Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Performance and Acceptance Testing of Mine Refrigeration Plants

    There is an increasing demand for refrigeration as mines progress deeper. Mine refrigeration plants have special requirements in terms of their duty and application. There are no national or internati

    Jan 1, 2005

  • AUSIMM
    The importance of rate of rise in life-of-mine planning of an upstream raised tailings storage facility – a case study

    By D A. Williams, P J. Chapman

    The acceptable rate of rise of the tailings beaches on upstream-raised tailings storage facilities (TSFs) is critical to life of mine planning. This is illustrated through a case study in Western Aus

    Jul 23, 2018

  • AUSIMM
    Sustainable Development and the Minerals Sector ù Leaving a Lasting Legacy

    By L Chaffey, M Buckland

    The minerals industry has enormous potential to positively contribute to sustainable development and many leading companies have concluded that their long-term success is directly linked to their abil

    Jan 1, 2006

  • AUSIMM
    Process Implications of Ferrolysis in Hyper-Saline Water

    By J Bean

    Iluka Resources Ltd developed the Jacinth-Ambrosia Mine (Jacinth) in the Eucla Basin during 2009 and 2010. In this arid climate the operation relies on hyper-saline groundwater from a palaeochannel fo

    Oct 5, 2011

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • AUSIMM
    Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the Congo

    By M G. Millad, M Zammit

    The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa

    Aug 18, 2014

  • AUSIMM
    Interactions between Flash Flotation and Gravity Concentration – An Industrial Case Study of a Refractory Gold Concentrator

    By D Semini, B Newcombe

    Base-metal sulfide refractory gold ores often contain a portion of ‘free’ gold that is amenable to recovery using gravity concentration methods, whilst the refractory portion of the gold is better rec

    Sep 1, 2014

  • AUSIMM
    Geophysical Studies of Rift Structures and Dynamics

    Teleseismic travel time residuals measured on 600-1000 km seismic arrays across the Rio Grande and East African rifts provide evidence for upper mantle low velocity zones beneath each rift of velo

    Jan 1, 1987

  • AUSIMM
    The Energy Equation-Coal

    This paper covers only the energy uses of natural resources and does not deal with non- energy uses, which in 1975 were of the order of 10 per cent of the total consumption of energy resources. The

    Jan 1, 1978

  • AUSIMM
    Tailings process optimisation through automation and controls integration

    By R Williams, M Baxter, D Zink, R Cunningham

    The purpose of this paper is to discuss the efficient operation of a tailings dewatering circuit comprising a thickener and filter press through proper control and automation. It is common to see thi

    Jul 23, 2018

  • AUSIMM
    Recovery-by-size Kinetic Analysis to Determine Where Metallurgical Improvements Occur When Converting to High-chrome Grinding Media

    By C J. Greet, S Jacques

    In most instances, the application of high-chrome grinding media results in an increase in the recovery of the valuable mineral(s). The authors have published data from a number of plant-based case st

    Sep 1, 2014

  • AUSIMM
    Slag-metal interfacial reactions in pyrometallurgical processing of industrial wastes for recovery of valuable metals

    By J H. Park, R R. Kim, H S. Park, H J. Kim

    This study focuses on the recovery of valuable metals, specifically silver (Ag) and palladium (Pd), from copper-containing sludge (with copper content less than 20 per cent) generated during PCB proce

    Jun 19, 2024

  • AUSIMM
    Magnetic Conditioning at the Hellyer Tailings Retreatment Plant

    By B Lumsden

    During periods of high metal prices and strong metal demand tailings retreatment can be economic. Most tailings retreatment operations are technically challenging, low margin operations, because the e

    Jan 1, 2009

  • AUSIMM
    Independent Decline Haulage at Kanowna Belle Gold Mines

    In May 2000, Kanowna Belle Gold Mines (KBGM) carried out a detailed Truck versus Shaft Haulage Study. The study showed that whilst the shaft option had many operating cost benefits the capital costs w

    Jan 1, 2002

  • AUSIMM
    Geometallurgical Modelling of the Dumont Deposit

    By M Sciortino, J Korczak, J Muinonen, A St-Jean

    The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir

    Sep 29, 2013

  • AUSIMM
    Continuous Monitoring of Mechanised Breaker Line Supports to Investigate Roof and Pillar Behaviour (11th International Conference on Ground Control in Mining)

    By Medhurst TP, Trueman R, Hutchinson IN

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.] Colliery, Queensland. This system was designed

    Jan 1, 1992

  • AUSIMM
    Making a positive change – evolving the modern Integrated Remote Operations Centre (IROC) to optimise and support carbon-neutral value chains

    By G McCullough, J Els, J Bassan

    Integrated Remote Operations Centres (IROCs) have a crucial role in optimising a mine’s carbon emissions, especially as industry faces an imperative to achieve net-zero emissions on an accelerated tim

    Sep 18, 2023

  • AUSIMM
    Simulation Aided Engineering – Integration of Monitoring, Modelling and Planning

    By D Beck

    Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o

    Mar 21, 2011

  • AUSIMM
    Theory of Sampling meets the National Science Foundation I-Corps™ program

    By V Rodríguez, M Hormaza, R J. Romañach, C Pinzón-de la Rosa

    The authors have presented their ideas for developing a powder sampling device in the I-Corps™ program sponsored by the National Science Foundation (NSF). This is an intensive customer discovery progr

    May 9, 2017

  • AUSIMM
    State-of-the-art of electroslag refining and challenges in the control of ingot cleanness

    By G Stovpchenko, G Jianjun, L Medovar

    Electroslag remelting (ESR) today and into the future, will still be the main process for producing high-quality ingots by suppressing segregation, not just refining chemical composition from impuriti

    Jun 19, 2024