Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Pilot Plant Testing in Mineral Process Plant Design
By Dunlop GA
Pilot Plant confirmatory testing of the treatment route developed in the Metallurgical Laboratory is an essential factor in the development of complex ore bodies. Objectives should be well defined t
Jan 1, 1990
-
The Fall and Rise of the Feasibility Study
The theme of this paper is the development of-the project feasibility study which includes discussion of the work which is carried out in preparing the project feasibility study, the necessary eval
Jan 1, 1990
-
A Study of Results of the VLF-EM Method of Prospecting in Australia and Papua
By W. J. LANGRON
This paper describes the results of VLF-EM test surveys, using the Ronka EM-16 equipment, over a selection of environments in Australia and Papua.Using comparisons with known geology, drilling informa
Jan 1, 1972
-
Management of Technical Risk for the Ravensthorpe Nickel Project
By R Fury, I Skepper, D White, G Miller
Although the Pressure Acid Leaching (PAL) of nickel laterites has been conducted at Moa Bay, Cuba, since the early 1960s, the commissioning delays generally encountered by the æsecond generationÆ of P
Jan 1, 2004
-
Experiment of Improving the Quality and Decreasing the Impurity of Titanium Concentrate in Panzhihua Mine in China
Experiment of Improving the Quality and Decreasing the Impurity of Titanium Concentrate in Panzhihua Mine in China
Sep 13, 2010
-
Advances in Coarse Particle Recovery - Fluidised-Bed Flotation
Advances in Coarse Particle Recovery - Fluidised-Bed Flotation
Sep 13, 2010
-
A Semiquantitative Chromatographic Method for Estimating Gold
A field method combining solvent extraction and paper partition chromatography permits a simple and rapid semiquantitative estimation of gold in siliceous, argillaceous and sulphide ores. The method w
Jan 1, 1964
-
The Development of a Robust Sampling Strategy and Protocol in Underground Gold Mines
The development of a robust belt sampling strategy and protocol inunderground gold mines is a fundamental requirement for effective grade quality control, ore accounting and mine-mill reconciliations.
Jan 1, 1999
-
The Greymouth Coal Project
The Greymouth Coal Project is a proposal to mine by the application of proven hydraulic, and room and pillar underground mining methods; and to process the equivalent of an average of 1.7 million tonn
Jan 1, 1997
-
Presidential Address, 1977 Land Usage-Priorities
It is a great honour to address our Institute as President, but the choice of a suitable subject was not an easy one. In the past when the presidential address was given at an annual conference the su
Jan 1, 1977
-
The Recovery of Zinc from Lead Blast-Furnace Slags
As the question of zino recovery from lead blast furnace slags has lately become such an important subject with lead metallurgists, the following description of some of the work carried out in this oo
Jan 1, 1920
-
Rapid Colorimetric Procedures in Geochemical Prospecting for Molybdenum
Procedures employing thiocyanate and dithiol complexes of molybdenum have been developed for the determination of the metal in the presence of large quantities of ferric iron. The procedures are devel
Jan 1, 1965
-
Systematic Monitoring of Operation of Mining Companies and Branches
One of the important directions of further increase of quality and efficiency of control of mining companies and branches is the creation of the operation and development monitoring systems of such fa
Dec 6, 2010
-
The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR
By A Hoyle, P Walker, D Bennett
The Phu Kham copper-gold operation located in Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited, based in Brisbane Australia, holds a 90 per cent
Sep 7, 2015
-
Study of a Two-Stage Smelting Reduction Process for Ironmaking by a Thermochemical Model
A thermochemical model is developed to study the two-stage smelting reduction process for ironmaking without post-combustion. Steady-state multi-material and heat balance equations are solved simult
Jan 1, 1999
-
Paper No. 172. An Automatic Electrical System For Indicating The Position of ôChairsö in Shafts.
SEVERAL serious accidents, which had occurred owing to the platman leaving the plat without first withdrawing the "chairs" from the shaft, set the writer scheming to devise a mechanically op
Jan 1, 1909
-
Geology of the Area South of Mt. Isa and its Application to the Structural Control of the Mt. Isa Orebodies
By Wilson G. L, Lord J. H
A detailed analysis of faulting indicatcs that blocks of "greenstone" have been thrust beneath the southern end of the Mt. Isa orebodies.This "greenstone" basement is considered to
Jan 1, 1963
-
The Role of Metallurgical and Engineering Information Systems in the Optimisation of Iron Ore Beneficiation Processes
By T Nassis, H M. Nel, T du Toit
Assmang Khumani Iron Ore Mine is exploiting the iron ore deposits that can be found in the Bruce-King-Mokaning farm areas in the Northern Cape, South Africa. The Bruce, King and Mokaning (Khumani) dep
Aug 12, 2013
-
Grinding Mill Operation and Maintenance - Central to Asset Management
Grinding Mill Operation and Maintenance - Central to Asset Management Since 2005, RME has pursued a vision for a new grinding plant operational paradigm, made possible by RME's latest Mill Relin
Sep 13, 2010
-
The Metallurgy in Great Britain
By Elford H. S
Mr. H. W. GEPP said he desired to bring particular attention to this paper. The underlying intention of the Development and Migration Commission when the paper was prepared was to place at the disposa
Jan 1, 1930