A Detailed Assessment of Concentrator Performance at Broken Hill South Limited

The Australasian Institute of Mining and Metallurgy
C J. Restarick S B. Stewart
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
27
File Size:
1380 KB
Publication Date:
Jan 1, 1971

Abstract

Over a four-hour period of steady plant operation samples were taken at regular intervals frum points within the grinding and flotation circuits. Size fractions of each composite sample were analysed for lead and zinc values and a comparison made of the behaviour of the lead, zinc and gangue minerals, size by size throughout the whole circuit. Analysis of the breakage behaviour using dynamic mathematical models gave the rates of breakage of each size fraction of each main component. Simulated grinding experiments shaved that the main grinding circuit had some reserve capacity. In the lead flotation circuit all lead values between 150 mesh (Tyler) and 5 ¦m had excellent flotation characteristics, and a major proportion had a high rate of flotation which was practically the same for all sizes. Increase in overall lead recovery would require improvement of the flotation behaviour of ultra-fine lead minerals. These were slav floating and were responsible for approximately half the lead losses in the final zinc concentrate and one thiro of the lead losses in the final tails. All sizes of zinc values between 150 mesh and 7 ¦m floated well and the performance of the zinc flotation circuit was mainly limited by the relatively poor flotation of the very fine zinc values. Approximately 60 per cent of the zinc lost to the final tails lay within the -7 ¦m fraction. The overall flotation conditions were conducive to very good selective flotation of the major proportion of the values and limitations in metallurgical performance were mainly due to the properties of the ultra-fines.
Citation

APA: C J. Restarick S B. Stewart  (1971)  A Detailed Assessment of Concentrator Performance at Broken Hill South Limited

MLA: C J. Restarick S B. Stewart A Detailed Assessment of Concentrator Performance at Broken Hill South Limited. The Australasian Institute of Mining and Metallurgy, 1971.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account