotite aureole, mineralo

    Jan 1, 1995

  • CIM
    Handling Timber at Normetal

    By L. S. Brooks

    TIMBER HANDLING presents a problem for any mine where appreciable amounts are used. This problem is accentuated where the shaft compartments are too small to allow a loaded timber truck to be lowered

    Jan 1, 1956

  • CIM
    Solidification Mechanisms of Melt Conditioned Direct-Chill (MC-DC) Casting

    By Jayesh B. Patel, Zhongyun Fan, Hu-Tian Li

    "Melt conditioned direct-chill (MC-DC) casting is a novel technology which combines vertical direct-chill (DC) casting with a high shear device directly immersed in the sump for in situ microstructura

    Jan 1, 2018