Slope Optimization At Escondida Norte Open Pit

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 14
- File Size:
- 2837 KB
- Publication Date:
- Jan 1, 2006
Abstract
The feasibility study of Escondida Norte (ENorte), recommended a slope angle design for the Final Pit. But, according to the experience obtained with the slope adjacent to the West wall of ENorte, in which Compañia Minera Zaldívar (CMZ) gained in its phase 4, a slope of similar geotechnical characteristics will be exposed in the West Wall of Phase 1 (Premine) and of the Final Pit, with an interramp angle 53º and with very good stability results. In this regard, Minera Escondida Ltd. (MEL) performed a study of the slope angles for the phases mentioned and according to this delivered the results of this evaluation, the recommendations and/or the necessary conclusions in the design to ensure that the slopes are stable enough and may enable safe operational management of them.
Citation
APA:
(2006) Slope Optimization At Escondida Norte Open PitMLA: Slope Optimization At Escondida Norte Open Pit. The Southern African Institute of Mining and Metallurgy, 2006.