Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Extraction Of Silicomanganese From Marine And Low Grade Mineral ResourcesBy T. C. Alex, K. M. Godiwalla, R. K. Jana
Manganese nodule, available in ocean beds, is a potential resource of the future for copper, nickel and cobalt. Recovering only these metals, containing less than 3% by weight, will result in the gene
Jan 1, 2007
-
Diamond Value Management - Knowledge Management And The Measurement Of Value AdditionBy P. J. Rider
Diamond Value Management?s objective is to achieve $/ton revenue improvement across De Beers group mines. The respective %improvement contributions are measured against targets set by each of the oper
Jan 1, 2003
-
The Effect Of The Proposed Royalty Billon Mineral Property Values - IntroductionBy E. V. Lilford
The South African Minerals Development Act (?the Act?) has been promulgated and will come into full force and effect once it is gazetted. Thereafter, all Old Order mineral rights will have to be conve
Jan 1, 2003
-
The Past, Present And Future Of Shotcrete At Elandsrand Gold MineBy K. Collett
Elandsrand started shotcreting back in 1991. This paper will share the experiences of the mine by looking into the past, the present situation and the way Elandsrand plans to approach the future. It l
Jan 1, 1998
-
Preliminary Study Into A Mechanized Resue Mining Method For Deep Level MiningBy R. G. B. Pickering
Resue mining was practiced extensively in the East Rand in the first half of this century. The obvious benefits were that a higher grade of ore was trammed to the surface. The disadvantages were slow
Jan 1, 2000
-
Sulphuric Acid Plant Water Saving OptionsBy R. J. Forzatti
The production of sulphuric acid from sulphur generates heat. The majority of this heat is recovered as steam and is often used to generate electricity. Heat not recovered as steam is rejected to cool
Jan 1, 2014
-
Improving The Trough Opening Process At Premier Mine Utilizing Electronic Delay DetonatorsBy H. Möhle
Premier Mine is a large underground diamond mine, situated at Cullinan in the Gauteng Province of South Africa. The mine hoists over 3 millions tons of diamond bearing kimberlite per year, from a mode
Jan 1, 2000
-
Cyanide Control In The Metallurgical Process Of Gold Extraction In AngloGold (S.A.)By B. J. Vorster
AngloGold South Africa region currently consists of twelve gold plants. These plants use a combined total of $20 million of cyanide per annum. Of this, the major portion (60%) is consumed at two Ergo
Jan 1, 2001
-
Slope Optimization At Escondida Norte Open PitBy Manuel Rapiman, Ricardo Sepulveda
The feasibility study of Escondida Norte (ENorte), recommended a slope angle design for the Final Pit. But, according to the experience obtained with the slope adjacent to the West wall of ENorte, in
Jan 1, 2006
-
Extending Zinc Production Possibilities Through Solvent ExtractionThe Modified Zincex® Process, developed by Técnicas Reunidas, is highly flexible dealing with a wide range of pregnant leach solutions. No matter if those solutions are produced from primary or second
Jan 1, 2002
-
Hot Work Modelling Of Two Equivalent Low Carbon Strip Steels Produced, Respectively, By The Cold Charge Route And By The Hot Charge RouteBy W. Stumpf
Mean flow stress analyses from plant mill logs for the conventionally produced hot rolled low carbon steel from the Ispat Iscor Vanderbijlpark strip producing plant, indicated a higher temperature sen
Jan 1, 2004
-
The Design And Implementation Of The Top Of Block 4 (TOB 4)/Bop Resource At Finsch Mine (A Division Of Central Mines)By V. Mathebula
Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree The purpose of this study is to establish whether to mine the Bottom of Pit (BOP)/TOB 4 reserv
Jan 1, 2004
-
The Effect of Solids Suspended in a Nickel Electrolyte on Deposit MorphologyBy K. G. Matshika
"Nickel electroplating from sulphate electrolyte is an efficient process. To achieve good quality cathode, however, parameters such as temperature, nickel concentration, pH, electrode alignment, elect
Jan 1, 2015
-
Factors Affecting The Quality Of Tunnel Infrastructure At Premier Diamond MineBy M. S. Smith
Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree The condition of tunnels at Premier has deteriorated to such an extent that an objective viewpo
Jan 1, 2004
-
Time-Dependent Tunnel Deformation At Hartebeestfontein MineBy J. D. Bosman
The problems associated with squeezing rock conditions in tunnels are well known and have been extensively investigated in the past. Although squeezing conditions are predominantly found in tunnels de
Jan 1, 2000
-
Cu-Removal From The Skorpion Circuit Using Emew® TechnologyBy I. Ewart, E. Roux
Skorpion Zinc operates a solvent extraction/electrowinning zinc plant producing over 150 000 t/a of special high grade (SHG) zinc (>99.995% Zn). In the current flow sheet copper and cadmium are cement
Jan 1, 2007
-
Accelerated Kimberlite Weathering - The Role Of Cation Type On The Settling Behaviour Of FinesBy E. T. Boshoff
Paper written on project work carried out in partial fulfilment of B. Eng. (Metallurgical Engineering) The weathering of kimberlite can be accelerated with cations in solution if swelling of the ki
Jan 1, 2005
-
Viscoplastic behaviour of and damage to rock related to the design of underground waste depository cavitiesBy A. Bouvard, N. Hoteit, E. Boidy, F. Pellet
In the context of the construction of an Underground Research Laboratory devoted to the feasibility studies of radioactive waste deposits, it appears of the utmost importance to study the long-term be
Jan 1, 2003
-
Predicting Coal Pillar Life In South AfricaBy J. N. Van der Merwe
The data base of failed coal pillars in South Africa was analysed with regard to the time of failure in an effort to develop a method to predict how long after their formation coal pillars will fail.
Jan 1, 2003
-
VAT and professional servicesBy Ian MacKenzie
Over the past twelve years, professionals such as architects, engineers, accountants, and attorneys have not had to pay a great deal of attention to GST. The fees charged to clients (outputs) have no
Jan 1, 1990