Search Documents

  • DFI
    Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management

    By Mario Aiezza

    This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto

    Jan 1, 2002

  • AUSIMM
    Off-Grid Solar in the Mining Sector - Can Renewable Energy Reduce your Operating Costs?

    By C Chambers

    "AustraliaÆs mining sector faces challenges to its competitiveness; operating costs are being adversely affected as a result of volatile commodity prices and growing international market pressures.Die

    Jul 15, 2013

  • SAIMM
    Estimation of joint behaviour by monitoring and analysis in the rock cavern

    By T. Maejima, K. Aoki, T. Mori, K. Iwano

    Concerning the excavation of rock cavern, it is one of the most important issues to evaluate the behavior of rock joints. But few detailed measurements for joint behavior had been conducted. Therefor

    Jan 1, 2003

  • CIM
    Impact and Benefit Agreements: Are they working?

    By Jason Rrno

    The emergence of Impact and Benefit Agreements (IBAs) in the Canadian mining sector has been read by many as a positive governance innovation. Negotiated directly between mineral resource developers a

    May 1, 2010

  • IIMP
    Sistemas de información en planta

    By José Arango

    La Planta Hidrometalúrgica de Cerro Verde tiene como objetivo alcanzar la máxima calidad en cada uno de sus procesos operativos. Para ello, desarrolla un diseño que permita la transformación del contr

    Jul 17, 2000

  • CIM
    An Overview of the Oil Sands Process, Comparing it to Conventional Mineral Processing

    By Gavin Ritson, Chris Ward

    "The oil sands industry is still fairly young with the first viable oil sand operation having been started in Alberta in 1960. Since then numerous modifications and improvements have been tried and im

    Jan 1, 2009

  • NIOSH
    IC 8584 Mechanical Properties And Cutting Characteristics Of Coal

    By Parviz F. Rad

    This Bureau of Mines report reviews laboratory and in-mine techniques for determining mechanical properties of coals, with special emphasis on the relationship between these properties and the minabil

    Jan 1, 1973

  • SME-ICGCM
    Determination Of Horizontal Stress Direction By Underground Mine Mapping (2f4eaf66-10ce-4f4d-9f7a-64c6c21e6400)

    By S. E. Phillipson

    Underground mine mapping is a critical component of understanding the controls on ground instability. Many relatively localized examples of ground failure are associated with geologic features, such

    Jan 1, 2009

  • SME
    Rare elements in seafloor massive sulfides of the Semyenov hydrothermal cluster, Mid-Atlantic Ridge

    By Georgy Cherkashov, Svetlana Babaeva, Tamara Stepanova, Firstova. Anna

    Seafloor massive sulfides (SMS) study in the Russian Exploration Area at the northern equatorial Mid Atlantic Ridge began after signing the contract with International Seabed Authority in 2012. In ord

    Sep 1, 2014

  • SAIMM
    Some Considerations On Future Developments In Ferro-Alloy Furnaces

    By I. J. Barker

    Keywords: Submerged-arc furnace, plasma furnace, d.c. furnace, scale up, Søderberg electrodes, smart grid, demand side management, load shedding This paper argues that the scale up of furnaces and

    Jan 1, 2011

  • AUSIMM
    Paringa Clean-up Practice

    The purpose of this paper is to describe briefly the clean-up procedure adopted at the treatment plant of Paringa Mining & Exploration Co. Ltd. at Kalgoorlie, Western Australia.A clean-up is carri

    Jan 1, 1941

  • TMS
    Fe-Ni Alloys Formation in Carbonthermal Reduction Process using Laterite Nickel Ore

    By Jilai Xue

    Fe-Ni alloys can be used as raw material in making stainless steel. Laterite nickel ore is one of mineral resources for producing nickel alloys. In this work, the laterite ore after dehydration at 800

    Jan 1, 2010

  • DFI
    Water Tightness Of Diaphragm Walls

    By Radianto Elprama

    For the realisation of the underground railway line RandstadRail in the city area of Rotterdam a bored tunnel is under construction. Diaphragm walls up to a depth of about 40 m were used to construct

    Jan 1, 2006

  • SME
    Measurement Of Weak And Dissociable (Wad) Cyanide With A Modified Potentiometric Titration

    By M. Botz

    For leach solutions containing primarily free cyanide, the silver nitrate titration method is a rapid and acceptably accurate means of analyzing for cyanide. However, in leach solutions containing ele

    Feb 27, 2013

  • DFI
    Securing Rail Infrastructure in Romania

    By Andreas Brandner

    "At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors

    Jan 1, 2017

  • CIM
    Data integration for information technology infrastructure in mining

    By S. Dessureault, J. Porter, M. Woodhall

    Information and communication technology (ICT) is seen as a key source of future productivity improvements in mines. The information technology infrastructure (ITI) necessary to achieve these producti

    Jan 1, 2004

  • DFI
    The Effect Of Vertical Pile Loading On Subsequent Lateral Behaviour

    By A. Lyndon

    Vertical and lateral load tests were carried out on two 13 m deep bored cast-in-place instrumented piles, socketed into weathered sandstone. The first pile, 1200 mm in diameter, was loaded vertically

    Jan 1, 1989

  • DFI
    Construction Considerations For Ground Modification Projects ? Synopsis

    By J. P. Welsh

    Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan

    Jan 1, 2010

  • NIOSH
    Empirical Design of Span Openings in Weak Rock based upon Support Type Employed

    By A. M. Ouchi

    Existing empirical design tools have been developed from fair-to-good quality rock masses (RMR76 >50). This paper presents a focus of ground control research presently being conducted by the Roc

    Jan 1, 2008

  • NIOSH
    IC 8767 Guide For The Construction Of Driven-Rod Ground Beds

    By R. L. King

    This report describes a method for designing and constructing ground beds that has been developed under the sponsorship of the Bureau of Mines. The procedures for designing and constructing a driven-r

    Jan 1, 1978