Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Open-Pit of Mining by the at Knob Iron Lake, Ore Company of Canada at Knob Lake, Quebec

    By V. Gregoire

    THE DEVELOPMENT by the Iron Ore Company of Canada of the Quebec-Labrador mining project, which eventually led to 'Iron Ore in 1954', involved, from the start, several distinct undertakings.

    Jan 1, 1958

  • CIM
    Vibration effects on mine workers

    By Stanley G. Hutton, Robert Brubaker

    "It has long been recognized that mining workers subjected to high levels of hand-transmitted vibration may suffer from vibration-related complaints. Prolonged exposure to whole-body vibration may als

    Jan 1, 1982

  • CIM
    Geology of the Sustut Copper Deposit in B.C. (2d42b1e7-1c94-47a9-b4c1-62e26e60d034)

    By G. Harper

    "AbstractThe Suetut. Copper deposit, 230 miles northwest of Prince George, B.C., was discovered in August of 1971. Subsequent exploration has included 56,417 feet of surface diamond drilling in 139 ho

    Jan 1, 1977

  • CIM
    Hard Automation Trends in Australian Underground Coal Mines

    By Stephen van Duin

    As productivity in coal extraction demands increase in underground coal mines, the industry is faced with finding new ways to support production without jeopardising safety. In modern mines the capaci

    Aug 1, 2013

  • CIM
    A Novel Method for Dewatering of Iron Ore Tailings Based on Separation of Fine and Coarse Fractions

    By M. Saghaeian, R. Hejazi, Fakoor Sanat Tehran Company, H. Abedini, M. Zare

    "Dewatering of final tailings is one the biggest issues in iron ore processing plants. Because of the fine and hydrophilic particles in the iron ore tailings, dewatering of such material is difficult

    Jan 1, 2016

  • CIM
    Relationship between mineral deposits and geologic domains of the Abitibi Volcano-Plutonic Belt of Northwestern Quebec (1bfb6279-27f7-4a75-8482-2fe66a75eac0)

    By Alain Simard, André Gobeil, Sylvain Lacroix, Maurice Rive, Denis Racicot, Pierre Verpaelst

    "The Abitibi volcano-plutonic belt forms the major portion of the Abitibi lithotectonic subprovince in the Superior Province. The Abitibi belt is composed essentially of"" (1) approximately 2.7 Ga old

    Jan 1, 1990

  • CIM
    Relationship between mineral deposits and geologic domains of the Abitibi Volcano-Plutonic Belt of Northwestern Quebec

    By Alain Simard, Andre Gobeil, Sylvain Lacroix, Maurice Rive, Denis Racicot, Pierre Verpaelst

    "The Abitibi volcano-plutonic belt forms the major portion of the Abitibi lithotectonic subprovince in the Superior Province. The Abitibi belt is composed essentially of"" (1) approximately 2.7 Ga old

    Jan 1, 1989

  • CIM
    Leveraging Bim for Automated Fault Detection in Operational Buildings

    By A. Golabchi

    Building Information Modeling (BIM) is an increasingly popular method for generating and managing facility information during the life cycle of a building, ranging from facility conceptualization, thr

    Aug 1, 2013

  • CIM
    Rock Mass Instability Associated with the Formation of Regional Geological Structures along the Bushveld Complex as Encountered during the Extraction of the UG2 Chromitite Layer at Lonmin PLC

    By M. du Plessis, G. More O’Ferrall, A. Hartzenberg

    "Lonmin Platinum has experienced several cases of large-scale hangingwall instabilities during the extraction of the Upper Group 2 Chromitite Layer (UG2) at a number of the Marikana operations along t

    Jan 1, 2015

  • CIM
    Massive Sulphide Deposits in Newfoundland

    By D. M. Baird

    "THE Island of Newfoundland lies on the extreme eastern edge of the continent of North America and at the extreme northeastern end of the Appalachian geological province. Its belonging to the Appalach

    Jan 1, 1960

  • CIM
    The Red Dog VIP mill optimization project. Part A: Rectifying the shortage of flotation capacity

    By George Hope, Brigitte Lacouture

    "The Red Dog mine has increased mill throughput most years since start-up. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restricted

    Jan 1, 2003

  • CIM
    Considerations regarding the definition of remotely located integrated cogeneration plants. Part 1

    By D. Berkley

    "The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining a

    Jan 1, 2003

  • CIM
    Autogenous milling — Effects on flotation of Mt. Lyell Copper ore Broyage autogène — Effets sur la flottation du minerai de cuivre de Mt. Lyell

    By N. C. Clarke, T. Wu, M. le Page, K. J. Henley

    In 1994, Gold Mines of Australia acquired the rights to the historic Mt. Lyell copper mine, and commenced a feasibility study into expanding production. The ore was shown in laboratory tests to be ame

    Jan 1, 2002

  • CIM
    Decommissioning For Sustainability with Ecological Engineering

    By Margarete Kalin

    "Difficulties arise in implementing environmental technologies in the mining sector because important fundamental processes, which lead to the environmental degradation, are ignored. Weathering rates,

    Jan 1, 2005

  • CIM
    Cyanide Elimination at Giant Yellowknife Mines

    By H. E. Pawson

    "COMMON METHODS OF ELIMINATION: The four methods most frequently used to dispose of cyanide wastes are:1. Oxidation2. Dilution with water or with cyanide free wastes3. Acidification and dilution of re

    Jan 1, 1973

  • CIM
    Response of Ore Masses to Stope Sequence Variations

    By N. Saeidi

    "For a mine section comprising 100 different stoping activities, there are ~10158 different possible stoping sequences to explore in the mine schedule optimization search and this figure is indicative

    Jan 1, 2015

  • CIM
    Drilling hard siliceous sandstone strata effectively

    By Joseph J. Larry

    In hard siliceous sandstone strata overlying coal seams, roof bolting is often the bottleneck in the coal production cycle. In the past, these strata have been drilled by pneumatically operated stoper

    Jan 1, 1979

  • CIM
    Development of Small Scale Flotation Cells and its Application in Milling Operations

    By R. Rosenblum, J. Y. Kim, D. Shink, K. G. Stowe

    "A small scale continuous flotation cell was designed and constructed at the Noranda Technology Centre to develop a mobile testing flotation circuit located next to the production circuit. This mobile

    Jan 1, 1992

  • CIM
    Rock Drilling with Tungsten Carbide Bits

    By J. H. Fulton

    Summary Considerable test work has been done with the detachable type of carbide bit. In general, these bits improved drilling operations, but at a bit cost .greater than was compensated for by the

    Jan 1, 1950

  • CIM
    1-Rock-Bursts at the Teck-Hughes Mine

    By J. D. Christian

    WHEN mining development began in the Kirkland Lake camp, twenty-five years ago, there was very little information obtainable from surface showings as to the nature of the ore deposits. A length of alm

    Jan 1, 1939