Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Collaborative development of mine ready electric vehicle

    By H Guthrie, J Hodder, J Bain, S Durkin

    Australian mines have traditionally relied on diesel powered vehicles to fulfil their light vehicle needs. There are many reasons for the resources industry to review its use of diesel-powered vehicle

    Mar 15, 2021

  • AUSIMM
    Geophysical Studies of Rift Structures and Dynamics

    Teleseismic travel time residuals measured on 600-1000 km seismic arrays across the Rio Grande and East African rifts provide evidence for upper mantle low velocity zones beneath each rift of velo

    Jan 1, 1987

  • AUSIMM
    Design and Engineering of Flotation Circuits (in Australia)

    By D Mcleod, S Brindley, S Green

    The design and engineering of flotation circuits is driven by numerous inputs, including (in no particular order) testwork outcomes, site considerations, type of separation required, energy sensitivit

    Jan 1, 2005

  • AUSIMM
    Presidential Address 1984 - There are Also Small Mines

    My roots span four generations. My great grandfather, Christian Frederick Fisher, along with twenty-one others was drowned in the New Australasian mine disaster at Creswick in Victoria in 1882. My gra

    Jan 1, 1984

  • AUSIMM
    Tunnelling within the Bunya Phyllite of Legacy Way, Brisbane, Queensland

    By M Norbert, C Bennett

    The Legacy Way Tunnel was constructed from Toowong to Kelvin Grove in Brisbane, and is the first large-scale underground excavation in the Bunya Phyllite in Brisbane. The Legacy Way Tunnel is 4.3 km i

    Sep 17, 2014

  • AUSIMM
    The Thermodynamics of Zinc Oxide in Iron Silicate Slags

    By Lee H. G, Li H, Hayes P

    Slag from the smelting of lead can contain up to 20 per cent zinc as an oxide. An understanding of the lead smelting process and of the subsequent fuming process for the recovery of zinc is enhanced

    Jan 1, 1993

  • AUSIMM
    Selecting Optimal Operating Conditions for Knelson Concentrators

    By G K. N Subasinghe

    Metallurgists operating Knelson Concentrators (KC) often rely on manufacturerÆs recommendations for selecting operating parameters, such as fluidising water flow rate and cycle time. Recent studies ha

    Jan 1, 2006

  • AUSIMM
    Potential for Future Developments Outside of Existing Fields in the Gippsland Basin

    By MacLean L

    In 1975 the Commonwealth Government established import parity pricing for all liquid hydrocarbons discovered after the 16th September, 1975. These discoveries were termed "new oil" to differentiate

    Jan 1, 1982

  • AUSIMM
    Firedamp Drainage Installations

    Firedamp drainage has become an essential part of many mine environmental systems, and new applications are arising. Installations are evolving further to satisfy ever changing basic requirements,

    Jan 1, 1982

  • AUSIMM
    Primary Magmatic Segregation Deposits In New Zealand, Their Characteristics And Tectonic Setting (eb79e30b-35c9-417c-bdb6-fc9df23ae532)

    Mineral deposits in New Zealand whose origin can be ascribed to primary magmatic segregations are associated with mafic-ultra- mafic complexes related to two orogenic episodes which took place durin

    Jan 1, 1980

  • AUSIMM
    Increasing Production Control Through Reliable Geological Predictive Techniques

    By English W, Poppit I

    COALEX Pry Limited operates two underground steaming coal mines on the western edge of the Sydney Basin near Lithgow, New South Wales. Baal Bone Colliery uses longwall technology for an output of over

    Jan 1, 1991

  • AUSIMM
    The Implementation of Paste Fill at the Henty Gold Mine (e808b65b-096a-41b0-a461-dc39eb272114)

    By Jardine G, Woodall C

    The Henty Gold Mine, located in Western lasiuania use, uuiusatise solutions to effectively manage a mining operation in an environmentally sensitive setting and has been presented with several envir

    Jan 1, 1998

  • AUSIMM
    No. 3 Changehouse

    With the sinking of the No. 3 Shaft at North Broken Hill Limited, it was necessary to construct adjacent to the shaft a new changehouse for mining and surface personnel.It was also probable that as th

    Jan 1, 1957

  • AUSIMM
    The HydroFloat Separator ù A New Technology for Recovering Coarse Phosphate Sands

    By T C. Westerfield, G, M J. Mankosa

    An innovative separator known as the HydroFloat cell has been developed specifically for the upgrading of coarse particles that are difficult to recover using conventional flotation cells. The novel c

    Jan 1, 2005

  • AUSIMM
    The Development and Integration of a Carbon-In-Pulp Gold Circuit within the Kambalda Nickel Concentrator

    The reasons for and the methods of inte- gration of the gold treatment plant with the existing nickel concentrator are discussed. The integration was accomplished in three stages commencing in May 1

    Jan 1, 1984

  • AUSIMM
    Weak Acid Dissociable Cyanide Analysis Required for International Cyanide Management Code (ICMI) Compliance û Recent Refinements to an Online Weak Acid Dissociable Cyanide Measurement Device

    By H S. Smit, P Lotz

    Gold mining companies who are signatories of the International Cyanide Management Code (visit www.cyanidecode.org for further information) are required to measure WAD cyanide on-line and destroy WAD c

    Jan 1, 2008

  • AUSIMM
    An Integrated Underground Mining Approach to the Structural Complexity of the Empire Vein System, Golden Cross Mine, New Zealand

    By Barber S

    The Golden Cross Mine is located within the Waitekauri Valley near the southern end of the Coromandel Ranges, eight kilometres north-west of Waihi, North Island, New Zealand. The mine is owned and o

    Jan 1, 1997

  • AUSIMM
    The Geometry and Petrography of Stockwork Vein Swarms, Macraes Mine, Otago Schist, New Zealand

    By D Craw

    The Macraes gold deposit is located in a low angle NE dipping (~15¦) shear zone, the Hyde Macraes Shear Zone (HMSZ) cutting greenschist facies metasediments of the Otago Schist. The shear zone is host

    Jan 1, 2004

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Concept and Operation of the New Conventional Cell House of Asturiana de Zinc at San Juan de Nieva, Spain

    By LefTvre Y

    In May 1991, AZSA commissioned a new conventional Cell House. This paper focuses on the major improvements introduced in the design and the construction of the equipment, machinery and control. An e

    Jan 1, 1993