Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Concrete Overbreak Estimation and Analysis Errors in Bored Piles

    By Nuno Cruz

    "The concrete overbreak estimation for bored piles provides the quantification of the shaft’s expansion beyond its theoretical volume. There are stability analysis methods that can be employed before

    Jan 1, 2017

  • DFI
    Issues In The Performance-Based Seismic Evaluation Of Sheet Pile Quay Walls

    By Dimitris Pachakis

    In this paper, the authors give a brief overview of the current practice guidelines and tools for the seismic design of sheet pile quay walls, emphasizing how the design guidelines are lacking when th

    Jan 1, 2011

  • DFI
    The Development and State of Practice of Cutter Soil Mixing in North America – The First 10 Years

    By Brian Wilson, Franz-Werner Gerressen

    "Cutter Soil Mixing, also known as CSM, was developed in Europe as an alternate method of Deep Mixing to the more traditional single and multiple auger techniques, and brought to market by Bauer Masch

    Jan 1, 2015

  • DFI
    Performance Of A Large Diameter Drilled Pier (f4c3f0c8-a45b-48d0-8d0a-138a34a08ce3)

    By A. J. Partos

    The figures and tables referred to herein are presented in the Proceedings; Volume I, Pages 309 through 316. The 61-story One Liberty Place, at 315 m., is the tallest building 1n Philadelphia and

    Jan 1, 1991

  • DFI
    Understanding The Vibratory Pile Driver/Extractor: A Field Man's Perspective - 1. What Is A Vibro Driver/Extractor And How Does It Work?

    By John L. White

    The vibro driver/extractor is a machine that grips to a pile and vibrates it up and down. When the vibrating pile is lowered into the ground, all soil around the pile begins to vibrate. A vibrating pi

    Jan 1, 1990

  • DFI
    Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore (97785a40-c93d-4648-ae71-8e34822bf6ed)

    By George C. Webb

    A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in

    Jan 1, 2003

  • DFI
    Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)

    By Lori A. Simpson, Linda H. Liang

    A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T

    Jan 1, 2017

  • DFI
    Building A High-Rise Adjacent To Transit Tunnels In San Francisco

    By Lori A. Simpson

    A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.

  • DFI
    Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore

    By George C. Webb

    A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in

    Jan 1, 2005

  • DFI
    Nearshore Pile Construction Experience In Burnie, Tasmania

    By Thomas W. Scott, Manh N. Tran

    Marine environments present a range of challenges for pile construction. This paper contains a discussion on the design and construction of marine piles for a recent Toll Shipping wharf upgrade in Bur

    Nov 1, 2022

  • DFI
    Case Histories of Circular Secant Pile Access Shafts for Tunnels

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The

    Jan 1, 2019

  • DFI
    Working Platforms In Geotechnical Jobs: Recommendations For Execution And Maintenance

    By Gustavo Armijo

    Slippery and unstable working platforms spoiled not only by natural weather conditions but also by the effects of the construction process (drilling mud, grout slurry) are among the main sources of ha

    Jan 1, 2006

  • DFI
    The Contest On The Prediction Of Capacity Of A Bored Pile Constructed Under Polymer-Based Slurry In Bangkok Subsoil

    By Narong Thasnanipan

    This paper presents the outcome of the contest on the prediction of the static axial load capacity of diameter 1.20m bored pile founded at 46m below existing ground. The test pile was constructed by w

    Jan 1, 2006

  • DFI
    Behavior Of PCC Pile Under Lateral Load

    By Zhitao Ma

    The Cast-in-place Concrete thin-wall Pipe pile, referred to as PCC pile, is a new kind of pile for soft ground improvement. In this paper, firstly, the general introductions of the new pile technique,

    Jan 1, 2006

  • DFI
    Ultimate Uplift Capacity Of Single And Group Piles In Clay ? Synopsis

    By B. M. Das

    Several laboratory model test results for the determination of the ultimate uplift capacity of single and group metal piles embedded in near-saturated clay have been presented. Based on the uplift tes

    Jan 1, 2010

  • DFI
    Lower Risks With ECR®/EFT®-Measurements In Underground Constructions

    By Patrick P. A. Wolfs

    In the summer of 2000, the ECR®/EFT® was first introduced in the Netherlands. After the first project a field test was performed together with other geophysical methods to prove the liability of these

    Jan 1, 2006

  • DFI
    Analysis And Performance Of Sheet Pile Cofferdam Under Demolition Blast Loads

    By Michael Oakland

    This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn

  • DFI
    Analysis and Performance of Sheet Pile Cofferdam under Demolition Blast Loads

    By John Mould, Gordon Chen, Michael Oakland, William McElwee

    "This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn

    Jan 1, 2017

  • DFI
    Prediction Of Settlement Of Structure With Piled-Raft Foundation Using Nodular Piles

    By Koichi Kobayashi

    Performance-based approach to design of structures including foundations was adopted after enforcement of the revised Building Standard Law in Japan in 2000. The use of piled-raft foundation is favora

    Jan 1, 2006

  • DFI
    Resistance Factors For Lateral Design Of Drilled Shafts Supporting Sound Walls

    By Ke Yang

    Drilled shafts are widely used as foundation system for sound walls to resist lateral loads. The design method based on the ultimate lateral capacity, such as Broms method, is often used for sound wal

    Jan 1, 2007