Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Implicit Geological Modelling of Iron Ore DepositsBy A-A Latscha, C Boyle
Geological modelling has historically been done using sectional interpretation of paper sections or on a computer screen. Boundaries of geological units or grade shells are interpreted by a geologist
Aug 12, 2013
-
Engaging Generation Y with the Minerals IndustryFollowing a decline in direct and indirect employment in the minerals industry between 2000 and 2003, the situation reversed in 2004 and employment rose by 12 per cent. Furthermore, there are forecast
Jan 1, 2005
-
Application of Gold Fineness to the Search for OreIt has been fairly firmly established (Fisher, N. H., 1945) that the fineness of the gold in any ore deposit varies with the depth from the surface at which the deposit was formed, and, as a corollary
Jan 1, 1950
-
Palaeontology and The Mining GeologistIn order to appreciate fully the place of palaeontology within the general framework of the geological sciences, consideration must be given to the time, about 150 years ago, just before the study of
Jan 1, 1950
-
Ground Stability Problems Associated with the Black Rock Open Cut at Mount IsaOpen cut mining of the Black Rock chalcocite ore started in 1963. A ground movement monitoring programme was commencing in the early stages of mining when signs of instabilityof the western wall becam
Jan 1, 1968
-
The Effect of Oxygen in the Cyanide Process for Gold RecoveryThe dissolution of gold in cyanide has been studied, using both chemical and electrochemical techniques. The electro-chemical studies have confirmed that gold may become passive in cyanide solution if
Jan 1, 1963
-
The Mineral Composition of Ore from the Hill 50 Gold Mine, Western AustraliaOre from the Hill 50 Gold Mine, consists essentially of pyrrhotite, with minor amounts of pyrite, chalcopyrite, galena and gold, replacing "jaspilite." The gold is associated with the sulphi
Jan 1, 1955
-
Path Planning and Position Control for Autonomous Loading Operation by Wheel LoaderAuthors have been conducting research on autonomous loading operation by wheel loader. Autonomous loading cycles has been demonstrated with real size experimental model. In V shape loading operation,
Dec 6, 2010
-
Mining at Golden CrossThe Golden Cross mine commenced production in December 1991. Both open pit and underground mines produce 1000 tonnes of ore per day. Mining techniques are discussed along with results and variations t
Jan 1, 1992
-
Re-Forging and Heat Treatment of JackbitsBy Larkin F, Farrer E, McGhie R. R
The Electrolytic Zinc Company of Australasia Limited commenced productive operations during February, 1936, at the- Rosebery and Hercules mines, which are situated near Rosebery, Tasmania. At this tim
Jan 1, 1939
-
The North Lyell Tunnel, TasmaniaTHIS tunnel, which is an adit 7000 ft. long, was undertaken by the Mount Lyell Mining and Railway Company Limited to connect its treatment works with the North Lyell mine at depth, with a view to effe
Jan 1, 1929
-
Technical Note on an Automatic Coarse Batch Particle SizerA description is given of the construction and operation of an automatic version of the coarse batch particle sizer which requires a minimum of operator supervision and which is capable of processing
Jan 1, 1968
-
Boddington Gold Mine - An Example of Sustaining Gold Production for 30 YearsBy G Veillette, B Parker, S Hart
This paper provides a history of the challenges that were experienced while treating both the clayey oxide gold ores and the supergene copper-gold ores at the Boddington Gold Mine during the period 19
Jan 1, 2007
-
Removal of Arsenic in Enargite from Copper Ores by Flotation and Leaching in NaHS MediaRemoval of Arsenic in Enargite from Copper Ores by Flotation and Leaching in NaHS Media
Sep 13, 2010
-
The Kulumadau Epithermal Breccia-hosted Gold Deposit, Woodlark Island, Papua New GuineaBy L Spencer, H Zwingmann, I Graham, D Cendon, B Kelly, D Burkett, F Lau, P Lennox
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Kulumadau deposit represents an intermediate-sulfidation epithermal gold deposit (3.8 M
Mar 18, 2015
-
A Detailed Assessment of Concentrator Performance at Broken Hill South LimitedBy S B. Stewart, C J. Restarick
Over a four-hour period of steady plant operation samples were taken at regular intervals frum points within the grinding and flotation circuits. Size fractions of each composite sample were analysed
Jan 1, 1971
-
Effect of Hydrophobicity and Frother Concentration on Bubble-Particle Interactions in Turbulent FlowEffect of Hydrophobicity and Frother Concentration on Bubble-Particle Interactions in Turbulent Flow
Sep 13, 2010
-
Minimising Mineral Project Risk - New Zealand in a Global ContextMining ventures are essentially risky businesses. Explorers and project developers (plus their investors and financiers) attempt to minimise the risks involved or at least manage them. Core considerat
Jan 1, 2005
-
Sublevel caving a narrow vein mine – Pajingo’s case studyBy J F. Carswell, G Cheshire
The Pajingo gold operation in Queensland is approximately 55 km south of Charters Towers and 134 km south-west of Townsville. The gold deposit was discovered on the northern end of the Drummond Basin
Mar 15, 2021
-
Hierarchical Clustering Algorithm for Block Aggregation in Open Pit MinesOpen pit mine plans define the complex strategy of displacement of ore and waste over the mine life. Various mixed integer linear programming (MILP) formulations have been used for production scheduli
Dec 6, 2010